m |
|||
(9 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | [[File:Technical information page image.png|right|100px|alt=image]] | ||
+ | [[File:Pdf image.png|100px|thumb|left|alt=pdf image|<font size=3>[https://stormwater.pca.state.mn.us/index.php?title=File:Shallow_soils_and_shallow_depth_to_bedrock_-_Minnesota_Stormwater_Manual.pdf Download pdf]</font size>]] | ||
[[file:MN depth to bedrock.png|300px|thumb|alt=map of depth to bedrock|<font size=3>Bedrock Outcroppings Areas in Northern Minnesota (Source: MN DNR, with permission. Map is from the [http://www.dnr.state.mn.us/lands_minerals/index.html Minnesota DNR Lands and Minerals Division] and depth to bedrock grid data is from the [http://www.mngs.umn.edu/ Minnesota Geological Survey])</font size>]] | [[file:MN depth to bedrock.png|300px|thumb|alt=map of depth to bedrock|<font size=3>Bedrock Outcroppings Areas in Northern Minnesota (Source: MN DNR, with permission. Map is from the [http://www.dnr.state.mn.us/lands_minerals/index.html Minnesota DNR Lands and Minerals Division] and depth to bedrock grid data is from the [http://www.mngs.umn.edu/ Minnesota Geological Survey])</font size>]] | ||
Line 10: | Line 12: | ||
===Subsurface material investigation=== | ===Subsurface material investigation=== | ||
− | [[File: | + | [[File:3 foot separation b.png|300px|thumb|alt=schematic illustrating separation distance from bottom of infiltration BMP to water table or top of bedrock|<font size=3>Schematic illustrating separation distance from bottom of infiltration BMP to water table or top of bedrock. This diagram includes a modified subsoil zone in which the subsoil has been ripped to alleviate compaction.</font size>]] |
The investigation is designed to determine the nature and thickness of subsurface materials, including depth to bedrock and to the water table. Subsurface data for depth to groundwater may be acquired by soil boring or backhoe investigation. These field data should be supplemented by geophysical investigation techniques deemed appropriate by a qualified professional, which will show the location of the geologic and groundwater formations under the surface. The data listed below should be acquired under the direct supervision of a qualified geologist, geotechnical engineer, or soil scientist who is experienced in conducting such studies. Pertinent site information should include the following: | The investigation is designed to determine the nature and thickness of subsurface materials, including depth to bedrock and to the water table. Subsurface data for depth to groundwater may be acquired by soil boring or backhoe investigation. These field data should be supplemented by geophysical investigation techniques deemed appropriate by a qualified professional, which will show the location of the geologic and groundwater formations under the surface. The data listed below should be acquired under the direct supervision of a qualified geologist, geotechnical engineer, or soil scientist who is experienced in conducting such studies. Pertinent site information should include the following: | ||
Line 19: | Line 21: | ||
===Location of soil borings=== | ===Location of soil borings=== | ||
Borings should be located in order to provide representative area coverage of the proposed BMP facilities. The location of borings should be | Borings should be located in order to provide representative area coverage of the proposed BMP facilities. The location of borings should be | ||
− | *within each distinct major soil type present, as mapped in [ | + | *within each distinct major soil type present, as mapped in [https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm soil surveys]; |
*next to bedrock outcrop areas and/or in areas with known shallow groundwater if present; | *next to bedrock outcrop areas and/or in areas with known shallow groundwater if present; | ||
*near the edges and center of the proposed practice and spaced at equal distances from one another; and | *near the edges and center of the proposed practice and spaced at equal distances from one another; and | ||
Line 41: | Line 43: | ||
*Log any indications of water saturation to include both perched and ground water table levels, and descriptions of soils that are mottled or gleyed (sticky clay soils typically found in waterlogged soils). | *Log any indications of water saturation to include both perched and ground water table levels, and descriptions of soils that are mottled or gleyed (sticky clay soils typically found in waterlogged soils). | ||
