m |
|||
(28 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | {| class="wikitable" style="float:right; margin-left: 10px; width: | + | {| class="wikitable" style="float:right; margin-left: 10px; width:150px;" |
|- | |- | ||
| colspan="9" style="text-align: center;" |'''Recommended pollutant removal efficiencies, in percent, for constructed ponds. [http://stormwater.pca.state.mn.us/index.php/Information_on_pollutant_removal_by_BMPs#References Sources].'''<br> | | colspan="9" style="text-align: center;" |'''Recommended pollutant removal efficiencies, in percent, for constructed ponds. [http://stormwater.pca.state.mn.us/index.php/Information_on_pollutant_removal_by_BMPs#References Sources].'''<br> | ||
Line 20: | Line 20: | ||
| 0 or 40<sup>1</sup> | | 0 or 40<sup>1</sup> | ||
| 30 | | 30 | ||
+ | | 60 | ||
| 70 | | 70 | ||
− | |||
| 80 | | 80 | ||
|- | |- | ||
Line 28: | Line 28: | ||
| 50 | | 50 | ||
| 84 | | 84 | ||
− | | | + | | 8 or 48<sup>1</sup> |
| 30 | | 30 | ||
+ | | 60 | ||
| 70 | | 70 | ||
− | |||
| 80 | | 80 | ||
|- | |- | ||
Line 38: | Line 38: | ||
| 60 | | 60 | ||
| 90 | | 90 | ||
− | | | + | | 23 or 63<sup>1</sup> |
| 30 | | 30 | ||
+ | | 60 | ||
| 70 | | 70 | ||
− | |||
| 80 | | 80 | ||
|- | |- | ||
Line 48: | Line 48: | ||
|} | |} | ||
+ | [[File:Pdf image.png|100px|thumb|left|alt=pdf image|<font size=3>[https://stormwater.pca.state.mn.us/index.php?title=File:Calculating_credits_for_stormwater_ponds_-_Minnesota_Stormwater_Manual_May_2022.pdf Download pdf]</font size>]] | ||
[[File:Summary image.jpg|100px|left|thumb|alt=image|<font size=3>[https://stormwater.pca.state.mn.us/index.php?title=File:Credit_page_descriptions.mp4 Page video summary]</font size>]] | [[File:Summary image.jpg|100px|left|thumb|alt=image|<font size=3>[https://stormwater.pca.state.mn.us/index.php?title=File:Credit_page_descriptions.mp4 Page video summary]</font size>]] | ||
<noinclude>[[File:Technical information page image.png|100px|left|alt=image]]</noinclude> | <noinclude>[[File:Technical information page image.png|100px|left|alt=image]]</noinclude> | ||
Line 87: | Line 88: | ||
| 0 | | 0 | ||
| 30 | | 30 | ||
+ | | 60 | ||
| 70 | | 70 | ||
− | |||
| 80 | | 80 | ||
|} | |} | ||
Line 129: | Line 130: | ||
[[File:iron enhanced sand filter bench schematic 1.jpg|thumb|300px|alt=schematic of an iron enhanced sand filter bench|<font size=3>Iron-enhanced sand filter bench schematic.</font size>]] | [[File:iron enhanced sand filter bench schematic 1.jpg|thumb|300px|alt=schematic of an iron enhanced sand filter bench|<font size=3>Iron-enhanced sand filter bench schematic.</font size>]] | ||
− | An iron-enhanced sand filtration bench in a wet pond is essentially a [[Types of stormwater ponds#Extended wet detention basin|wet extended detention pond]] with a permanent pool and a flood pool. The outlet structure of the pond is designed such that the water in the flood pool during and after a storm event is held above the elevation of the iron-enhanced sand filter bench, thereby allowing water to filter through the bench. The basic design elements of an iron-enhanced sand filter basin include | + | An iron-enhanced sand filtration bench in a wet pond is essentially a [[Types of stormwater ponds#Extended wet detention basin|wet extended detention pond]] with a permanent pool and a flood pool. The outlet structure of the pond is designed such that the water in the flood pool during and after a storm event is held above the elevation of the iron-enhanced sand filter bench, thereby allowing water to filter through the bench. The basic design elements of an iron-enhanced sand filter basin include the following. |
