*Determine if there are other prohibitions on infiltration. Infiltration is prohibited if any of the following conditions apply. | *Determine if there are other prohibitions on infiltration. Infiltration is prohibited if any of the following conditions apply. | ||
**The infiltration practice (BMP) is less than 100 feet from a drinking water supply well in a sensitive aquifer or less than 50 feet from a drinking water well in a non-sensitive aquifer. ([http://stormwater.pca.state.mn.us/index.php/Stormwater_infiltration_and_setback_%28separation%29_distances#Water_supply_wells link]). | **The infiltration practice (BMP) is less than 100 feet from a drinking water supply well in a sensitive aquifer or less than 50 feet from a drinking water well in a non-sensitive aquifer. ([http://stormwater.pca.state.mn.us/index.php/Stormwater_infiltration_and_setback_%28separation%29_distances#Water_supply_wells link]). | ||
+ | **The infiltration practice receives discharges from vehicle fueling and maintenance. | ||
**A Construction Stormwater General (CGP) permit is required and any of the following conditions applies. | **A Construction Stormwater General (CGP) permit is required and any of the following conditions applies. | ||
− | |||
***There is less than three (3) feet of separation distance from the bottom of the infiltration system to the elevation of the seasonally saturated soils or the top of bedrock. ([http://stormwater.pca.state.mn.us/index.php/Shallow_soils_and_shallow_depth_to_bedrock link]) | ***There is less than three (3) feet of separation distance from the bottom of the infiltration system to the elevation of the seasonally saturated soils or the top of bedrock. ([http://stormwater.pca.state.mn.us/index.php/Shallow_soils_and_shallow_depth_to_bedrock link]) | ||
− | ***The infiltration practice receives discharges from industrial facilities which are not authorized to infiltrate industrial stormwater under an NPDES/SDS Industrial Stormwater Permit issued by the MPCA. To determine if infiltration is allowed for a specific industrial sector or subsector, go to the [ | + | ***The infiltration practice receives discharges from industrial facilities which are not authorized to infiltrate industrial stormwater under an NPDES/SDS Industrial Stormwater Permit issued by the MPCA. To determine if infiltration is allowed for a specific industrial sector or subsector, go to the [https://stormwater.pca.state.mn.us/index.php?title=Industrial_stormwater_program list of sectors], select the sector of interest, and review section 8 for that sector (''Use of Infiltration Devices and/or Industrial Stormwater Ponds for Stormwater Treatment and Disposal'') |
***The infiltration practice receives discharges from areas with high levels of contaminants in soil or groundwater and contaminants will be mobilized by the infiltrating stormwater. ([http://stormwater.pca.state.mn.us/index.php/Stormwater_infiltrations_and_contaminated_soils_and_groundwater link]) | ***The infiltration practice receives discharges from areas with high levels of contaminants in soil or groundwater and contaminants will be mobilized by the infiltrating stormwater. ([http://stormwater.pca.state.mn.us/index.php/Stormwater_infiltrations_and_contaminated_soils_and_groundwater link]) | ||
***The infiltration practice is located in areas of predominately Hydrologic Soil Group D (clay) soils. ([http://stormwater.pca.state.mn.us/index.php/Soils_with_low_infiltration_capacity link]) | ***The infiltration practice is located in areas of predominately Hydrologic Soil Group D (clay) soils. ([http://stormwater.pca.state.mn.us/index.php/Soils_with_low_infiltration_capacity link]) | ||
Line 45: | Line 45: | ||
==Information needed== | ==Information needed== | ||
Site review is necessary to determine if stormwater runoff can be infiltrated at a site. A site review includes both a review of information and field sampling. The following information may be of use in conducting a site review | Site review is necessary to determine if stormwater runoff can be infiltrated at a site. A site review includes both a review of information and field sampling. The following information may be of use in conducting a site review | ||
