...no underdrain) and biofiltration (bioretention with an underdrain) as BMP options. For biofiltration the underdrain may be at or raised above the bottom of t
...of the soil/media surface in the bioinfiltration basin. There are 14 soil options for the user. These correspond with soils and infiltration rates contained
23 KB (3,556 words) - 13:18, 29 January 2023
**Routing/downstream BMP: if this BMP is part of a treatment train and water is being routed from this BMP to another BMP, the user sele
...t of the soil/media interface in the permeable pavement. There are 14 soil options that fall into 4 different Hydrologic Soil Groups (Hydrologic Soil Group (H
20 KB (3,173 words) - 18:54, 23 November 2022
...his BMP is part of a [[Using the treatment train approach to BMP selection|treatment train]] and water is being routed from this BMP to another BMP, the user se
...t of the soil/media interface in the infiltration basin. There are 14 soil options that fall into 4 different Hydrologic Soil Groups (Hydrologic Soil Group (H
22 KB (3,347 words) - 13:33, 29 January 2023
...his BMP is part of a [[Using the treatment train approach to BMP selection|treatment train]] and water is being routed from this BMP to another BMP, the user se
...edia/native soil interface of the bioinfiltration basin. There are 14 soil options that fall into 4 different Hydrologic Soil Groups (Hydrologic Soil Group (H
23 KB (3,549 words) - 18:50, 23 November 2022
**'''Routing/downstream BMP:''' if this BMP is part of a treatment train and water is being routed from this BMP to another BMP, the user sele
...t of the soil/media interface in the infiltration basin. There are 14 soil options that fall into 4 different Hydrologic Soil Groups ([http://stormwater.pca.s
24 KB (3,705 words) - 19:11, 23 November 2022
...his BMP is part of a [[Using the treatment train approach to BMP selection|treatment train]] and water is being routed from this BMP to another BMP, the user se
===Required Treatment Volume===
17 KB (2,658 words) - 19:09, 23 November 2022
...porting stormwater; not a combined sewer; and not part of a publicly owned treatment works."> '''MS4'''</span> permittees for interpreting categorical WLAs.
...porting stormwater; not a combined sewer; and not part of a publicly owned treatment works."> '''MS4'''</span> (Municipal Separate Storm Sewer System) <span tit
16 KB (2,510 words) - 14:31, 23 January 2023
...his BMP is part of a [[Using the treatment train approach to BMP selection|treatment train]] and water is being routed from this BMP to another BMP, the user se
...e media/native soil interface of the swale main channel. There are 14 soil options that fall into 4 different Hydrologic Soil Groups (Hydrologic Soil Group (H
31 KB (4,982 words) - 13:36, 29 January 2023
...his BMP is part of a [[Using the treatment train approach to BMP selection|treatment train]] and water is being routed from this BMP to another BMP, the user se
...ioretention base is utilized) of the swale main channel. There are 14 soil options that fall into 4 different Hydrologic Soil Groups (Hydrologic Soil Group (H
33 KB (5,347 words) - 13:38, 29 January 2023
...his BMP is part of a [[Using the treatment train approach to BMP selection|treatment train]] and overflow water that bypasses the storage device is being routed
===Required Treatment Volume===
28 KB (4,546 words) - 22:47, 28 January 2023
**meeting permanent treatment requirements in the [http://www.pca.state.mn.us/index.php/water/water-types
#[[Design Sequence Flowchart-Flexible treatment options]]
12 KB (1,710 words) - 14:44, 6 February 2023
...his BMP is part of a [[Using the treatment train approach to BMP selection|treatment train]] and water is being routed from this BMP to another BMP, the user se
...t below the soil/media interface in the tree trench/box. There are 14 soil options that fall into 4 different [[Glossary#H|Hydrologic Soil Groups]] (Hydrologi
33 KB (5,371 words) - 19:08, 23 November 2022
...in for constructed ponds in new development, 9.Case studies for stormwater treatment trains, 10.Process for selecting Best Management Practices"> '''See content
...d engineered media removed from bioretention basins and similar stormwater treatment devices]]
56 KB (8,201 words) - 14:14, 2 April 2024
...e.mn.us/index.php?title=Design_criteria_for_bioretention#Layered_systems a treatment layer below the bioretention media]. This typically is a layer containing 5
...his BMP is part of a [[Using the treatment train approach to BMP selection|treatment train]] and water is being routed from this BMP to another BMP, the user se
55 KB (8,696 words) - 13:27, 29 January 2023
...will best meet local and state stormwater objectives. This page presents a flexible approach to [[Glossary#B|Best Management Practices]] (BMP) selection that a
...ents is a compilation of additional measures that could be used to enhance treatment either before or after more complex BMP use.</p>
40 KB (6,039 words) - 14:08, 11 February 2023
...e.mn.us/index.php?title=Design_criteria_for_bioretention#Layered_systems a treatment layer below the bioretention media]. This typically is a layer containing 5
**Routing/downstream BMP: if this BMP is part of a treatment train and water is being routed from this BMP to another BMP, the user sele
44 KB (7,312 words) - 13:41, 29 January 2023
...98a) and promote the [[Using the treatment train approach to BMP selection|treatment train approach]] to runoff management.
...er stormwater runoff from upland areas of the site. To optimize stormwater treatment, the outer boundary of the buffer should have a stormwater depression area
71 KB (10,558 words) - 11:52, 2 February 2023
...winter maintenance programs and should not be considered the best or only options for salt reducing activities, but rather a list of BMPs that many programs
...which could generate heat as well as electricity, permeable pavements, and flexible pavements. Narrower roadways may also allow for less application of deicing
24 KB (3,565 words) - 16:10, 23 November 2022
*Other options include 1.5-inch clean gravel and river rock.
...re pre-fabricated triangular shaped blocks typically made of foam or other flexible, lightweight material and covered with geotextile fabric. The geotextile ex
28 KB (4,232 words) - 14:27, 14 February 2023
...erlocking pavements ([[References for permeable pavement|Smith 2011]]) use flexible pavement design methods adopted from the 1993 AASHTO ''Guide for Design of
...ngths than those noted above, or are expansive when wet, there are several options, including
44 KB (6,544 words) - 17:30, 29 December 2022