Line 181: | Line 181: | ||
Constructed basins provide pollutant removal associated with settling of particulates normally present in stormwater runoff. No credits associated with volume reduction are available. | Constructed basins provide pollutant removal associated with settling of particulates normally present in stormwater runoff. No credits associated with volume reduction are available. | ||
− | + | In the Minimal Impact Design Standards (MIDS) Calculator, phosphorus in runoff is assumed to be 55 percent particulate phosphorus (PP) and 45 percent dissolved phosphorus (DP). Using these values, the event-based TP removal, M<sub>TP</sub> in pounds, is given by | |
<math> M_{TP} = 0.0000624\ ((0.55\ R_{PP})\ + (0.45\ R_{DP}))\ EMC_{TP}\ V_{pp} </math> | <math> M_{TP} = 0.0000624\ ((0.55\ R_{PP})\ + (0.45\ R_{DP}))\ EMC_{TP}\ V_{pp} </math> | ||
Line 190: | Line 190: | ||
*EMC<sub>TP</sub> is the event mean concentration for total phosphorus in runoff, in milligrams per liter. | *EMC<sub>TP</sub> is the event mean concentration for total phosphorus in runoff, in milligrams per liter. | ||
− | + | Ratios for particulate and dissolved phosphorus vary, depending on factors such as land use, season, and time during a runoff event. For information on ratios of PP and DP in runoff, [https://stormwater.pca.state.mn.us/index.php?title=Event_mean_concentrations_of_total_and_dissolved_phosphorus_in_stormwater_runoff#Ratios_of_particulate_to_dissolved_phosphorus link here]. | |
− | The annual TP credit, in pounds, is given by | + | For wet ponds, removal rates for PP and DP vary with design level. Assuming PP is 55% of TP, the removal rates are given below. |
+ | Design Level 1 removal rates: DP = 0%, PP =60%, TP = 34% | ||
+ | Design Level 2 removal rates: DP = 8%, PP = 84%, TP = 50% | ||
+ | Design Level 3 removal rates: DP = 23%, PP = 90%, TP = 60% | ||
+ | |||
+ | The MIDS Calculator gives no credit for DP unless an amendment to retain phosphorus is incorporated into the pond design. Data from the International BMP Database indicates constructed basins with no P-retaining amendment typically provide no credit for DP. Information on phosphorus removal fractions (percentages) can be found [http://stormwater.pca.state.mn.us/index.php/Information_on_pollutant_removal_by_BMPs here]. PP removal rates for pond Design Level 2, the most common design, are 0.85 for constructed ponds and 0.69 for constructed wetlands. | ||
+ | |||
+ | Assuming PP is 55 percent of TP, the annual TP credit, in pounds, is given by | ||
<math> M_{TP} = 2.72\ ((0.55\ R_{PP})\ + (0.45\ R_{DP}))\ EMC_{TSS}\ F\ V_{annual} </math> | <math> M_{TP} = 2.72\ ((0.55\ R_{PP})\ + (0.45\ R_{DP}))\ EMC_{TSS}\ F\ V_{annual} </math> |
Recommended pollutant removal efficiencies, in percent, for constructed ponds. Sources. TSS=total suspended solids; TP=total phosphorus; PP=particulate phosphorus; DP=dissolved phosphorus; TN=total nitrogen | |||||||||
Design level | TSS | TP | PP | DP | TN | Metals | Bacteria | Hydrocarbons | |
1 | 60 | 34 | 60 | 0 or 401 | 30 | 70 | 60 | 80 | |
2 | 84 | 50 | 84 | 0 or 401 | 30 | 70 | 60 | 80 | |
3 | 90 | 60 | 90 | 0 or 401 | 30 | 70 | 60 | 80 | |
1 If iron or another amendment to retain phosphorus has been incorporated into the design, the dissolved phosphorus removal is 40 percent. With no amendment, removal is 0 percent. Note that only iron enhanced pond benches are discussed in this manual as a mechanism for retaining dissolved phosphorus. | - |
Credit refers to the quantity of stormwater or pollutant reduction achieved either by an individual best management practice (BMP) or cumulatively with multiple BMPs. Stormwater credits are a tool for local stormwater authorities who are interested in
This page provides a discussion of how constructed basins ( wet pond and stormwater wetland) can achieve stormwater credits.
