m |
m |
||
Line 538: | Line 538: | ||
1. Suitability | 1. Suitability | ||
:1.1. General | :1.1. General | ||
− | :1.2. Function Within Stormwater Treatment Train | + | :1.2. [[Overview for stormwater ponds|Function Within Stormwater Treatment Train]] |
− | :1.3. MPCA Permit Applicability | + | :1.3. [[Overview for stormwater ponds|MPCA Permit Applicability]] |
− | :1.4. Design Variants | + | :1.4. [[Types of stormwater ponds|Design Variants]] |
− | ::1.4.1. Flow-through pond (no extended detention) | + | ::1.4.1. [[Types of stormwater ponds|Flow-through pond (no extended detention)]] |
Stormwater Ponds Overview | Stormwater Ponds Overview | ||
− | ::1.4.2. Wet extended detention pond | + | ::1.4.2. [[Types of stormwater ponds|Wet extended detention pond]] |
− | ::1.4.3. Micropool extended detention pond | + | ::1.4.3. [[Types of stormwater ponds|Micropool extended detention pond]] |
− | ::1.4.4. Dry pond | + | ::1.4.4. [[Types of stormwater ponds|Dry pond]] |
− | :1.5. Retrofit Suitability | + | :1.5. [[Overview for stormwater ponds|Retrofit Suitability]] |
− | :1.6. Special Receiving Waters Suitability | + | :1.6. [[Overview for stormwater ponds|Special Receiving Waters Suitability]] |
− | :1.7. Cold Climate Suitability | + | :1.7. [[Overview for stormwater ponds|Cold Climate Suitability]] |
− | :1.8. Water Quantity Treatment | + | :1.8. [[Overview for stormwater ponds|Water Quantity Treatment]] |
− | :1.9. Limitations | + | :1.9. [[Overview for stormwater ponds|Limitations]] |
− | 2. Major Design Elements | + | 2. [[Design criteria for stormwater ponds|Major Design Elements]] |
− | :2.1. Physical Feasibility Initial Check | + | :2.1. [[Design criteria for stormwater ponds|Physical Feasibility Initial Check]] |
− | :2.2. Conveyance | + | :2.2. [[Design criteria for stormwater ponds|Conveyance]] |
− | ::2.2.1. Inflow Points | + | ::2.2.1. [[Design criteria for stormwater ponds|Inflow Points]] |
− | ::2.2.2. Adequate Outfall Protection | + | ::2.2.2. [[Design criteria for stormwater ponds|Adequate Outfall Protection]] |
− | :2.3. Pre-treatment | + | :2.3. [[Design criteria for stormwater ponds|Pre-treatment]] |
− | :2.4. Treatment | + | :2.4. [[Design criteria for stormwater ponds|Treatment]] |
− | ::2.4.1. Permanent Pool and Water Quality Volume (Vwq) Sizing for New Impervious Area | + | ::2.4.1. [[Design criteria for stormwater ponds|Permanent Pool and Water Quality Volume (Vwq) Sizing for New Impervious Area]] |
− | ::2.4.2. Pond Liners | + | ::2.4.2. [[Design criteria for stormwater ponds|Pond Liners]] |
− | ::2.4.3. Grading and Site Layout | + | ::2.4.3. [[Design criteria for stormwater ponds|Grading and Site Layout]] |
− | ::2.4.4. Pond Benches | + | ::2.4.4. [[Design criteria for stormwater ponds|Pond Benches]] |
− | ::2.4.5. Maintenance Access | + | ::2.4.5. [[Design criteria for stormwater ponds|Maintenance Access]] |
− | ::2.4.6. Riser in Embankment | + | ::2.4.6. [[Design criteria for stormwater ponds|Riser in Embankment]] |
− | ::2.4.7. Spillway Design | + | ::2.4.7. [[Design criteria for stormwater ponds|Spillway Design]] |
− | ::2.4.8. Non-clogging Low Flow Orifice | + | ::2.4.8. [[Design criteria for stormwater ponds|Non-clogging Low Flow Orifice]] |
− | ::2.4.9. Trash Racks | + | ::2.4.9. [[Design criteria for stormwater ponds|Trash Racks]] |
