+ | [[file:Mounding analysis results.png|300px|thumb|alt=graph showing results of mounding runs|<font size=3>Results of 5 calculator runs to determine the maximum mound under an infiltration practice in a medium sand. The maximum mound is shown as a function of distance from the center of the infiltration practice. Calculator inputs and results are summarized in the table above.</font size>]] | ||
We used the [http://pubs.usgs.gov/sir/2010/5102/ Excel spreadsheet] developed by the USGS to calculate example mounds that would develop under an infiltration BMP in a medium sand. Calculator inputs that were help constant included specific yield (0.26), hydraulic conductivity (55 feet/day), and time (2 days to simulate the 48 hour drawdown requirement in the Construction Stormwater Permit). Calculator inputs that were varied include the recharge (values of 1 and 1.5 feet, which simulates the ponded depth in the BMP), the dimensions of the BMP, and the aquifer thickness (values of 5 and 10 feet). The calculator utilizes values for 1/2 the length and 1/2 the width of the BMP. Results are shown in the table to the right. The first, fourth, and fifth scenarios in the table meet the 1 inch performance goal, while the other two scenarios do not. | We used the [http://pubs.usgs.gov/sir/2010/5102/ Excel spreadsheet] developed by the USGS to calculate example mounds that would develop under an infiltration BMP in a medium sand. Calculator inputs that were help constant included specific yield (0.26), hydraulic conductivity (55 feet/day), and time (2 days to simulate the 48 hour drawdown requirement in the Construction Stormwater Permit). Calculator inputs that were varied include the recharge (values of 1 and 1.5 feet, which simulates the ponded depth in the BMP), the dimensions of the BMP, and the aquifer thickness (values of 5 and 10 feet). The calculator utilizes values for 1/2 the length and 1/2 the width of the BMP. Results are shown in the table to the right. The first, fourth, and fifth scenarios in the table meet the 1 inch performance goal, while the other two scenarios do not. |
The localized groundwater surface may temporarily rise below an infiltration Best Management Practice (BMP), creating a condition termed groundwater mounding. Mounding can occur in areas where infiltrating water intersects a groundwater table and the rate of water entering the subsurface is greater than the rate at which water is conveyed away from the infiltration system (Susilo, 2009). Infiltration BMPs in particular have the potential to cause a groundwater mound, given the right subsurface conditions, because they direct the recharge to a specific area (Machusick and Traver, 2009).
The vadose zone is the unsaturated depth of in-situ (existing) soil below the infiltration BMP. Contaminants that are not captured within the BMP may be attenuated within this zone. The temporary rise of the groundwater elevation caused by mounding will decrease the available vadose zone, which may decrease the removal of certain pollutants. If the mound reaches the base of the infiltration BMP, then the hydraulic gradient (direction of water movement) shifts from vertical to horizontal and significantly slows the movement of water through the soil. Groundwater mounds that significantly widen below the base of an infiltration BMP may damage underground utilities, basements and building structures if the mounds are high enough and there is not enough separation between the mound and structures (Machusick and Traver, 2009). Groundwater mounds may also affect local hydraulic gradients and mobilize contaminants that are in soil or groundwater.
A mounding analysis is a way to determine the likelihood that a groundwater mound will occur. A mounding analysis should be performed if one or more of the following conditions exist:
Both analytical and numerical methods exist that can predict the extent of a groundwater mound. The most widely known and accepted analytical method is based on the work by Hantush (1967). A simple Excel spreadsheet of the Hantush Method was created by the USGS. This method requires the user to input information on the recharge rate, specific yield, horizontal hydraulic conductivity, dimensions of the infiltration BMP, and the initial thickness of the unsaturated zone. The result is considered by experts to be a simplified version of the actual site conditions. The Hantush method can be limited by it's assumptions, which include no storage loss, uniform and horizontal infiltration, and vertical sides to the BMP. If these assumptions are violated then a more robust numerical method should be used.
A common numerical method is to model site conditions using computer simulations. MODFLOW is the most widely used among the many programs that exist. While numerical modeling can provide a more accurate representation of site conditions, it also requires the user to have considerable training in order to develop the model and run simulations and interpret the results.