− | *iron-enhanced sand filter of desired width and length sited along the perimeter of the wet pond (iron-enhanced sands filters should be no less than 5 percent but no greater than 8 percent iron by weight to prevent clogging, see [http://purl.umn.edu/115602 Erickson et al., 2010] | + | *An iron-enhanced sand filter of desired width and length sited along the perimeter of the wet pond (iron-enhanced sands filters should be no less than 5 percent but no greater than 8 percent iron by weight to prevent clogging, see [http://purl.umn.edu/115602 Erickson et al., 2010] and [https://www.researchgate.net/publication/223963903_Capturing_phosphates_with_iron_enhanced_sand_filtration Erickson et al., 2012]. The 5 to 8 percent range is based upon iron filing material that is approximately 90 percent elemental iron with a size distribution approximately equal to that of <span title="ASTM C-33 sand refers to a specific type of sand that meets standards associated with the grading of aggregate materials in the sand. ASTM C33 sand is most often used to make concrete, Portland cement, hot mix asphalt and lime."> '''[https://www.google.com/search?q=astm+c33+pdf&sxsrf=ALiCzsZbiP07RhAm7slFtquulY-VE-7w1A%3A1652959846603&ei=ZiqGYqSyJJu6tQa6xrqYBg&oq=c33+sand&gs_lcp=Cgdnd3Mtd2l6EAEYBjIHCAAQRxCwAzIHCAAQRxCwAzIHCAAQRxCwAzIHCAAQRxCwAzIKCAAQRxCwAxDJAzIHCAAQRxCwAzIHCAAQRxCwAzIHCAAQRxCwAzIHCAAQsAMQQ0oECEEYAEoECEYYAFAAWABguS5oAXABeACAAQCIAQCSAQCYAQDIAQnAAQE&sclient=gws-wiz C-33 sand]'''</span> sand. |
− | *outlet structure that controls the flood pool elevation and can receive the filter bed drain | + | *An outlet structure that controls the flood pool elevation and can receive the filter bed drain. |
− | * | + | *Subsurface drains at the filter bed bottom to drain the bed. The outlet of these subsurface drains should be exposed to the atmosphere and above the downstream high water level to allow the filter to fully drain. |
− | *impervious barrier (typically [http://stormwater.pca.state.mn.us/index.php/Liners_for_stormwater_management geotextile liner], for example HDPE) between the pond and the trench to minimize seepage from the pond into the trench | + | *An impervious barrier (typically [http://stormwater.pca.state.mn.us/index.php/Liners_for_stormwater_management geotextile liner], for example HDPE) between the pond and the trench to minimize seepage from the pond into the trench. |
− | * | + | *Filter draw down within 48 hours of storm completion to avoid filter fouling and to prepare the filter for next storm event. |
− | *the underdrain | + | *An <span title="An underground drain or trench with openings through which the water may percolate from the soil or ground above"> '''underdrain'''</span> that consists of corrugated polyethylene pipe with slits not holes to prevent loss of sand and minimize clogging. If holes are used, the pipe should be covered with pea gravel. |
===Assumptions and approach=== | ===Assumptions and approach=== | ||
− | In developing the credit calculations, it is assumed the constructed basin is properly designed, constructed, and maintained in accordance with the Minnesota Stormwater Manual. If any of these assumptions is not valid, the BMP may not qualify for credits or credits should be reduced based on reduced ability of the BMP to achieve pollutant reductions. For guidance on design, construction, and maintenance, see the appropriate article within the Manual (pond [http://stormwater.pca.state.mn.us/index.php/Design_criteria_for_stormwater_ponds design], [http://stormwater.pca.state.mn.us/index.php/Construction_specifications_for_stormwater_ponds construction], [http://stormwater.pca.state.mn.us/index.php/Operation_and_maintenance_of_stormwater_ponds maintenance]; wetland [http://stormwater.pca.state.mn.us/index.php/Design_criteria_for_stormwater_wetlands design], [http://stormwater.pca.state.mn.us/index.php/Construction_specifications_for_stormwater_wetlands construction], [ | + | In developing the credit calculations, it is assumed the constructed basin is properly designed, constructed, and maintained in accordance with the Minnesota Stormwater Manual. If any of these assumptions is not valid, the BMP may not qualify for credits or credits should be reduced based on reduced ability of the BMP to achieve pollutant reductions. For guidance on design, construction, and