(Created page with "<center><font size=3></font size><br> Link to this table</center> <table class="sortable"><tr> <th>BMP group</th> <th>...")
 
m
 
(9 intermediate revisions by 2 users not shown)
Line 1: Line 1:
<center><font size=3></font size><br>
+
<font size=3>'''This table shows guidance on BMP suitability for different stormwater strategies.'''</font size><br>
Link to this [[BMP suitability for different stormwater strategies|table]]</center>
+
Link to this [[BMP suitability for different stormwater strategies|table]]
  
 
<table class="sortable"><tr>
 
<table class="sortable"><tr>
Line 50: Line 50:
 
<tr>
 
<tr>
 
<td>Stormwater ponds</td>
 
<td>Stormwater ponds</td>
<td>No<sup>c</sup></td>
+
<td>No<sup>d</sup></td>
 
<td>Yes</td>
 
<td>Yes</td>
 
<td>Yes</td>
 
<td>Yes</td>
Line 57: Line 57:
 
<tr>
 
<tr>
 
<td>Constructed wetlands</td>
 
<td>Constructed wetlands</td>
<td>Varies<sup>c</sup></td>
+
<td>Varies<sup>d</sup></td>
 
<td>Yes</td>
 
<td>Yes</td>
 
<td>Yes</td>
 
<td>Yes</td>
Line 66: Line 66:
 
<td>Varies</td>
 
<td>Varies</td>
 
<td>No<sup>b</sup></td>
 
<td>No<sup>b</sup></td>
<td>Possible</td>
+
<td>Possible<sup>b</sup></td>
 
<td>No</td>
 
<td>No</td>
 
<td>No<sup>e</sup></td>
 
<td>No<sup>e</sup></td>
 
</tr>
 
</tr>
 
</table>
 
</table>
<font size=1><sup>a</sup><br>See section on [[Unified sizing criteria|unified sizing criteria]] for more information
+
<font size=1><sup>a</sup>See section on [[Unified sizing criteria|unified sizing criteria]] for more information<br>
<sup>b</sup><br>Can be incorporated into the structural control in certain situations
+
<sup>b</sup>Can be incorporated into the structural control in certain situations<br>
<sup>c</sup><br>May be provided by infiltration
+
<sup>c</sup>May be provided by infiltration<br>
<sup>d</sup><br>When impermeable liners are required or pool intercepts groundwater
+
<sup>d</sup>When impermeable liners are required or pool intercepts groundwater<br>
 
<sup>e</sup>Can be included as part of the treatment train</font size>
 
<sup>e</sup>Can be included as part of the treatment train</font size>
 +
 +
<noinclude>
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/General bmp information]]
 +
</noinclude>

Latest revision as of 20:04, 4 August 2022

This table shows guidance on BMP suitability for different stormwater strategies.
Link to this table

BMP group Rechargea Water qualitya Channel protectiona Peak dischargea Hot spot runoff
Bioretention Varies Yes Possibleb No Yes. Needs underdrain
Filtration - media No Yes No No Yes
Filtration - vegetative Variesc Yes Possibleb NoYes
Infiltration trench Yes Yes No No No
Infiltration basin Yes Yes Yes YesNo
Stormwater ponds Nod Yes Yes YesYes
Constructed wetlands Variesd Yes Yes YesYes. Needs pre-treatment
Supplemental BMPs Varies Nob Possibleb No Noe

aSee section on unified sizing criteria for more information
bCan be incorporated into the structural control in certain situations
cMay be provided by infiltration
dWhen impermeable liners are required or pool intercepts groundwater
eCan be included as part of the treatment train

This page was last edited on 4 August 2022, at 20:04.