Factors that affect the height and extent of a groundwater mound beneath a stormwater infiltration system
Link to this table
Model Input Parameter | Description of Parameter | Mound Height | Mound Extent | Effect on Groundwater Mounding |
---|---|---|---|---|
Horizontal Hydraulic Conductivity of Aquifer | Measure of resistance to flow of water through a unit volume of aquifer matrix in the horizontal direction.
|
Decreases as hydraulic conductivity increases | Increases as hydraulic conductivity increases | Increasing horizontal hydraulic conductivity allows for greater ability to transmit water away from the source of infiltration. This allows for lower height of groundwater mounding, but greater extents. |
Initial Saturated Thickness of Aquifer | Thickness of the aquifer, or permeable layer that can contain or transmit groundwater, within the saturated zone measured from the seasonal high water table to the bottom of the aquifer. Note this saturated zone may be a localized or perched groundwater system rather than the regional groundwater system. Minnesota regional aquifer information can be found on the MDNR groundwater provinces web page. | Decreases with greater thickness | Increases with greater thickness | Increasing aquifer thickness allows for a larger area to transmit water to and from the source of infiltration. This allows for lower height of groundwater mounding but greater extents as water moves away from the source. |
Specific Yield | Governs the amount of water the unsaturated zone of an aquifer can store once recharge reaches the water table.
|
Increases with lower values | Increases with lower values | Groundwater mound height and extent are lower when specific yield is higher because the aquifer can store more water per unit volume of aquifer |
Infiltration Basin Shape | Shape can vary from square, rectangle, round or elongate. Extents of the basin will vary by depth and drawdown time of the basin per Infiltration Basin Design Criteria. | Decreases for rectangular installations | Increases for rectangular basin | Long narrow basins are much more efficient at infiltrating water than circular or square ones. High perimeter to area ratio basins have more efficient hydraulic sections because flow is radially away from the basin or recharge area once the mound height reaches the basin bottom. |
Infiltration Basin Depth | The maximum depth of ponded water within the infiltration basin.
|
Increases with greater depth | Increases with greater depths | Greater basin depths allow for increased groundwater mounding height and extent. |
Design Storm | The design storm dictates the rainfall event intensity, duration, and statistical recurrence interval the infiltration basin is designed to manage.
|
Increases with larger design storms | Increases with larger design storms | Larger design storms result in increased amounts of runoff and larger volume of water to be infiltrated. |
Percent Impervious Cover | Impervious cover represents the regions within the drainage area that are unable to infiltrate stormwater, resulting in stormwater runoff. | Increases with higher percentages | Increases with higher percentages | Higher imperviousness results in increased amounts of stormwater runoff and larger volume of water to be infiltrated. |
Recharge or Infiltration Rate | The rate at which water placed within the basin reaches the water table.
|
Increases with higher rates | Increases with higher rates | Magnitude and extents of groundwater mounds are directly proportional to the recharge rate. Duration of recharge also impacts the height and extent of groundwater mounding. The longer the duration at the specified recharge rate, the greater the magnitude and extent of mounding. |
Results of mounding analysis for an infiltration practice in a medium sand | |||||
Inputs | |||||
Recharge (ft/day) | 1 | 1 | 1.5 | 1 | 1 |
Specific yield | 0.26 | 0.26 | 0.26 | 0.26 | 0.26 |
Ksat (ft/day) | 55 | 55 | 55 | 55 | 55 |
1/2 length (ft) | 30 | 15 | 30 | 18.15 | 30 |
1/2 width (ft) | 30 | 15 | 30 | 50 | 30 |
Time (days) | 2 | 2 | 2 | 2 | 2 |
Aquifer thickness (ft) | 10 | 10 | 10 | 10 | 5 |
Results | |||||
Distance from basin center (ft) | Maximum mound height (feet) | ||||
Run 1 | Run 2 | Run 3 | Run 4 | Run 5 | |
0 | 1.547 | 0.572 | 2.268 | 1.435 | 2.26 |
20 | 1.391 | 0.409 | 2.045 | 1.194 | 2.012 |
40 | 0.953 | 0.246 | 1.413 | 0.826 | 1.283 |
60 | 0.617 | 0.156 | 0.921 | 0.547 | 0.725 |
80 | 0.398 | 0.100 | 0.597 | 0.359 | 0.388 |
100 | 0.254 | 0.063 | 0.381 | 0.230 | 0.197 |
120 | 0.158 | 0.040 | 0.238 | 0.144 | 0.094 |
We used the Excel spreadsheet developed by the USGS to calculate example mounds that would develop under an infiltration BMP in a medium sand. Calculator inputs that were help constant included specific yield (0.26), hydraulic conductivity (55 feet/day), and time (2 days to simulate the 48 hour drawdown requirement in the Construction Stormwater Permit). Calculator inputs that were varied include the recharge (values of 1 and 1.5 feet, which simulates the ponded depth in the BMP), the dimensions of the BMP, and the aquifer thickness (values of 5 and 10 feet). The calculator utilizes values for 1/2 the length and 1/2 the width of the BMP. Results are shown in the table to the right. The first, fourth, and fifth scenarios in the table meet the 1 inch performance goal, while the other two scenarios do not.
The results indicate that