Recommended pollutant removal efficiencies, in percent, for constructed wetlands. Sources. TSS=total suspended solids; TP=total phosphorus; PP=particulate phosphorus; DP=dissolved phosphorus; TN=total nitrogen | |||||||
TSS | TP | PP | DP | TN | Metals | Bacteria | Hydrocarbons |
73 | 38 | 69 | 0 | 30 | 70 | 60 | 80 |
Stormwater ponds and stormwater wetlands are the most common types of constructed basins. Constructed basins have a permanent pool of water and are built for the purpose of capturing and storing stormwater runoff. These basins are constructed, either temporarily or in a permanent installation, to prevent or mitigate downstream water quantity and/or quality impacts. Several types of constructed basins and wetlands (stormwater basins, constructed stormwater ponds, wet detention ponds, forebays, wet sedimentation basins, wet ponds, constructed wetlands, stormwater wetlands, etc) are included in this general category. Generally stormwater ponds do not have a significant area of vegetation. Stormwater wetlands do have significant vegetation that enhances the nutrient removal of the basin. Not included in this BMP category are dry basins without a permanent pool. Also not included are pretreatment practices, such as oil/water separators, swirl concentrators, and other manufactured devices, that have a permanent pool of water in the device.
Constructed basins rely on physical, biological, and chemical processes to remove pollutants from incoming stormwater runoff. The primary treatment mechanism is gravitational settling of particulates and their associated pollutants as stormwater runoff resides in the permanent pool. Stormwater wetlands provide an additional mechanism for the removal of nutrient and other pollutants through the uptake by algae and aquatic vegetation. Volatilization and chemical activity can also occur in both ponds and wetlands, breaking down and assimilating a number of other stormwater contaminants such as hydrocarbons (WEF, ASCE/EWRI, 2012).
The longer stormwater runoff remains in the permanent pool, the more settling (and associated pollutant removal) and other treatment will occur. After the particulates settle to the bottom of a pond, a permanent pool provides protection from re-suspension when additional runoff enters the pond during and after a rain event (WEF, ASCE/EWRI, 2012).
Stormwater treatment trains are comprised of multiple Best Management Practices (BMPs) that work together to minimize the volume of stormwater runoff, remove pollutants, and reduce the rate of stormwater runoff being discharged to Minnesota wetlands, lakes and streams. Constructed basins are typically located at the end of the stormwater treatment train, capturing all the runoff from the site.
This section describes the basic concepts used to calculate credits for volume, total suspended solids (TSS) and total phosphorus (TP). Specific methods for calculating credits are discussed later in this article.
Constructed basins generate credits for TSS and TP. They do not substantially reduce the volume of runoff. Constructed basins are effective at reducing concentrations of other pollutants associated with sediment, including metals and hydrocarbons. This article does not provide information on calculating credits for pollutants other than TSS and TP, but references are provided that may be useful for calculating credits for Other pollutants.
Wet ponds have many potential designs. Credits vary with design. Below are minimum requirements for three design levels used to credit constructed wet ponds.
In developing the credit calculations, it is assumed the constructed basin is properly designed, constructed, and maintained in accordance with the Minnesota Stormwater Manual. If any of these assumptions is not valid, the BMP may not qualify for credits or credits should be reduced based on reduced ability of the BMP to achieve pollutant reductions. For guidance on design, construction, and maintenance, see the appropriate article within the Manual (pond design, construction, maintenance; wetland design, construction, maintenance).
Ponds constructed under the Construction Stormwater General Permit (CGP) must meet the following conditions.
If any of these assumptions are not valid, the credit will be reduced.
Constructed basins provide pollutant removal associated with settling of particulates normally present in stormwater runoff, and serve the purpose of reducing peak stormwater flows for channel protection and overbank flood control. Pollutant removal is accomplished by the maintenance of a permanent pool of water that serves to both settle and store the particulates. The necessity of the permanent pool negates the ability to infiltrate runoff; therefore no volume credit is obtained for basins and wetlands.
Constructed basins provide pollutant removal associated with settling of particulates normally present in stormwater runoff. No credits associated with volume reduction are available.
The event-based TSS credit for constructed basins, MTSS in pounds, is given by
\( M_{TSS} = 0.0000624\ R_{TSS}\ EMC_{TSS}\ V_{pp} \)
where
TSS removal for constructed ponds and wetlands varies with the design.
For the most common design, Design Level 2, the median removal rates are 84 percent for constructed ponds and 73 percent for constructed wetlands. For a discussion of the principles of sedimentation, see Weiss et al..
