(Created page with "MPCA contracted with TetraTech to assess if or how street sweeping could be incorporated in to the Minimal Impact Design Standards Calculator and the MPCA Simple Estimator. Re...") |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 9: | Line 9: | ||
*Consider a literature review to establish revised EMCs for land uses, prior to BMP treatment and removal efficiencies. | *Consider a literature review to establish revised EMCs for land uses, prior to BMP treatment and removal efficiencies. | ||
*Incorporate additional data fields into the Simple Estimator for number of rain days, sweeping frequency, and TP load removed using the Sweeping Calculator. | *Incorporate additional data fields into the Simple Estimator for number of rain days, sweeping frequency, and TP load removed using the Sweeping Calculator. | ||
+ | |||
+ | <noinclude> | ||
+ | [[Category:Level 3 - Best management practices/Nonstructural practices/Street sweeping]] | ||
+ | [[Category:Level 3 - Models and modeling/Specific models/MPCA Simple Estimator]] | ||
+ | </noinclude> |
MPCA contracted with TetraTech to assess if or how street sweeping could be incorporated in to the Minimal Impact Design Standards Calculator and the MPCA Simple Estimator. Recommendations are provided below.
The MPCA will be assessing how the Simple Estimator could accommodate street sweeping.
Recommendations
This page was last edited on 8 December 2022, at 22:42.