− | *[ | + | *[https://earthexplorer.usgs.gov/ Aerial photos] and [https://www.usgs.gov/programs/national-geospatial-program/topographic-maps topographic maps]: used to determine slopes and distance to slopes, presence of surface water features, presence of sinkholes |
*[http://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm County soil surveys] and other soil information as available: used to determine likely soil infiltration rates, depth to saturated soil | *[http://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm County soil surveys] and other soil information as available: used to determine likely soil infiltration rates, depth to saturated soil | ||
*[http://www.dnr.state.mn.us/waters/groundwater_section/mapping/index.html County Geologic Atlas]: used to determine depth to bedrock, presence of karst, information for conducting mounding assessment | *[http://www.dnr.state.mn.us/waters/groundwater_section/mapping/index.html County Geologic Atlas]: used to determine depth to bedrock, presence of karst, information for conducting mounding assessment | ||
*Local groundwater levels: used to determine depth to water, information for conducting mounding assessment | *Local groundwater levels: used to determine depth to water, information for conducting mounding assessment | ||
− | *DWSMA and [ | + | *DWSMA and [https://www.health.state.mn.us/communities/environment/water/swp/index.htm Wellhead Protection] maps: used to determine location of DWSMA, travel times to drinking water supply wells |
− | *Soil borings: used to confirm depth to saturated soil and bedrock, presence of contaminated soil or groundwater, presence of karst features; information collected can be used to verify soil types and [http://stormwater.pca.state.mn.us/index.php/Design_infiltration_rates infiltration rates can be determined] knowing the soil type | + | *[https://stormwater.pca.state.mn.us/index.php?title=Understanding_and_interpreting_soils_and_soil_boring_reports_for_infiltration_BMPs Soil borings]: used to confirm depth to saturated soil and bedrock, presence of contaminated soil or groundwater, presence of karst features; information collected can be used to verify soil types and [http://stormwater.pca.state.mn.us/index.php/Design_infiltration_rates infiltration rates can be determined] knowing the soil type |
*Site survey: used to confirm presence of specific features such as buildings, structures, utilities, slopes, bedrock outcrops, septic systems, drinking water wells | *Site survey: used to confirm presence of specific features such as buildings, structures, utilities, slopes, bedrock outcrops, septic systems, drinking water wells | ||
*[http://www.pca.state.mn.us/index.php/data/wimn-whats-in-my-neighborhood/whats-in-my-neighborhood.html MPCA listing of potentially contaminated sites]: used to identify confirmed or likely sources of contaminated soil or groundwater | *[http://www.pca.state.mn.us/index.php/data/wimn-whats-in-my-neighborhood/whats-in-my-neighborhood.html MPCA listing of potentially contaminated sites]: used to identify confirmed or likely sources of contaminated soil or groundwater | ||
− | *[ | + | *[https://dnr.wi.gov/files/PDF/pubs/sb/sb007.pdf Phase 1 and 2 Environmental Site Assessments], [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/minnesotas-impaired-waters-and-tmdls/minnesotas-impaired-waters-and-total-maximum-daily-loads-tmdls.html TMDLs] and local [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/minnesotas-impaired-waters-and-tmdls/impaired-waters-list.html water quality standards]: used to determine appropriate stormwater treatment practices and location of those practices |
− | *[ | + | *[https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm Soil surveys], [https://bwsr.state.mn.us/wetland-functional-assessment MNRAM assessments], and [https://www.dnr.state.mn.us/wetlands/index.html wetland classifications]: used to determine presence of surface water features, depth to saturated soil |
*Proposed conditions, conceptual/preliminary site design | *Proposed conditions, conceptual/preliminary site design | ||
*Local zoning and land use requirements/ordinances, including stormwater rate control requirements: used to determine prohibitions or restrictions | *Local zoning and land use requirements/ordinances, including stormwater rate control requirements: used to determine prohibitions or restrictions | ||
Line 82: | Line 82: | ||