The Water Quality Volume (VWQ), which is equivalent to Vpp, is delivered instantaneously to the BMP. The VWQ can vary depending on the stormwater management objective(s). For construction stormwater, the water quality volume is 1 inch times the new impervious surface area. For MIDS, the VWQ is 1.1 inches times the new impervious surface area.
The annual TSS credit, in pounds, is given by
\( M_{TSS} = 2.72\ R_{TSS}\ EMC_{TSS}\ F\ V_{annual} \)
where
For a constructed pond or wetland, the fraction of annual runoff treated by the BMP is assumed to be 1, meaning all runoff from the contributing drainage area passes through and is treated by the BMP.
Assume a constructed pond is designed to treat 5 acres of impervious surface and 5 acres of forested land on B (SM) soils. The TSS concentration in runoff is 54.5 milligrams per liter. Annual runoff, calculated using the MIDS calculator, is 11.72 acre-feet. The annual TSS reduction is 2.72 * 0.84 * 54.5 * 11.72 = 1459 pounds. If the BMP was a constructed wetland instead of a constructed pond, the removal efficiency would be 0.73 instead of 0.84 and the TSS reduction would be 1268 pounds.
Constructed basins provide pollutant removal associated with settling of particulates normally present in stormwater runoff. No credits associated with volume reduction are available.
In the Minimal Impact Design Standards (MIDS) Calculator, phosphorus in runoff is assumed to be 55 percent particulate phosphorus (PP) and 45 percent dissolved phosphorus (DP). Using these values, the event-based TP removal, MTP in pounds, is given by
\( M_{TP} = 0.0000624\ ((0.55\ R_{PP})\ + (0.45\ R_{DP}))\ EMC_{TP}\ V_{pp} \)
where
Ratios for particulate and dissolved phosphorus vary, depending on factors such as land use, season, and time during a runoff event. For information on ratios of PP and DP in runoff, link here.
For wet ponds, removal rates for PP and DP vary with design level. Assuming PP is 55% of TP, the removal rates are given below. Design Level 1 removal rates: DP = 0%, PP =60%, TP = 34% Design Level 2 removal rates: DP = 8%, PP = 84%, TP = 50% Design Level 3 removal rates: DP = 23%, PP = 90%, TP = 60%
The MIDS Calculator gives no credit for DP unless an amendment to retain phosphorus is incorporated into the pond design. Data from the International BMP Database indicates constructed basins with no P-retaining amendment typically provide no credit for DP. Information on phosphorus removal fractions (percentages) can be found here. PP removal rates for pond Design Level 2, the most common design, are 0.85 for constructed ponds and 0.69 for constructed wetlands.
Assuming PP is 55 percent of TP, the annual TP credit, in pounds, is given by
\( M_{TP} = 2.72\ ((0.55\ R_{PP})\ + (0.45\ R_{DP}))\ EMC_{TSS}\ F\ V_{annual} \)
where
For a constructed pond or wetland, the fraction of annual runoff treated by the BMP is assumed to be 1, meaning all runoff from the contributing area passes through and is treated by the BMP.
Assume a 10 acre site with 5 acres of impervious and 5 acres of forested land. Annual rainfall is 31.9 inches and the soil is B (SM) with an infiltration rate of 0.45 inches per hour. The TP EMC is 0.3 milligrams per liter and the removal efficiency of the BMP for particulate phosphorus is 0.85. No dissolved phosphorus is removed. The MIDS calculator was used to calculate an annual runoff of 11.72 acre-feet delivered to the BMP. The annual TP reduction is therefore
2.72 * ((0.55 * 0.85) + (0.45 * 0)) * 0.3 * 11.72 = 4.47 pounds
If the BMP was a constructed wetland the removal efficiency for particulate phosphorus would be 0.68 instead of 0.85 and the total phosphorus removed would be 3.58 pounds.
This section provides specific information on generating and calculating credits from constructed basins for total suspended solids (TSS) and total phosphorus (TP). Stormwater runoff pollution reductions (“credits”) may be calculated using one of the following methods:
The techniques described in this article assume that volume credit cannot be obtained for stormwater ponds and wetlands. This is based on an overall assumption that ponds and wetlands have insignificant losses related to seepage, evaporation, and transpiration. Stormwater pond and wetland designers that suspect significant volume losses from a specific BMP are encouraged to quantify these volume losses through field measurements.