*Measure water levels in all borings at the time of completion and again 24 hours after completion. The boring should remain fully open to total depth of these measurements. | *Measure water levels in all borings at the time of completion and again 24 hours after completion. The boring should remain fully open to total depth of these measurements. | ||
− | *Estimate soil engineering characteristics, including “N” or estimated [ | + | *Estimate soil engineering characteristics, including “N” or estimated [https://www.iricen.gov.in/LAB/res/html/Test-37.html#:~:text=Unconfined%20Compressive%20Strength%20(UCS)%20stands,shear%20strength%20of%20clayey%20soil. unconfined compressive strength], when conducting a [https://en.wikipedia.org/wiki/Standard_penetration_test standard penetration test] (SPT). |
===Evaluation of findings=== | ===Evaluation of findings=== | ||
Line 50: | Line 52: | ||
The following references provide useful information for conducting geotechnical investigations. Note that some of these documents were written for investigations at contaminated sites. | The following references provide useful information for conducting geotechnical investigations. Note that some of these documents were written for investigations at contaminated sites. | ||
− | *[ | + | *[https://www.fhwa.dot.gov/engineering/geotech/pubs/reviewguide/checklist.pdf CHECKLIST AND GUIDELINES FOR REVIEW OF GEOTECHNICAL REPORTS AND PRELIMINARY PLANS AND SPECIFICATIONS] |
− | *[https:// | + | *[https://www.publications.usace.army.mil/portals/76/publications/engineermanuals/em_1110-1-1804.pdf Geotechnical Investigations] |
− | *[ | + | *[https://dtsc.ca.gov/wp-content/uploads/sites/31/2018/09/Guidelines_for_Planning_and_Implementing_GW_Characterization_of-Contam_Sites.pdf GUIDELINES FOR PLANNING AND IMPLEMENTING GROUNDWATER CHARACTERIZATION OF CONTAMINATED SITES] |
+ | *[https://seawi.org/images/downloads/2017_Spring_Conference_Presentations/walters_how_to_read_a_geotech_rpt.pdf How to Read and Understand a Geotechnical Report] | ||
==What are general stormwater management guidelines for areas with shallow bedrock?== | ==What are general stormwater management guidelines for areas with shallow bedrock?== | ||
Line 67: | Line 70: | ||
==Related pages== | ==Related pages== | ||
− | *[[Overview of stormwater infiltration | + | *[[Overview of stormwater infiltration]] |
*[[Pre-treatment considerations for stormwater infiltration]] | *[[Pre-treatment considerations for stormwater infiltration]] | ||
− | *[[BMPs for stormwater infiltration | + | *[[BMPs for stormwater infiltration]] |
*[[Pollutant fate and transport in stormwater infiltration systems]] | *[[Pollutant fate and transport in stormwater infiltration systems]] | ||
*[[Surface water and groundwater quality impacts from stormwater infiltration]] | *[[Surface water and groundwater quality impacts from stormwater infiltration]] | ||
− | *[[Stormwater infiltration and groundwater | + | *[[Stormwater infiltration and groundwater mounding]] |
− | *[[Stormwater infiltration and setback (separation) | + | *[[Stormwater infiltration and setback (separation) distances]] |
*[[Karst]] | *[[Karst]] | ||
+ | *[[Shallow soils and shallow depth to bedrock]] | ||
*[[Shallow groundwater]] | *[[Shallow groundwater]] | ||
*[[Soils with low infiltration capacity]] | *[[Soils with low infiltration capacity]] | ||
*[[Potential stormwater hotspots]] | *[[Potential stormwater hotspots]] | ||
− | *[[Stormwater and wellhead | + | *[[Stormwater and wellhead protection]] |
− | *[[Stormwater infiltrations and contaminated | + | *[[Stormwater infiltrations and contaminated soils and groundwater]] |
− | *[[Decision tools for stormwater infiltration | + | *[[Decision tools for stormwater infiltration]] |
− | *[[Stormwater infiltration research | + | *[[Stormwater infiltration research needs]] |
*[[References for stormwater infiltration]] | *[[References for stormwater infiltration]] | ||
<noinclude> | <noinclude> | ||
− | [[Category: | + | [[Category:Level 2 - Technical and specific topic information/infiltration]] |
+ | [[Category:Level 2 - Technical and specific topic information/soils and media]] | ||
</noinclude> | </noinclude> |
Sites with shallow bedrock are defined as having bedrock within 6 feet or less of the ground surface. Shallow bedrock is found in many portions of the state, but is a particular problem in the northeastern region. When installing an infiltration Best Management Practice (BMP), there must be at least 3 feet of separation between the base of the BMP and the bedrock per the Minnesota Construction General Permit (CGP). Bedrock at the 6 foot depth is a trigger to perform a geotechnical investigation to determine the location of the bedrock in the area in and around the proposed BMP to ensure the 3 foot separation can be achieved.