− | ::2.4.10. Pond Drain | + | ::2.4.10. [[Design criteria for stormwater ponds|Pond Drain]] |
− | ::2.4.11. Adjustable Gate Valve | + | ::2.4.11. [[Design criteria for stormwater ponds|Adjustable Gate Valve]] |
− | ::2.4.12. Riser Access | + | ::2.4.12. [[Design criteria for stormwater ponds|Riser Access]] |
− | ::2.4.13. Emergency Spillway | + | ::2.4.13. [[Design criteria for stormwater ponds|Emergency Spillway]] |
− | :2.5. Landscaping | + | :2.5. [[Design criteria for stormwater ponds|Landscaping]] |
− | ::2.5.1. Landscaping Plan | + | ::2.5.1. [[Design criteria for stormwater ponds|Landscaping Plan]] |
− | ::2.5.2. Pond Buffers and Setbacks | + | ::2.5.2. [[Design criteria for stormwater ponds|Pond Buffers and Setbacks]] |
− | :2.6. Safety | + | :2.6. [[Design criteria for stormwater ponds|Safety]] |
3. Construction Details and Specifications<br> | 3. Construction Details and Specifications<br> | ||
− | 4. Operation and Maintenance | + | 4. [[Operation and maintenance of stormwater ponds|Operation and Maintenance]] |
− | :4.1. Overview | + | :4.1. [[Operation and maintenance of stormwater ponds|Overview]] |
− | :4.2. Design Phase Maintenance Considerations | + | :4.2. [[Operation and maintenance of stormwater ponds|Design Phase Maintenance Considerations]] |
− | :4.3. Construction Phase Maintenance | + | :4.3. [[Operation and maintenance of stormwater ponds|Construction Phase Maintenance]] |
− | :4.4. Post-Construction Operation and Maintenance | + | :4.4. [[Operation and maintenance of stormwater ponds|Post-Construction Operation and Maintenance]] |
− | ::4.4.1. Operation to Address Frozen Conditions | + | ::4.4.1. [[Operation and maintenance of stormwater ponds|Operation to Address Frozen Conditions]] |
− | ::4.4.2. Maintenance | + | ::4.4.2. [[Operation and maintenance of stormwater ponds|Maintenance]] |
− | 5. Cost Considerations | + | 5. [[Cost-benefit considerations for stormwater ponds|Cost Considerations]] |
− | :5.1. Construction and Maintenance Costs | + | :5.1. [[Cost-benefit considerations for stormwater ponds|Construction and Maintenance Costs]] |
− | 6. Design Procedure | + | 6. [[Design criteria for stormwater ponds|Design Procedure]] |
− | :6.1. Design Steps | + | :6.1. [[Design criteria for stormwater ponds|Design Steps]] |
7. Links to Other Manuals<br> | 7. Links to Other Manuals<br> | ||
8. References | 8. References | ||
Line 724: | Line 724: | ||
2. BMP Constraints & Design Criteria for Special Soil/Geologic Conditions | 2. BMP Constraints & Design Criteria for Special Soil/Geologic Conditions | ||
:2.1. Background | :2.1. Background | ||
− | :2.2. Karst | + | :2.2. [[Karst|Karst ]] |
− | ::2.2.1. General Stormwater Management Guidelines for Karst Areas | + | ::2.2.1. [[Karst|General Stormwater Management Guidelines for Karst Areas]] |
− | ::2.2.2. Investigation for Karst Areas | + | ::2.2.2. [[Karst|Investigation for Karst Areas]] |
− | ::2.2.3. Subsurface Material | + | ::2.2.3. [[Karst|Subsurface Material]] |
− | ::2.2.4. Geophysical and Dye Techniques | + | ::2.2.4. [[Karst|Geophysical and Dye Techniques]] |
− | ::2.2.5. Sinkhole Remediation | + | ::2.2.5. [[Karst|Sinkhole Remediation]] |
− | ::2.2.6. Monitoring of BMPs in Karst Regions | + | ::2.2.6. [[Karst|Monitoring of BMPs in Karst Regions]] |