Ponds and wetlands are also effective at reducing concentrations of other pollutants including nitrogen and metals. This article does not provide information on calculating credits for pollutants other than TSS and phosphorus, but references are provided that may be useful for calculating credits for other pollutants; see Other Pollutants and References for more information.
Users may opt to use a water quality model or calculator to compute volume, TSS and/or TP pollutant removal for the purpose of determining credits for stormwater ponds and wetlands. The available models described in this section are commonly used by water resource professionals, but are not explicitly endorsed or required by the Minnesota Pollution Control Agency.
Use of models or calculators for the purpose of computing pollutant removal credits should be supported by detailed documentation, including:
The following table lists water quantity and water quality models that are commonly used by water resource professionals to predict the hydrologic, hydraulic, and/or pollutant removal capabilities of a single or multiple stormwater BMPs. The table can be used to guide a user in selecting the most appropriate model for computing volume, TSS, and/or TP removal for constructed basin BMPs. In using this table to identify models appropriate for constructed ponds and wetlands, use the sort arrow on the table and sort by Constructed Basin BMPs. Models identified with an X may be appropriate for using with constructed basins.
Comparison of stormwater models and calculators. Additional information and descriptions for some of the models listed in this table can be found at this link. Note that the Construction Stormwater General Permit requires the water quality volume to be calculated as an instantaneous volume, meaning several of these models cannot be used to determine compliance with the permit.
Link to this table
Access this table as a Microsoft Word document: File:Stormwater Model and Calculator Comparisons table.docx.
Model name | BMP Category | Assess TP removal? | Assess TSS removal? | Assess volume reduction? | Comments | |||||
---|---|---|---|---|---|---|---|---|---|---|
Constructed basin BMPs | Filter BMPs | Infiltrator BMPs | Swale or strip BMPs | Reuse | Manu- factured devices |
|||||
Center for Neighborhood Technology Green Values National Stormwater Management Calculator | X | X | X | X | No | No | Yes | Does not compute volume reduction for some BMPs, including cisterns and tree trenches. | ||
CivilStorm | Yes | Yes | Yes | CivilStorm has an engineering library with many different types of BMPs to choose from. This list changes as new information becomes available. | ||||||
EPA National Stormwater Calculator | X | X | X | No | No | Yes | Primary purpose is to assess reductions in stormwater volume. | |||
EPA SWMM | X | X | X | Yes | Yes | Yes | User defines parameter that can be used to simulate generalized constituents. | |||
HydroCAD | X | X | X | No | No | Yes | Will assess hydraulics, volumes, and pollutant loading, but not pollutant reduction. | |||
infoSWMM | X | X | X | Yes | Yes | Yes | User defines parameter that can be used to simulate generalized constituents. | |||
infoWorks ICM | X | X | X | X | Yes | Yes | Yes | |||
i-Tree-Hydro | X | No | No | Yes | Includes simple calculator for rain gardens. | |||||
i-Tree-Streets | No | No | Yes | Computes volume reduction for trees, only. | ||||||
LSPC | X | X | X | Yes | Yes | Yes | Though developed for HSPF, the USEPA BMP Web Toolkit can be used with LSPC to model structural BMPs such as detention basins, or infiltration BMPs that represent source control facilities, which capture runoff from small impervious areas (e.g., parking lots or rooftops). | |||
MapShed | X | X | X | X | Yes | Yes | Yes | Region-specific input data not available for Minnesota but user can create this data for any region. | ||
MCWD/MWMO Stormwater Reuse Calculator | X | Yes | No | Yes | Computes storage volume for stormwater reuse systems | |||||
Metropolitan Council Stormwater Reuse Guide Excel Spreadsheet | X | No | No | Yes | Computes storage volume for stormwater reuse systems. Uses 30-year precipitation data specific to Twin Cites region of Minnesota. | |||||
MIDS Calculator | X | X | X | X | X | X | Yes | Yes | Yes | Includes user-defined feature that can be used for manufactured devices and other BMPs. |
MIKE URBAN (SWMM or MOUSE) | X | X | X | Yes | Yes | Yes | User defines parameter that can be used to simulate generalized constituents. | |||
P8 | X | X | X | X | Yes | Yes | Yes | |||
PCSWMM | X | X | X | Yes | Yes | Yes | User defines parameter that can be used to simulate generalized constituents. | |||
PLOAD | X | X | X | X | X | Yes | Yes | No | User-defined practices with user-specified removal percentages. | |