Shallow bedrock limits the depth of BMPs, reduces the potential for subsurface infiltration, and reduces the depth over which treatment can occur. These sites present challenges to stormwater management; however these challenges can be managed. General guidelines for investigation and management are presented below. Special caution for steep slopes and fractured bedrock is urged.
It is important to understand the general depth to bedrock over the entire site, but more specifically it is important to know the depth to bedrock in and around the area of the proposed BMP. Geotechnical investigations are recommended for all proposed stormwater facilities located in regions with shallow bedrock. The purpose of the investigation is to identify subsurface conditions which can pose an environmental concern or a construction hazard to a proposed stormwater management practice. Guidelines for investigating all potential physical constraints to infiltration on a site are presented in a table at this link. These guidelines should not be interpreted as all-inclusive. The size and complexity of the project will drive the extent of any subsurface investigation.
The investigation is designed to determine the nature and thickness of subsurface materials, including depth to bedrock and to the water table. Subsurface data for depth to groundwater may be acquired by soil boring or backhoe investigation. These field data should be supplemented by geophysical investigation techniques deemed appropriate by a qualified professional, which will show the location of the geologic and groundwater formations under the surface. The data listed below should be acquired under the direct supervision of a qualified geologist, geotechnical engineer, or soil scientist who is experienced in conducting such studies. Pertinent site information should include the following:
Borings should be located in order to provide representative area coverage of the proposed BMP facilities. The location of borings should be
The number of recommended borings is described below.
Borings should be extended to a minimum depth of 5 feet below the lowest proposed grade within the practice unless auger/backhoe refusal is encountered.
All material penetrated by the boring should be identified, as follows.
At least one (1) figure showing the subsurface soil profile cross section through the proposed practice should be provided, showing confining layers, depth to bedrock, and water table (if encountered). It should extend through a central portion of the proposed practice, using the actual or projected boring data. A sketch map or formal construction plan indicating the location and dimension of the proposed practice and line of cross section should be included for reference, or as a base map for presentation of subsurface data.
The following references provide useful information for conducting geotechnical investigations. Note that some of these documents were written for investigations at contaminated sites.
The following investigations and guidelines are HIGHLY RECOMMENDED for infiltration and other BMPs proposed to be located in areas with shallow depth to bedrock.
The following table provides an overview of shallow bedrock and soil related design considerations for different structural practice groups. Guidelines for investigating all potential physical constraints to infiltration on a site are presented in the table at the bottom of this page.
Recommendations for structural BMP use in settings with shallow soils and shallow depth to bedrock.
Link to this table
BMP | Shallow soil and shallow depth to bedrock considerations |
---|---|
Bioretention | Should be constructed with an underdrain or liner if minimum separation distance of three (3) feet is not present between practice bottom and bedrock.1 |
Media filter |
|
Vegetative filter |
|
Infiltration trench or basin |
|
Stormwater ponds |
|
Constructed wetlands |
|
1A liner is required under the Construction Stormwater General Permit.
This page was last edited on 15 February 2023, at 13:16.