:FC = the soil or media field capacity, in ft<sup>3</sup>/ft<sup>3</sup>. | :FC = the soil or media field capacity, in ft<sup>3</sup>/ft<sup>3</sup>. | ||
− | BMPs with ponded water include bioinfiltration, infiltration trench, | + | BMPs with ponded water include bioinfiltration, infiltration trench, infiltration basin, and swales with check dams. BMPs with water stored in the soil or media include tree trench, tree box, permeable pavement, and swales with no check dams. |
Specific equations for sizing can be found within [http://stormwater.pca.state.mn.us/index.php/Category:Calculating_credits articles discussing credits for individual BMPs]. | Specific equations for sizing can be found within [http://stormwater.pca.state.mn.us/index.php/Category:Calculating_credits articles discussing credits for individual BMPs]. | ||
Line 99: | Line 99: | ||
*Wisconsin: [http://dnr.wi.gov/topic/stormwater/documents/techstd1002.pdf Site Evaluation for Stormwater Infiltration] | *Wisconsin: [http://dnr.wi.gov/topic/stormwater/documents/techstd1002.pdf Site Evaluation for Stormwater Infiltration] | ||
*Strategies/Guidance for Managing Stormwater: [http://ascelibrary.org/doi/abs/10.1061/40792(173)228 Infiltration vs. Surface Water Discharge.] Clark, S., Baker, K., Lalor, M., Mikula, J., and Burkhardt, C. (2005). Impacts of Global Climate Change: pp. 1-12. doi: 10.1061/40792(173)228. | *Strategies/Guidance for Managing Stormwater: [http://ascelibrary.org/doi/abs/10.1061/40792(173)228 Infiltration vs. Surface Water Discharge.] Clark, S., Baker, K., Lalor, M., Mikula, J., and Burkhardt, C. (2005). Impacts of Global Climate Change: pp. 1-12. doi: 10.1061/40792(173)228. | ||
− | *[https://www. | + | *[https://www.iwapublishing.com/books/9781843393382/research-digest-infiltration-vs-surface-water-discharge-guidance-stormwater Research Digest: Infiltration vs. Surface Water Discharge: Guidance for Stormwater Managers]. 2010. Water Environment Research Foundation. |
− | In addition to the above references, the [http://stormwater.pca.state.mn.us/index.php/Overview_of_Minimal_Impact_Design_Standards_%28MIDS%29 Minimal Impact Design Standards] (MIDS) design sequence flowchart can be used to make decisions about the potential for infiltrating stormwater at a site. Although the flowchart focuses on [http://stormwater.pca.state.mn.us/index.php/Performance_goals_for_new_development,_re-development_and_linear_projects MIDS performance goals], it can be adapted to help determine if infiltration prohibitions exist at a site. Potential constraints to infiltration, with links to the [http://stormwater.pca.state.mn.us/index.php/Design_Sequence_Flowchart-Flexible_treatment_options MIDS flowchart] and other guidance in this manual, are shown below. | + | In addition to the above references, the [http://stormwater.pca.state.mn.us/index.php/Overview_of_Minimal_Impact_Design_Standards_%28MIDS%29 Minimal Impact Design Standards] (MIDS) design sequence flowchart can be used to make decisions about the potential for infiltrating stormwater at a site. Although the flowchart focuses on [http://stormwater.pca.state.mn.us/index.php/Performance_goals_for_new_development,_re-development_and_linear_projects MIDS performance goals], it can be adapted to help determine if infiltration prohibitions exist at a site. |
+ | |||
+ | {{alert|The MIDS flowchart was developed based on the 2013 Construction Stormwater permit and has not been updated to reflect changes made in the 2018 permit.|alert-warning}} | ||
+ | |||
+ | <!--Potential constraints to infiltration, with links to the [http://stormwater.pca.state.mn.us/index.php/Design_Sequence_Flowchart-Flexible_treatment_options MIDS flowchart] and other guidance in this manual, are shown below. | ||
*[[MIDS design sequence flow chart - Box 7|Are there constraints due to lack of available right-of-way, off-site drainage and/or rate control requirements?]] | *[[MIDS design sequence flow chart - Box 7|Are there constraints due to lack of available right-of-way, off-site drainage and/or rate control requirements?]] | ||
Line 113: | Line 117: | ||
*[[MIDS design sequence flow chart - Box 42|Are there very high infiltrating soils (more than 8 inches per hour)?]] | *[[MIDS design sequence flow chart - Box 42|Are there very high infiltrating soils (more than 8 inches per hour)?]] | ||
