<center><font size=3>'''Temporary Sediment Control: Corrective Actions - check damns'''</font size><br>
+
<font size=3>'''Temporary Sediment Control: Corrective Actions - check damns'''</font size><br>
 
+
Link to this [[Temporary Sediment Control: Corrective Actions - check damns|table]]
Link to this [[Temporary Sediment Control: Corrective Actions - check damns|table]]</center>
 
  
 
<table class="sortable">
 
<table class="sortable">
Line 9: Line 8:
 
<th>Corrective Action</th>
 
<th>Corrective Action</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Ditch checks (see also sediment control logs)</td>
 
<td>Ditch checks (see also sediment control logs)</td>
<td>Sediment control logs not properly trenched, staked, or both
+
<td>
Not stapled properly for blanket and sediment control log system
+
*Sediment control logs not properly trenched, staked, or both
Water flows around the end rather than over the middle
+
*Not stapled properly for blanket and sediment control log system
Incorrect spacing of checks
+
*Water flows around the end rather than over the middle
No geotextile liner used for rock weeper system or rock checks
+
*Incorrect spacing of checks
Wrong one installed for intended or plan application
+
*No geotextile liner used for rock weeper system or rock checks
 +
*Wrong one installed for intended or plan application
 
</td>
 
</td>
<td>Remove sediment control logs and provide trench, and angle stake as per detail
+
<td>
Add more staples as per detail
+
*Remove sediment control logs and provide trench, and angle stake as per detail
 
+
*Add more staples as per detail
Extend length of log where end is higher than middle
+
*Extend length of log where end is higher than middle
Add more checks following spacing detail
+
*Add more checks following spacing detail
Remove rock and add geotextile
+
*Remove rock and add geotextile
 
+
*Remove improper check and install  as per plan or amendment
Remove improper check and install  as per plan or amendment
 
 
</td>
 
</td>
 
</tr>
 
</tr>
 
 
 
 
<tr>
 
<tr>
 
<td>Sediment control logs</td>
 
<td>Sediment control logs</td>
<td>Not staked properly resulting in undermining or movement of logs
+
<td>
Log ends not overlapped when more than one is needed in a line
+
*Not staked properly resulting in undermining or movement of logs
 +
*Log ends not overlapped when more than one is needed in a line
 
</td>
 
</td>
<td>Install additional stakes
+
<td>
 
+
*Install additional stakes
Reconfigure logs for overlap
+
*Reconfigure logs for overlap
 
</td>
 
</td>
 
</tr>
 
</tr>
 
 
 
 
 
</table>
 
</table>
 
 
 
 
  
 
[[category:Table]]
 
[[category:Table]]

Revision as of 01:38, 30 October 2016

Temporary Sediment Control: Corrective Actions - check damns
Link to this table

Item Corrective Action Required if Corrective Action
Ditch checks (see also sediment control logs)
  • Sediment control logs not properly trenched, staked, or both
  • Not stapled properly for blanket and sediment control log system
  • Water flows around the end rather than over the middle
  • Incorrect spacing of checks
  • No geotextile liner used for rock weeper system or rock checks
  • Wrong one installed for intended or plan application
  • Remove sediment control logs and provide trench, and angle stake as per detail
  • Add more staples as per detail
  • Extend length of log where end is higher than middle
  • Add more checks following spacing detail
  • Remove rock and add geotextile
  • Remove improper check and install as per plan or amendment
Sediment control logs
  • Not staked properly resulting in undermining or movement of logs
  • Log ends not overlapped when more than one is needed in a line
  • Install additional stakes
  • Reconfigure logs for overlap