PondNet | X | Yes | No | Yes | Flow and phosphorus routing in pond networks. | |||||
PondPack | X | [ | No | No | Yes | PondPack can calculate first-flush volume, but does not model pollutants. It can be used to calculate pond infiltration. | ||||
RECARGA | X | No | No | Yes | ||||||
SHSAM | X | No | Yes | No | Several flow-through structures including standard sumps, and proprietary systems such as CDS, Stormceptors, and Vortechs systems | |||||
SUSTAIN | X | X | X | X | X | Yes | Yes | Yes | Categorizes BMPs into Point BMPs, Linear BMPs, and Area BMPs | |
SWAT | X | X | X | Yes | Yes | Yes | Model offers many agricultural BMPs and practices, but limited urban BMPs at this time. | |||
Virginia Runoff Reduction Method | X | X | X | X | X | X | Yes | No | Yes | Users input Event Mean Concentration (EMC) pollutant removal percentages for manufactured devices. |
WARMF | X | X | Yes | Yes | Yes | Includes agriculture BMP assessment tools. Compatible with USEPA Basins | ||||
WinHSPF | X | X | X | Yes | Yes | Yes | USEPA BMP Web Toolkit available to assist with implementing structural BMPs such as detention basins, or infiltration BMPs that represent source control facilities, which capture runoff from small impervious areas (e.g., parking lots or rooftops). | |||
WinSLAMM | X | X | X | X | Yes | Yes | Yes | |||
XPSWMM | X | X | X | Yes | Yes | Yes | User defines parameter that can be used to simulate generalized constituents. |
The Simple Method is a technique used for estimating storm pollutant export delivered from urban development sites. Pollutant loads are estimated as the product of mean pollutant concentrations and runoff depths over specified periods of time (usually annual or seasonal). The method was developed to provide an easy yet reasonably accurate means of predicting the change in pollutant loadings in response to development. Ohrel (2000) states: "In general, the Simple Method is most appropriate for small watersheds (<640 acres) and when quick and reasonable stormwater pollutant load estimates are required". Rainfall data, land use (runoff coefficients), land area, and pollutant concentration are needed to use the Simple Method. For more information on the Simple Method, see The Simple method to Calculate Urban Stormwater Loads or The Simple Method for estimating phosphorus export.
Some simple stormwater calculators utilize the Simple Method (EPA STEPL, Watershed Treatment Model). The MPCA developed a simple calculator for estimating load reductions for TSS, total phosphorus, and bacteria. Called the MPCA Estimator, this tool was developed specifically for complying with the MS4 General Permit TMDL annual reporting requirement. The MPCA Estimator provides default values for pollutant concentration, runoff coefficients for different land uses, and precipitation, although the user can modify these and is encouraged to do so when local data exist. The user is required to enter area for different land uses and area treated by BMPs within each of the land uses. BMPs include infiltrators (e.g. bioinfiltration, infiltration basin, tree trench, permeable pavement, etc.), filters (biofiltration, sand filter, green roof), constructed ponds and wetlands, and swales/filters. The MPCA Estimator includes standard removal efficiencies for these BMPs, but the user can modify those values if better data are available. Output from the calculator is given as a load reduction (percent, mass, or number of bacteria) from the original estimated load. Default TSS removal fractions are 0.84 for wet basins and 0.73 for constructed wetlands. Default removal fractions for TP are 0.50 for wet basins and 0.38 for constructed wetlands.
Because the MPCA Estimator does not consider BMPs in series, makes simplifying assumptions about runoff and pollutant removal processes, and uses generalized default information, it should only be used for estimating pollutant reductions from an estimated load. It is not intended as a decision-making tool.
Download MPCA Estimator here: File:MPCA Estimator.xlsx
A quick guide for the estimator is available Quick Guide: MPCA Estimator tab.
The Minimal Impact Design Standards (MIDS) best management practice (BMP) calculator is a tool used to determine stormwater runoff volume and pollutant reduction capabilities of various BMPs, including constructed ponds and constructed wetlands. The MIDS calculator estimates the stormwater runoff volume reductions for various BMPs and annual pollutant load reductions for total phosphorus (including a breakdown between particulate and dissolved phosphorus) and total suspended solids (TSS). The calculator was intended for use on individual development sites, though capable modelers could modify its use for larger applications.
