(Added Draft Permit and Received Comments)
m (added links to subtitled videos on youtube)
 
(17 intermediate revisions by 4 users not shown)
Line 1: Line 1:
The MPCA is in the process of reissuing the MS4 General Permit. At this time, the MPCA anticipates the MS4 General Permit to be reissued in Fall 2019. Although the current MS4 General Permit expired on July 31, 2018, those covered under the current permit will continue to operate under it until the MPCA reissues the new permit. The new permit is subject to the [https://www.epa.gov/npdes/npdes-stormwater-final-ms4-general-permit-remand-rule NPDES Stormwater Final MS4 General Permit Remand Rule], which emphasizes permit requirements to be “clear, specific, and measurable.”
+
The MPCA reissued the MS4 General Permit (MNR040000) on November 16, 2020. The final permit and response to comments document is available at: https://www.pca.state.mn.us/water/municipal-stormwater-ms4
  
==Informal pre-public notice==
+
==MS4 Permit Part 2 Application==
Thank you for participating in the informal pre-public notice comment period (May 7, 2019 through June 6, 2019) on the initial draft MS4 General Permit. The MPCA is in the process of reviewing all comments and considering changes to the permit before the formal public comment period, which is planned for later this summer. The initial draft permit and received comments are available below.
+
Existing MS4 permittees (i.e., permittees that are currently covered under the 2013 MS4 General Permit) are required to complete and submit the following application forms to the MPCA by April 15, 2021:
  
==Initial Draft MS4 General Permit==
+
1. MS4 Permit Part 2 Application: https://www.pca.state.mn.us/water/2020-ms4-general-permit
[[File:Draft_MS4_Permit_(5.7.2019).pdf]]
 
  
==Comments on Initial Draft MS4 General Permit==
+
2. MS4 Permit TMDL Application: https://stormwater.pca.state.mn.us/index.php?title=2020_MS4_General_Permit_TMDL_Application
[[File:Organized_Comments_on_Draft_MS4_Permit.pdf]]
+
 
 +
 
 +
[[File:MS4 Part 2 Permit Application Form - Quick Overview.mp4|thumb||alt=Video overview of the MS4 Permit Part 2 Application Form|<font size=3>Video overview of the MS4 Permit Part 2 Application Form ([https://www.youtube.com/watch?v=Z4aKW9yCC1Y click here for subtitled version]) </font size>]]
 +
 
 +
==MS4 Permit Part 2 Application form - Quick Overview Video==
 +
This video provides a quick overview of the application form, including what to expect and how to prepare before filling out the MS4 Permit Part 2 Application form.
 +
 
 +
==Guidance materials for new permit requirements==
 +
*[[New permit requirements and related guidance materials]]
 +
*[[Summary of TMDL requirements in stormwater permits]]
 +
*[[Guidance for completing the MS4 Permit TMDL Application Form]]
 +
 
 +
<noinclude>
 +
[[Category:Level 3 - Regulatory/Municipal (MS4)/Guidance, outreach materials, miscellaneous information]]
 +
[[Category:Level 2 - Regulatory/Municipal (MS4)]]
 +
</noinclude>

Latest revision as of 15:51, 29 August 2023

The MPCA reissued the MS4 General Permit (MNR040000) on November 16, 2020. The final permit and response to comments document is available at: https://www.pca.state.mn.us/water/municipal-stormwater-ms4

MS4 Permit Part 2 Application

Existing MS4 permittees (i.e., permittees that are currently covered under the 2013 MS4 General Permit) are required to complete and submit the following application forms to the MPCA by April 15, 2021:

1. MS4 Permit Part 2 Application: https://www.pca.state.mn.us/water/2020-ms4-general-permit

2. MS4 Permit TMDL Application: https://stormwater.pca.state.mn.us/index.php?title=2020_MS4_General_Permit_TMDL_Application


MS4 Permit Part 2 Application form - Quick Overview Video

This video provides a quick overview of the application form, including what to expect and how to prepare before filling out the MS4 Permit Part 2 Application form.

Guidance materials for new permit requirements

This page was last edited on 29 August 2023, at 15:51.