m |
m (→Related pages) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 32: | Line 32: | ||
*Novotny, E. V., Murphy, D., and Stefan, H. G. 2008. Increase of urban lake salinity by road de- icing salt, Sci. Total Environ., 406:131-144. | *Novotny, E. V., Murphy, D., and Stefan, H. G. 2008. Increase of urban lake salinity by road de- icing salt, Sci. Total Environ., 406:131-144. | ||
*Novotny, V., Muehring, D. Zitomer, D. H., Smith, D. W., and Facey, R. 1998. Cyanide and metal pollution by urban snowmelt: impact of deicing compounds. Wat. Sci. Tech. 38(10):223-230. | *Novotny, V., Muehring, D. Zitomer, D. H., Smith, D. W., and Facey, R. 1998. Cyanide and metal pollution by urban snowmelt: impact of deicing compounds. Wat. Sci. Tech. 38(10):223-230. | ||
− | *Sander, A., Novotny, E., Mohseni, O. and Stefan, H. 2007. [https://conservancy.umn.edu/bitstream/handle/11299/115332/pr503.pdf?sequence=1 Inventory of Road Salt Uses in the Minneapolis/St. Paul Metropolitan Area]. University of Minnesota St. Anthony Fall Laboratory Engineering, Environmental and Geophysical Fluid Dynamics. Project Report No. 503. Prepared for Minnesota Department of | + | *Sander, A., Novotny, E., Mohseni, O. and Stefan, H. 2007. [https://conservancy.umn.edu/bitstream/handle/11299/115332/pr503.pdf?sequence=1 Inventory of Road Salt Uses in the Minneapolis/St. Paul Metropolitan Area]. University of Minnesota St. Anthony Fall Laboratory Engineering, Environmental and Geophysical Fluid Dynamics. Project Report No. 503. Prepared for Minnesota Department of Transportation. |
− | Transportation. | ||
*Sassan, D, and Kahl, S. 2007. Salt Loading Due to Private Winter Maintenance Practices. Plymouth State University, Center for the Environment, Plymouth, NH. | *Sassan, D, and Kahl, S. 2007. Salt Loading Due to Private Winter Maintenance Practices. Plymouth State University, Center for the Environment, Plymouth, NH. | ||
*Shingle Creek Watershed Management Commission (WMC). [https://www.pca.state.mn.us/sites/default/files/wq-iw8-02c.pdf Shingle Creek Chloride TMDL Implementation Plan]. Wenck File #1240. Maple Plain: Wenck Associates, 2007. | *Shingle Creek Watershed Management Commission (WMC). [https://www.pca.state.mn.us/sites/default/files/wq-iw8-02c.pdf Shingle Creek Chloride TMDL Implementation Plan]. Wenck File #1240. Maple Plain: Wenck Associates, 2007. | ||
Line 46: | Line 45: | ||
*Wenck. 2009. Phase 1 [https://www.pca.state.mn.us/sites/default/files/wq-b11-01.pdf Chloride Feasibility Study for the Twin Cities Metropolitan Area]. | *Wenck. 2009. Phase 1 [https://www.pca.state.mn.us/sites/default/files/wq-b11-01.pdf Chloride Feasibility Study for the Twin Cities Metropolitan Area]. | ||
*Xian, G., Homer, C., Dewitz, J., Fry, J., Hossain, N., and Wickham, J., 2011. [http://www.mrlc.gov/ The change of impervious surface area between 2001 and 2006 in the conterminous United States. Photogrammetric Engineering and Remote Sensing], Vol. 77(8): 758-762. | *Xian, G., Homer, C., Dewitz, J., Fry, J., Hossain, N., and Wickham, J., 2011. [http://www.mrlc.gov/ The change of impervious surface area between 2001 and 2006 in the conterminous United States. Photogrammetric Engineering and Remote Sensing], Vol. 77(8): 758-762. | ||
+ | |||
+ | <noinclude> | ||
+ | ==Related pages== | ||
+ | *[[TCMA Chloride Management Plan - Background and Description]] | ||
+ | *[[TCMA Chloride Management Plan - TCMA Chloride Conditions]] | ||
+ | *[[TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection]] | ||
+ | *[[TCMA Chloride Management Plan - Monitoring, tracking, reporting, and adaptive management]] | ||
+ | *[[TCMA Chloride Management Plan - Research Needs]] | ||
+ | *[[TCMA Chloride Management Plan - Stakeholder and Public Involvement Process]] | ||
+ | *[[TCMA Chloride Management Plan - Appendix A – TCMA Chloride TMDL]] | ||
+ | *[[TCMA Chloride Management Plan - Appendix B – Winter Maintenance Assessment tool (WMAt)]] | ||
+ | *[[TCMA Chloride Management Plan - Appendix C – Sidewalk Survey Results]] | ||
+ | *[[TCMA Chloride Management Plan - Appendix D – Educational Resources]] | ||
+ | *[[TCMA Chloride Management Plan - References]] | ||
+ | |||
+ | [[Category:Level 2 - Pollutants/Chloride]] | ||
+ | [[Category:Level 2 - Management/Winter management]] | ||
+ | </noinclude> |
This page was last edited on 23 November 2022, at 16:33.