(Added highlighted version of draft permit)
m (added links to subtitled videos on youtube)
 
(19 intermediate revisions by 4 users not shown)
Line 1: Line 1:
The MPCA is in the process of reissuing the MS4 General Permit. At this time, the MPCA anticipates the MS4 General Permit to be reissued in Fall 2019. Although the current MS4 General Permit expired on July 31, 2018, those covered under the current permit will continue to operate under it until the MPCA reissues the new permit. The new permit is subject to the [https://www.epa.gov/npdes/npdes-stormwater-final-ms4-general-permit-remand-rule NPDES Stormwater Final MS4 General Permit Remand Rule], which emphasizes permit requirements to be “clear, specific, and measurable.”
+
The MPCA reissued the MS4 General Permit (MNR040000) on November 16, 2020. The final permit and response to comments document is available at: https://www.pca.state.mn.us/water/municipal-stormwater-ms4
  
==Informal pre-public notice documents==
+
==MS4 Permit Part 2 Application==
The following documents are open for informal review and comment through '''June 6, 2019''':
+
Existing MS4 permittees (i.e., permittees that are currently covered under the 2013 MS4 General Permit) are required to complete and submit the following application forms to the MPCA by April 15, 2021:
  
'''Draft MS4 General Permit''': [[File:Draft MS4 Permit (5.7.2019).pdf]]
+
1. MS4 Permit Part 2 Application: https://www.pca.state.mn.us/water/2020-ms4-general-permit
  
'''Draft MS4 Permit TMDL Requirements''': [[File:Draft MS4 Permit TMDL Requirements Summary (5.7.2019).pdf]]
+
2. MS4 Permit TMDL Application: https://stormwater.pca.state.mn.us/index.php?title=2020_MS4_General_Permit_TMDL_Application
  
'''(Added May 21, 2019) Draft MS4 General Permit-Highlighted Version''': [[File:Draft MS4 Permit (5.7.2019)-Highlighted Version.pdf]]
 
This version highlights permit requirements the MPCA finds notable, such as new requirements or existing requirements where additional specificity was included from the 2013 MS4 General Permit. Please note this version does not highlight every change from the 2013 MS4 General Permit, such as requirements that were reorganized, reworded, or removed.
 
  
==Comments?==
+
[[File:MS4 Part 2 Permit Application Form - Quick Overview.mp4|thumb||alt=Video overview of the MS4 Permit Part 2 Application Form|<font size=3>Video overview of the MS4 Permit Part 2 Application Form ([https://www.youtube.com/watch?v=Z4aKW9yCC1Y click here for subtitled version]) </font size>]]
To provide comments, please follow the instructions in the survey form at http://survey.mn.gov/s.asp?k=154110622799.  The MPCA will review and consider all comments received and may make changes to the draft permit based on those comments, but the MPCA will not respond to each comment. The MPCA will provide formal responses to public comments, in accordance with Minn. R. 7001.1070, after the formal public comment period, which is planned for later this summer.
 
  
==Questions?==
+
==MS4 Permit Part 2 Application form - Quick Overview Video==
Please send questions to Cole Landgraf at [mailto:cole.landgraf@state.mn.us cole.landgraf@state.mn.us].
+
This video provides a quick overview of the application form, including what to expect and how to prepare before filling out the MS4 Permit Part 2 Application form.
 +
 
 +
==Guidance materials for new permit requirements==
 +
*[[New permit requirements and related guidance materials]]
 +
*[[Summary of TMDL requirements in stormwater permits]]
 +
*[[Guidance for completing the MS4 Permit TMDL Application Form]]
 +
 
 +
<noinclude>
 +
[[Category:Level 3 - Regulatory/Municipal (MS4)/Guidance, outreach materials, miscellaneous information]]
 +
[[Category:Level 2 - Regulatory/Municipal (MS4)]]
 +
</noinclude>

Latest revision as of 15:51, 29 August 2023

The MPCA reissued the MS4 General Permit (MNR040000) on November 16, 2020. The final permit and response to comments document is available at: https://www.pca.state.mn.us/water/municipal-stormwater-ms4

MS4 Permit Part 2 Application

Existing MS4 permittees (i.e., permittees that are currently covered under the 2013 MS4 General Permit) are required to complete and submit the following application forms to the MPCA by April 15, 2021:

1. MS4 Permit Part 2 Application: https://www.pca.state.mn.us/water/2020-ms4-general-permit

2. MS4 Permit TMDL Application: https://stormwater.pca.state.mn.us/index.php?title=2020_MS4_General_Permit_TMDL_Application


MS4 Permit Part 2 Application form - Quick Overview Video

This video provides a quick overview of the application form, including what to expect and how to prepare before filling out the MS4 Permit Part 2 Application form.

Guidance materials for new permit requirements

This page was last edited on 29 August 2023, at 15:51.