− | :2.3. Shallow Bedrock and Ground Water | + | :2.3. [[Shallow soils and shallow depth to bedrock|Shallow Bedrock and Ground Water]] |
− | ::2.3.1. General Stormwater Management Guidelines for Areas with Shallow Bedrock and Soils | + | ::2.3.1. [[Shallow soils and shallow depth to bedrock|General Stormwater Management Guidelines for Areas with Shallow Bedrock and Soils]] |
− | ::2.3.2. Investigation for Shallow Bedrock Areas | + | ::2.3.2. [[Shallow soils and shallow depth to bedrock|Investigation for Shallow Bedrock Areas]] |
− | ::2.3.3. Subsurface Material | + | ::2.3.3. [[Shallow soils and shallow depth to bedrock|Subsurface Material]] |
− | ::2.3.4. Shallow Depth to Ground Water | + | ::2.3.4. [[Shallow groundwater|Shallow Depth to Ground Water]] |
− | :2.4. Soil with Low Infiltration Capacity | + | :2.4. [[Soils with low infiltration capacity|Soil with Low Infiltration Capacity]] |
− | ::2.4.1. General Stormwater Management Guidelines for Sites with Low Infiltration Capacity Soils | + | ::2.4.1. [[Soils with low infiltration capacity|General Stormwater Management Guidelines for Sites with Low Infiltration Capacity Soils]] |
− | ::2.4.2. Investigation for Low Infiltration Capacity Soils | + | ::2.4.2. [[Soils with low infiltration capacity|Investigation for Low Infiltration Capacity Soils]] |
3. Runoff Source Constraints | 3. Runoff Source Constraints | ||
− | :3.1. Potential Stormwater Hotspots (PSHs) | + | :3.1. [[Potential stormwater hotspots|Potential Stormwater Hotspots (PSHs)]] |
− | ::3.1.1. Background | + | ::3.1.1. [[Potential stormwater hotspots|Background]] |
− | ::3.1.2. Designation of PSHs | + | ::3.1.2. [[Potential stormwater hotspots|Designation of PSHs]] |
− | ::3.1.3. Pollutant Generating Operations/Activities | + | ::3.1.3. [[Potential stormwater hotspots|Pollutant Generating Operations/Activities]] |
− | ::3.1.4. Stormwater Management Design at PSHs | + | ::3.1.4. [[Potential stormwater hotspots|Stormwater Management Design at PSHs]] |
− | ::3.1.5. Importance of Plan Review at Proposed PSHs | + | ::3.1.5. [[Potential stormwater hotspots|Importance of Plan Review at Proposed PSHs]] |
− | :3.2. NPDES Industrial Stormwater Requirements | + | :3.2. [[Potential stormwater hotspots|NPDES Industrial Stormwater Requirements]] |
− | ::3.2.1. Permit Requirements | + | ::3.2.1. [[Potential stormwater hotspots|Permit Requirements]] |
− | :3.3. Guidance on Infiltration of Runoff from PSHs | + | :3.3. [[Potential stormwater hotspots|Guidance on Infiltration of Runoff from PSHs]] |
− | ::3.3.1. Background | + | ::3.3.1. [[Potential stormwater hotspots|Background]] |
− | ::3.3.2. Potential for PSH Impact on Ground Water | + | ::3.3.2. [[Potential stormwater hotspots|Potential for PSH Impact on Ground Water]] |
:3.4. BMP Sediment Quality, Testing and Disposal Guidelines | :3.4. BMP Sediment Quality, Testing and Disposal Guidelines | ||
::3.4.1. Background | ::3.4.1. Background | ||
Line 757: | Line 757: | ||
<br> | <br> | ||
− | Appendix A - Minnesota Factors | + | [[Minnesota maps|Appendix A - Minnesota Factors]] |
<br> | <br> | ||
<u>'''Appendix B - Selection of Appropriate Computer Models'''</u><br> | <u>'''Appendix B - Selection of Appropriate Computer Models'''</u><br> | ||
− | 1. Hydrologic Models | + | 1. [[Available stormwater models and selecting a model|Hydrologic Models]] |
