For each Best Management Practice (BMP) in the Manual a page was created explaining how to apply that BMP in the Minimal Impact Design Standards (MIDS) calculator.  Each page provides a discussion of the requirements, recommendations and information for using that BMP in the calculator.  Each page contains an example application for the BMP.  Links to those pages are shown below.
 
For each Best Management Practice (BMP) in the Manual a page was created explaining how to apply that BMP in the Minimal Impact Design Standards (MIDS) calculator.  Each page provides a discussion of the requirements, recommendations and information for using that BMP in the calculator.  Each page contains an example application for the BMP.  Links to those pages are shown below.
*[[Requirements, recommendations and information for using bioretention with no underdrain BMPs in the MIDS calculator|Bioretention with no underdrain]]
+
*[[Requirements, recommendations and information for using bioretention with no underdrain BMPs in the MIDS calculator#Bioretention basin with no underdrain (bioinfiltration) example (Version 2)|Bioretention with no underdrain]]
 
*[[Requirements, recommendations and information for using bioretention with an underdrain BMPs in the MIDS calculator|Bioretention with an underdrain]]
 
*[[Requirements, recommendations and information for using bioretention with an underdrain BMPs in the MIDS calculator|Bioretention with an underdrain]]
 
*[[Requirements, recommendations and information for using swale without an underdrain as a BMP in the MIDS calculator|Swale with no underain]]
 
*[[Requirements, recommendations and information for using swale without an underdrain as a BMP in the MIDS calculator|Swale with no underain]]

Revision as of 22:19, 6 November 2014

For each Best Management Practice (BMP) in the Manual a page was created explaining how to apply that BMP in the Minimal Impact Design Standards (MIDS) calculator. Each page provides a discussion of the requirements, recommendations and information for using that BMP in the calculator. Each page contains an example application for the BMP. Links to those pages are shown below.

  • The MIDS calculator was developed as a site tool. Thus, BMPs are typically entered as individual entities rather than lumped together. For example, if a site has three bioretention BMPs, each BMP would be entered individually in the calculator. However, BMPs can be lumped in the calculator. In this example, the three bioretention BMPs could be combined and treated as a single BMP. Lumping BMPs has the advantage of simplifying complex site and may be useful when using the calculator for larger areas where several BMPs are implemented. Lumping BMPs can introduce errors in the calculations if the BMPs are not properly sized, since lumping smoothes out these sizing differences. The following document provides an example comparing calculator results for a site where BMPs are treated individually and lumped.
File:16 - Individual vs Clumping example.docx

During the winter of 2013-2014, Minimal Impact Design Standards (MIDS) calculator training workshops were held. Example exercises and answers from those workshops are contained in the following pdf document: File:Calculator exercises and answers.pdf