*[[MIDS design sequence flow chart - Box 46|Are there adverse surface water hydrologic impacts from infiltration practices (e.g. impacting perched wetland)?]] | *[[MIDS design sequence flow chart - Box 46|Are there adverse surface water hydrologic impacts from infiltration practices (e.g. impacting perched wetland)?]] | ||
− | *Also see guidance on [http://stormwater.pca.state.mn.us/index.php/Stormwater_infiltration_and_setback_%28separation%29_distances setback distances] | + | *Also see guidance on [http://stormwater.pca.state.mn.us/index.php/Stormwater_infiltration_and_setback_%28separation%29_distances setback distances]--> |
==Related pages== | ==Related pages== | ||
Line 129: | Line 133: | ||
*[[Potential stormwater hotspots]] | *[[Potential stormwater hotspots]] | ||
*[[Stormwater and wellhead protection]] | *[[Stormwater and wellhead protection]] | ||
− | *[[Stormwater | + | *[[Stormwater infiltration and contaminated soils and groundwater]] |
*[[Decision tools for stormwater infiltration]] | *[[Decision tools for stormwater infiltration]] | ||
− | |||
*[[References for stormwater infiltration]] | *[[References for stormwater infiltration]] | ||
<noinclude> | <noinclude> | ||
− | [[Category: | + | [[Category:Level 2 - Technical and specific topic information/infiltration]] |
</noinclude> | </noinclude> |
This page provides guidance to help determine if infiltration Best Management Practices (BMPs) can be utilized at a site. Infiltration BMPs include bioinfiltration, infiltration basin, infiltration trench, underground infiltration, permeable pavement, dry swales, step pool swales, and tree trench or tree box with no underdrain. Note that some infiltration occurs in BMPs with underdrains, particularly if the underdrain is raised above the bottom of the BMP. If no infiltration is desired at a site, a liner should be used.
Infiltration is often utilized at a site to meet a regulatory requirement or a performance goal for stormwater volume. The following discussion does not specifically focus on utilizing infiltration to meet a requirement or performance goal, although there is a section that provides information for determining the amount of infiltration feasible at a site.
The following table can be used to determine if infiltration is prohibited or not recommended. Discussion of conditions where infiltration may be acceptable when site constraints exist is provided below.
Summary of situations where infiltration of stormwater runoff is prohibited or not recommended.
Link to this table
Condition | Prohibited | Not recommended | Not recommended unless conditions are met1 |
---|---|---|---|
Local rule or ordinance prohibits infiltration | X | ||
BMP is < 100 feet from drinking well in sensitive aquifer3 | X | ||
BMP is < 50 feet from drinking well in a non-sensitive aquifer3 | X | ||
BMP receives discharges from vehicle fueling and maintenance areas | X | ||
There is less than 3 of separation to bedrock or saturated soil | if CGP applies2 | X | |
BMP receives discharges from certain industrial facilities4 | if CGP applies | ||
BMP is in areas where high levels of contaminants in soil or groundwater will be mobilized by the infiltrating stormwater | if CGP applies | X | |
BMP is located in D soils | if CGP applies | X | |
BMP is 1,000 feet up-gradient or 100 feet down-gradient of active karst | if CGP applies | X | |
BMP is located within an Emergency Response Area in a DWSMA exhibiting high or very high vulnerability | if CGP applies | X | |
BMP is located within an Emergency Response Area (ERA) in a DWSMA exhibiting moderate vulnerability, or outside an ERA in a DWSMA exhibiting high or very high vulnerability | if CGP applies, unless a higher engineering review indicates infiltration is acceptable | X | |
BMP is located in soils with infiltration rate > 8.3 in/hr | if CGP applies | X | |
BMP is located within 1 year travel time of drinking supply well | X | ||
BMP located within 10 feet of building or structure | X | ||
BMP located within 35 feet of a septic system | X | ||
BMP located less than 200 feet from crest of slope that exceeds 20% | X | ||
BMP receives discharges from a confirmed stormwater hotspot | X | ||
A groundwater mound formed beneath the BMP during infiltration extends into the BMP | X |
1see discussion for conditions under which infiltration is acceptable.