− | :1.1. Rational Method | + | :1.1. [[Available stormwater models and selecting a model|Rational Method]] |
− | :1.2. HEC- | + | :1.2. [[Available stormwater models and selecting a model|HEC-1]] |
− | :1.3. HEC-HMS | + | :1.3. [[Available stormwater models and selecting a model|HEC-HMS]] |
− | :1.4. TR- | + | :1.4. [[Available stormwater models and selecting a model|TR-20]] |
− | :1.5. Win TR- | + | :1.5. [[Available stormwater models and selecting a model|Win TR-55]] |
− | 2. Hydraulic Models | + | 2. [[Available stormwater models and selecting a model|Hydraulic Models]] |
− | :2.1. HEC-RAS | + | :2.1. [[Available stormwater models and selecting a model|HEC-RAS]] |
− | :2.2. HEC- | + | :2.2. [[Available stormwater models and selecting a model|HEC-2]] |
− | :2.3. WSPRO | + | :2.3. [[Available stormwater models and selecting a model|WSPRO]] |
− | :2.4. CULVERTMASTER | + | :2.4. [[Available stormwater models and selecting a model|CULVERTMASTER]] |
− | :2.5. FLOWMASTER | + | :2.5. [[Available stormwater models and selecting a model|FLOWMASTER]] |
− | 3. Combined Hydraulic and Hydrologic Models | + | 3. [[Available stormwater models and selecting a model|Combined Hydraulic and Hydrologic Models]] |
− | :3.1. HydroCAD | + | :3.1. [[Available stormwater models and selecting a model|HydroCAD]] |
− | :3.2. PondPack | + | :3.2. [[Available stormwater models and selecting a model|PondPack]] |
− | :3.3. SWMM-Based Programs | + | :3.3. [[Available stormwater models and selecting a model|SWMM-Based Programs]] |
− | 4. Water Quality Models | + | 4. [[Available stormwater models and selecting a model|Water Quality Models]] |
− | :4.1. SLAMM | + | :4.1. [[Available stormwater models and selecting a model|SLAMM]] |
− | :4.2. P8 | + | :4.2. [[Available stormwater models and selecting a model|P8]] |
− | :4.3. BASINS | + | :4.3. [[Available stormwater models and selecting a model|BASINS]] |
− | :4.4. PONDNET | + | :4.4. [[Available stormwater models and selecting a model|PONDNET]] |
− | :4.5. WiLMS | + | :4.5. [[Available stormwater models and selecting a model|WiLMS]] |
− | :4.6. Bathtub | + | :4.6. [[Available stormwater models and selecting a model|Bathtub]] |
− | :4.7. WASP | + | :4.7. [[Available stormwater models and selecting a model|WASP]] |
− | 5. Supplemental Graphics:TP- and Precipitation Frequency Graphs | + | 5. [[Rainfall frequency maps|Supplemental Graphics:TP- and Precipitation Frequency Graphs]] |
<br> | <br> | ||
Line 879: | Line 879: | ||
<br> | <br> | ||
<u>'''Appendix I - Bibliography'''</u><br> | <u>'''Appendix I - Bibliography'''</u><br> | ||
− | 1. Bibliography<br> | + | 1. [[References|Bibliography]]<br> |
2. Web References | 2. Web References | ||
:2.1. Agency Web References | :2.1. Agency Web References |
You can find information from the old Manual by clicking on any of the linked items below. The topics are arranged in the exact order as in the hardback version of the Manual. The links take you to the page containing the topic you want. It does not take you directly to the section of interest. This was intentional. To find the topic of interest, scroll down on the page or use the Page Contents option in the upper right portion of the page. Topics that are not linked have not been migrated.
