m |
m |
||
Line 12: | Line 12: | ||
<noinclude> | <noinclude> | ||
[[Category:Level 3 - Best management practices/Nonstructural practices/Street sweeping]] | [[Category:Level 3 - Best management practices/Nonstructural practices/Street sweeping]] | ||
+ | [[Category:Level 3 - Models and modeling/Specific models/MPCA Simple Estimator]] | ||
</noinclude> | </noinclude> |
MPCA contracted with TetraTech to assess if or how street sweeping could be incorporated in to the Minimal Impact Design Standards Calculator and the MPCA Simple Estimator. Recommendations are provided below.
The MPCA will be assessing how the Simple Estimator could accommodate street sweeping.
Recommendations
This page was last edited on 8 December 2022, at 22:42.