Line 11: | Line 11: | ||
=== Permit Requirements related to TMDLs=== | === Permit Requirements related to TMDLs=== | ||
*[[Summary of TMDL requirements in stormwater permits]] | *[[Summary of TMDL requirements in stormwater permits]] | ||
+ | *'''''NEW''''' The list of best management practices (BMPs) or activities that will be considered as progress toward meeting wasteload allocations (WLAs) for Total Maximum Daily Loads can be found in this spreadsheet: [[File:2020_MS4_General_Permit_BMP_List_for_Manual_April2023.xlsx]] | ||
+ | |||
Until the e-service is operational, permittees should keep track of the following: | Until the e-service is operational, permittees should keep track of the following: | ||
Line 17: | Line 19: | ||
*Implemented BMPs for each applicable WLA since the Total Maximum Daily Load (TMDL) baseline year, including: | *Implemented BMPs for each applicable WLA since the Total Maximum Daily Load (TMDL) baseline year, including: | ||
**BMP category, BMP type, and BMP status <!--(see TMDL annual report webpage for more information)--> | **BMP category, BMP type, and BMP status <!--(see TMDL annual report webpage for more information)--> | ||
− | *For constructed basins, filtration, infiltration, stormwater reuse | + | *For constructed basins, filtration, infiltration, stormwater reuse BMPs: |
**Location (i.e., geographic coordinates) | **Location (i.e., geographic coordinates) | ||
**Quantitative pollutant reductions per BMP | **Quantitative pollutant reductions per BMP | ||
+ | *For street sweeping and chemical treatment of stormwater practices: | ||
+ | **Quantifying reductions is optional | ||
====For chloride TMDLs==== | ====For chloride TMDLs==== | ||
*Amount of deicing salt used each winter maintenance season | *Amount of deicing salt used each winter maintenance season |
If you (an MS4 Permittee covered under the 2020 MS4 General Permit) are assigned one or more Wasteload Allocation (WLA) in a Total Maximum Daily Load (TMDL) that was approved by the United States Environmental Protection Agency (USEPA) prior to November 16, 2020, and were not meeting the WLA(s) when you applied for permit coverage, you must complete the TMDL Annual Report to demonstrate progress toward meeting the WLA(s).
The MPCA is in the process of developing a new e-service for both the MS4 annual report and the TMDL annual report. There will be no TMDL Annual Report submission in calendar year 2023. Permittees will be expected to report on 2022 activities once the e-service is operational.
Until the e-service is operational, permittees should keep track of the following:
If you submitted TMDL Annual Reports under the 2013 MS4 General Permit, there will be some changes to the BMP categories and types (herein referred to as the BMP list). The draft BMP list should be ready in the Spring of 2023 and will be posted on this page once completed. The BMP list is the naming convention for different BMPs and is important for consistency in annual reporting. Using the BMP list will help you be prepared to easily enter and label BMPs to demonstrate progress towards achieving applicable WLAs in the new annual report e-service.
Refer to your submitted Custom TMDL Application if you are unsure of which TMDL WLAs need to be reported on. Contact Anna Bosch with questions.
For more information about the non-TMDL portion of the MS4 annual report, visit the MS4 annual report webpage.