Chapter 1 - Use and Organization of the Manual
1. Manual Organization
2. Users of the Manual
3. The Regulatory Relationship of the Manual
4. This Manual’s Relationship to Other Manuals
5. Keep Updated About Manual Changes
6. Feedback
7. How Do I
Chapter 2 - Stormwater and the Minnesota Perspective
1. Stormwater Education
2. What is Stormwater
3. Why Stormwater Matters
4. Managing Stormwater in Minnesota
5. How This Manual Will Help
6. General Principles for Stormwater Management
7. References
Chapter 3 - Integrated Stormwater Management
1. What Is Integrated Stormwater Management?
2. Non-Structural vs. Structural BMPs
3. Link to Better Site Design
4. References
Chapter 4 - Better Site Design/Low iMpact Development
1. Introduction
2. Preserving Natural Areas
3. Disconnecting and Distributing Stormwater
5. The Benefits of Better Site Design
6. Overcoming Barriers to Better Site Design
7. Thinking Outside of the Big Box: This section does not appear in the web-based Manual
8. References
Chapter 5 - Minnesota rules, regulations and programs
1. Relationship of Manual to Regulatory Programs
2. Stormwater Programs and Permit Requirements
3. Federal Level Implementation
6. Related Information
7. References
8. Other Tables and Figures
Chapter 6 - Introduction to Best Management Practices
1. Using the Treatment Train Approach to BMP Selection
2. Using the Manual to Select BMPs
3. Retrofitting To Achieve Better Stormwater Management
4. References
Chapter 7 - Choosing Best Management Practices
1. Process for Selecting Best Management Practices
2. References
Chapter 8 - Methods and models
1. Introduction
2. Selecting a Stormwater Modeling Tool
3. Minnesota Model Input Guide
4. References
Chapter 9 - Cold climate impact on runoff management
1. Background
2. Nature of the Cold Climate Problem
3. Challenges in Engineering and Design
5. Design Adaptations for Cold Climates
6. Considerations for Design Sheets Based on Cold Climate Performance
7. References and Annotated Bibliography
8. References
9. Annotated Bibliography
Chapter 10 - Unified sizing criteria
1. Introduction
2. Overview of the Unified Stormwater Sizing Framework
3. Recharge and infiltration criterion (Vre)
5. Channel Protection Criteria (Vcp)
6. Overbank Flood Protection Criteria (Vp)
7. Extreme Flood Control Criteria (Vp)
8. Adapting Stormwater Criteria for Receiving Waters
9. Lakes
10. Trout Streams
11. Drinking Water Source Areas
12. Wetlands
13. Impaired Waters
14. Stormwater Sizing for Redevelopment Projects
15. References
Chapter 11 - Stormwater credits and development sites
1. Stormwater Credits
2. Better Site Design and Stormwater Credits
3. Stormwater Credit Categories
4. Establishing an Effective Local Stormwater Credit System
5. References
Chapter 12 - Best Management Practice details
1. Introduction
2. Fact Sheets and Design Guidance - General
3. Minnesota Design: Main Influences
4. Design Guidance - Overview
5. Design Procedures
6. The Role of Pre-Treatment
7. The Importance of Maintenance
8. References
Chapter 12-1 - Pollution Prevention Fact Sheets
Chapter 12-2 - Better Site Design / Low Impact Development
Chapter 12-3 - Runoff volume minimization
Using Compost as a Soil Amendment (Post-Construction Soil BMP)