The MIDS calculator is designed in Microsoft Excel with a graphical user interface (GUI), packaged as a windows application, used to organize input parameters. The Excel spreadsheet conducts the calculations and stores parameters, while the GUI provides a platform that allows the user to enter data and presents results in a user-friendly manner.
Detailed guidance has been developed for all BMPs in the calculator, including constructed ponds and constructed wetlands. An overview of individual input parameters and workflows is presented in the MIDS Calculator User Documentation.
A simplified approach to computing a credit would be to apply a reduction value found in literature to the pollutant mass load or concentration (EMC) of the constructed pond or constructed wetland device. A more detailed explanation of the differences between mass load reductions and concentration (EMC) reductions can be found on the pollutant removal page.
Designers may use the pollutant reduction values in the Minnesota Stormwater Manual or may research values from other databases and published literature. Designers who opt for this approach should
The following references summarize pollutant reduction values from multiple studies or sources that could be used to determine credits. Users should note that there is a wide range of monitored pollutant removal effectiveness in the literature. Before selecting a literature value, users should compare the characteristics of the monitored site in the literature against the characteristics of the proposed stormwater pond, considering such conditions as watershed characteristics, pond sizing, and climate factors.
In the event that a credit is being calculated for an existing stormwater pond or wetland installation, field monitoring may be made in lieu of desktop calculations or models/calculators as described. Careful planning is HIGHLY RECOMMENDED before commencing a program to monitor the performance of a BMP. The general steps involved in planning and implementing BMP monitoring include the following.
The following guidance manuals have been developed to assist BMP owners and operators on how to plan and implement BMP performance monitoring.
Geosyntec Consultants and Wright Water Engineers prepared this guide in 2009 with support from the USEPA, Water Environment Research Foundation, Federal Highway Administration, and the Environment and Water Resource Institute of the American Society of Civil Engineers. This guide was developed to improve and standardize the protocols for all BMP monitoring and to provide additional guidance for Low Impact Development (LID) BMP monitoring. Highlighted chapters in this manual include:
AASHTO (American Association of State Highway and Transportation Officials) and the FHWA (Federal Highway Administration) sponsored this 2006 research report, which was authored by Oregon State University, Geosyntec Consultants, the University of Florida, and the Low Impact Development Center. The primary purpose of this report is to advise on the selection and design of BMPs that are best suited for highway runoff. The document includes chapters on performance monitoring that may be a useful reference for BMP performance monitoring, especially for the performance assessment of a highway BMP.
The most current version of this manual was released by the State of California, Department of Transportation in November 2013. As with the other monitoring manuals described, this manual does include guidance on planning a stormwater monitoring program. However, this manual is among the most thorough for field activities. Relevant chapters include.
This online manual was developed in 2010 by Andrew Erickson, Peter Weiss, and John Gulliver from the University of Minnesota and St. Anthony Falls Hydraulic Laboratory with funding provided by the Minnesota Pollution Control Agency. The manual advises on a four-level process to assess the performance of a Best Management Practice.
Level 1 activities do not produce numerical performance data that could be used to obtain a stormwater management credit. BMP owners and operators who are interested in using data obtained from Levels 2 and 3 should consult with the MPCA or other regulatory agency to determine if the results are appropriate for credit calculations. Level 4, Monitoring, is the method most frequently used for assessment of the performance of a BMP.
Use these links to obtain detailed information on the following topics related to BMP performance monitoring:
In addition to TSS and phosphorus, constructed basins can reduce loading of other pollutants. According to the International Stormwater Database, studies have shown that constructed basins are effective at reducing concentration of pollutants, including nutrients, metals, bacteria, cyanide, oils and grease, Volatile Organic Compounds (VOC), and Biological Oxygen Demand (BOD). A compilation of the pollutant removal capabilities from a review of literature are summarized below.
Other Pollutants Reduced by Constructed Basins: Stormwater Ponds
Link to this table
Pollutant Category | Constituent | Treatment Capabilities (Low = < 30%;
Medium = 30-65%; High = 65 -100%) |
---|---|---|
Metals1, 2 | Cd, Cr, Cu, Zn | Medium/High |
As, Fe, Ni, Pb | ||
Nutrients | Total Nitrogen, | Medium |
TKN | Low | |
Organics | High |
1 Results are for total metals only
2 Information on As was found only in the International Stormwater Database where removal was found to be low