m |
m |
||
Line 46: | Line 46: | ||
*Wenck. 2009. Phase 1 [https://www.pca.state.mn.us/sites/default/files/wq-b11-01.pdf Chloride Feasibility Study for the Twin Cities Metropolitan Area]. | *Wenck. 2009. Phase 1 [https://www.pca.state.mn.us/sites/default/files/wq-b11-01.pdf Chloride Feasibility Study for the Twin Cities Metropolitan Area]. | ||
*Xian, G., Homer, C., Dewitz, J., Fry, J., Hossain, N., and Wickham, J., 2011. [http://www.mrlc.gov/ The change of impervious surface area between 2001 and 2006 in the conterminous United States. Photogrammetric Engineering and Remote Sensing], Vol. 77(8): 758-762. | *Xian, G., Homer, C., Dewitz, J., Fry, J., Hossain, N., and Wickham, J., 2011. [http://www.mrlc.gov/ The change of impervious surface area between 2001 and 2006 in the conterminous United States. Photogrammetric Engineering and Remote Sensing], Vol. 77(8): 758-762. | ||
+ | |||
+ | <noinclude> | ||
+ | ==Related pages== | ||
+ | *[[TCMA Chloride Management Plan - Background and Description]] | ||
+ | *[[TCMA Chloride Management Plan - TCMA Chloride Conditions]] | ||
+ | *[[TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection]] | ||
+ | *[[TCMA Chloride Management Plan - Monitoring, tracking, reporting, and adaptive management]] | ||
+ | *[[TCMA Chloride Management Plan - Research Needs]] | ||
+ | *[[TCMA Chloride Management Plan - Stakeholder and Public Involvement Process]] | ||
+ | *[[TCMA Chloride Management Plan - Appendix A – TCMA Chloride TMDL]] | ||
+ | *[[TCMA Chloride Management Plan - Appendix B – Winter Maintenance Assessment tool (WMAt)]] | ||
+ | *[[TCMA Chloride Management Plan - Appendix C – Sidewalk Survey Results]] | ||
+ | *[[TCMA Chloride Management Plan - Appendix D – Educational Resources]] | ||
+ | *[[TCMA Chloride Management Plan - References]] | ||
+ | </noinclude> |
Transportation.