1. Key Considerations
2. Material Specifications 3. Turf Establishment or Incorporation in Soil as an Amendment
4. Other Benefits and Emerging Uses of Compost
5. Additional Information
6. References
7. Literature Review
Green Roofs
Pervious Pavement
Rainwater Harvesting
Chapter 12-2 - Temporary erosion & sediment control
1. Introduction
2. Planning
3. Permits
4. Sequencing Activities
Temporary Erosion & Sediment Control Overview
5. Inspection and Maintenance
6. References
Chapter 12-5 - Supplemental Best Management Practices
Chemical & Biological Treatment
Filtration Devices
Hydrodynamic Devices
Chapter 12-6 - Bioretention
1. Suitability
2. Major Design Elements
3. Construction Details
4. Materials Specifications
5. Construction Specifications
6. Operation and Maintenance
7. Construction and Maintenance Costs
8. Links to other Manuals
9. References
Chapter 12-7 - Filtration
1. Suitability
2. Major Design Elements
3. Construction Details and Specifications 4. Operation and Maintenance
5. Construction and Maintenance Costs
6. Design Procedure: Media Filters
7. Design Procedure: Vegetative Filters.
8. Links to Other Manuals
9. References
Chapter 12-8 - Infiltration
1. Suitability
Infiltration Overview
2. Major Design Elements
3. Construction Details
4. Construction Specifications
5. Operation and Maintenance
6. Construction and Maintenance Costs
7. Design Procedure
8. Links to Other Manuals
9. References
Chapter 12-9 - Stormwater Ponds
1. Suitability
Stormwater Ponds Overview
3. Construction Details and Specifications
4. Operation and Maintenance
7. Links to Other Manuals
8. References
Chapter 12-10 - Stormwater Wetlands
1. Suitability
Stormwater Wetlands Overview
2. Major Design Elements
3. Construction Details and Specifications
4. Operation and Maintenance
5. Cost Considerations
6. Design Procedure
7. References
Chapter 13 - Minnesota Case Studies: Examples of BMP Design
References
Submittals
Chapter 14 - Sensitive Areas Guidance
1. Introduction
2. BMP Constraints & Design Criteria for Special Soil/Geologic Conditions
3. Runoff Source Constraints
4. References
Appendix A - Minnesota Factors
Appendix B - Selection of Appropriate Computer Models
1. Hydrologic Models
3. Combined Hydraulic and Hydrologic Models
5. Supplemental Graphics:TP- and Precipitation Frequency Graphs
Appendix C - Links to Other Resources and Manuals
Appendix D - Construction Support
Appendix D- Operation & Maintenance Checklists
Appendix D - BMP Cost Estimate Worksheet
Appendix E - Minnesota Plant List and Application
1. Sources for Stormwater BMP Plant Material Selection
2. Salt Tolerance
3. Green Roofs
4. References
4.1. Salt Tolerance
4.2. Green Roof Plant Material Selection
Appendix F - Special Waters and Other Sensitive Receiving Waters
Appendix G - Additional Regulatory Information
1. Agencies and Stormwater Authorities
2. State
Appendix H - Acronyms, Symbols and Glossary
1. Acronyms
2. Symbols
3. Glossary
Appendix I - Bibliography
1. Bibliography
2. Web References
2.2. Other Web References
Appendix J - Issue Papers
1. Topics
2. Access
Appendix K - Stormwater Research and Education
1. Introduction
2. Research Needs
3. Research Centers
4. Educational Resources on Stormwater Management
Appendix L - Simple Method for Estimating Phosphorus Export
1. The Simple Method
2. Calculating Pre-Development and Post-Development Phosphorus Load
3. References
Appendix M - Estimating Channel Protection Storage Volume
1. COMPUTING Vcp
2. Figures
Appendix N - Three-Tiered BMP Performance Range for TSS and TP
1. Introduction
2. Approach
3. Recommended Performance Measures
3.1. BMP Performance
3.1.1. Stormwater ponds
3.1.2. Stormwater wetlands
3.1.3. Filtration practice (grass filters/swales)
3.1.4. Filtration practice (media filters; includes sand filters, peat mixed with sand, and other)
3.1.5. Bioretention
3.1.6. Infiltration
3.2. Other Factors Influencing Performance
3.2.1. The effects of geographic location
3.2.2. Watershed configuration
3.2.3. Uncertainty of hydrologic measurements
3.2.4. BMP design criteria
3.2.5. BMP maintenance
3.2.6. Climate
4. References
Appendix O - Channel Protection Criteria Evaluation
1. Background
2. Methodology
3. Results/Discussion
4. CONCEPTS Erosion Modeling Results
5. Conclusions
Literature Review Summary