(Created page with "<center><font size=3>'''Step 3 Calibration Chart for auger or conveyor systems'''</font size><br> Link to this [[Step 3 Calibration Chart for auger or conveyor systems|table]...")
 
Line 72: Line 72:
 
</table>
 
</table>
  
'''*top half of each row = lbs/lane mile.  To get this number, multiply lbs/min by the factor shown for each speed
+
'''*top half of each row = lbs/lane mile.  To get this number, multiply lbs/min by the factor shown for each speed''
''**bottom half of each row = lbs/1000 sq ft.  To find this, divide the number in the top half by 63
+
 
 +
''**bottom half of each row = lbs/1000 sq ft.  To find this, divide the number in the top half by 63''
  
 
[[category:Table]]
 
[[category:Table]]

Revision as of 17:07, 24 February 2016

Step 3 Calibration Chart for auger or conveyor systems
Link to this table

Date ___Aug 8 2015___________

Spreader # ____A4219______

Material ___Rock Salt____________


Setting Pounds per minute 5 mph (X12) 10 mph (X6) 15 mph (X4) 20 mph (X3)
1 10 * 120 60 40 30
**
2 22 264 132 88 66
3 34 408 204 136 102

'*top half of each row = lbs/lane mile. To get this number, multiply lbs/min by the factor shown for each speed

**bottom half of each row = lbs/1000 sq ft. To find this, divide the number in the top half by 63