2CGP = Construction Stormwater General Permit
3See Minnesota Rules Chapter 4725
4To determine if infiltration is allowed for a specific industrial sector or subsector, go to the list of sectors, select the sector of interest, and review section 8 for that sector (Use of Infiltration Devices and/or Industrial Stormwater Ponds for Stormwater Treatment and Disposal)
If infiltration is not prohibited but any of the following conditions apply, infiltration is not recommended. In some cases, infiltration may be acceptable if the practice is modified, as described below.
Site review is necessary to determine if stormwater runoff can be infiltrated at a site. A site review includes both a review of information and field sampling. The following information may be of use in conducting a site review
The amount of infiltration that can be achieved at a site depends on the soil properties and BMP size. The size of the BMP may be impacted by separation distances that can be achieved. Required or recommended separation distances are shown in the table below. For example, if bedrock is within 5 feet of the land surface, the BMP depth can only be 2 feet to achieve the 3 foot separation from bedrock unless the BMP is raised to achieve greater separation.
Required and recommended minimum vertical and horizontal separation distances. This represents the minimum distance from the infiltration practice to the structure of concern. If the structure is above-ground, the distance is measured from the edge of the BMP to the structure. If the structure is underground, the vertical separation distance represents the distance from the point of infiltration through the bottom of the system to the structure, while the horizontal separation (often called setback) distance is the shortest distance from the edge of the system to the structure.
Link to this table
Structure | Distance (feet) | Requirement or recommendation | Note(s) | |
---|---|---|---|---|
Vertical | Saturated soil | 3 | Requirement1 | |
Bedrock | 3 | Requirement1 | ||
Horizontal | Public supply well | 100 for sensitive wells; 50 for others3 | Requirement | |
Building/structure/property line2 | 10 | Recommended | ||
Surface water | none unless local requirements exist | If nearby stream is impaired for chloride, see [1] | ||
Septic system | 35 | Recommended | ||
Contaminated soil/groundwater | No specific distance. Infiltration must not mobilize contaminants. | |||
Slope | 200 | Recommended | from toe of slope >= 20% | |
Karst | 1000 up-gradient 100 down-gradient | Requirement1 | active karst |
1 Required under the Construction Stormwater General Permit
2 Minimum with slopes directed away from the building
3If treating an average of 10,000 gallons per day; otherwise separation distance is 300 feet
The basic equation used to size a BMP is
Where
BMPs with ponded water include bioinfiltration, infiltration trench, infiltration basin, and swales with check dams. BMPs with water stored in the soil or media include tree trench, tree box, permeable pavement, and swales with no check dams. Specific equations for sizing can be found within articles discussing credits for individual BMPs.
Field verification should be made for separation distances, depth to water, depth to bedrock, and presence of karst. Recommended numbers of borings and pits are presented in this Manual.
Field sampling and evaluation is recommended for determining soil properties (e.g. infiltration rate, presence of gleying and mottling). Recommended numbers of borings and pits are presented in this Manual.
Guidance for determining the potential for infiltrating stormwater has been developed for locations outside Minnesota.
Examples that may be useful are indicated below.
In addition to the above references, the Minimal Impact Design Standards (MIDS) design sequence flowchart can be used to make decisions about the potential for infiltrating stormwater at a site. Although the flowchart focuses on MIDS performance goals, it can be adapted to help determine if infiltration prohibitions exist at a site.