maintenance, see the appropriate article within the Manual (pond [http://stormwater.pca.state.mn.us/index.php/Design_criteria_for_stormwater_ponds design], [http://stormwater.pca.state.mn.us/index.php/Construction_specifications_for_stormwater_ponds construction], [http://stormwater.pca.state.mn.us/index.php/Operation_and_maintenance_of_stormwater_ponds maintenance]; wetland [http://stormwater.pca.state.mn.us/index.php/Design_criteria_for_stormwater_wetlands design], [http://stormwater.pca.state.mn.us/index.php/Construction_specifications_for_stormwater_wetlands construction], [https://stormwater.pca.state.mn.us/index.php?title=Operation_and_maintenance_(O%26M)_of_stormwater_treatment_wetland_practices maintenance]). |
Ponds constructed under the [http://stormwater.pca.state.mn.us/index.php/Construction_stormwater_permit Construction Stormwater General Permit] (CGP) must meet the following conditions. | Ponds constructed under the [http://stormwater.pca.state.mn.us/index.php/Construction_stormwater_permit Construction Stormwater General Permit] (CGP) must meet the following conditions. | ||
Line 151: | Line 152: | ||
===Volume credit calculations=== | ===Volume credit calculations=== | ||
− | Constructed basins provide pollutant removal associated with settling of particulates normally present in stormwater runoff, and serve the purpose of reducing peak stormwater flows for channel protection and overbank flood control. Pollutant removal is accomplished by the maintenance of a | + | Constructed basins provide pollutant removal associated with settling of particulates normally present in stormwater runoff, and serve the purpose of reducing peak stormwater flows for channel protection and overbank flood control. Pollutant removal is accomplished by the maintenance of a <span title="a constant or permanent pool of water maintained in a constructed pond or wetland, designed to allow suspended particles to settle by gravitation"> '''permanent pool'''</span> of water that serves to both settle and store the particulates. The necessity of the permanent pool negates the ability to infiltrate runoff; therefore '''''no volume credit is obtained for basins and wetlands'''''. |
===Total suspended solids (TSS) calculations=== | ===Total suspended solids (TSS) calculations=== | ||
Line 162: | Line 163: | ||
where | where | ||
:R<sub>TSS</sub> is the TSS removal fraction for the constructed basin; | :R<sub>TSS</sub> is the TSS removal fraction for the constructed basin; | ||
− | :EMC<sub>TSS</sub> is the event mean concentration of TSS in runoff, in milligrams per liter; | + | :EMC<sub>TSS</sub> is the <span title="The average pollutant concentration for a given stormwater event, expressed in units of mass per volume (e.g., mg/L)"> '''event mean concentration'''</span> of TSS in runoff, in milligrams per liter; |
:V<sub>pp</sub> is the volume treated by the BMP, in cubic feet; and | :V<sub>pp</sub> is the volume treated by the BMP, in cubic feet; and | ||
:0.0000624 is a conversion factor. | :0.0000624 is a conversion factor. | ||
Line 168: | Line 169: | ||
TSS removal for constructed ponds and wetlands varies with [https://stormwater.pca.state.mn.us/index.php?title=Calculating_credits_for_stormwater_ponds#Wet_pond_design_levels the design]. | TSS removal for constructed ponds and wetlands varies with [https://stormwater.pca.state.mn.us/index.php?title=Calculating_credits_for_stormwater_ponds#Wet_pond_design_levels the design]. | ||
+ | '''Constructed ponds''' | ||
*Design Level 1 TSS removal = 60% | *Design Level 1 TSS removal = 60% | ||
*Design Level 2 TSS removal = 84% | *Design Level 2 TSS removal = 84% | ||
*Design Level 3 TSS removal = 90% | *Design Level 3 TSS removal = 90% | ||
− | + | Design Level 2 is the most common design level, with a median removal of 84 percent | |
+ | |||
+ | '''Constructed wetlands''': median removal rate of 73 percent. | ||
+ | |||
+ | For a discussion of the principles of sedimentation, see [https://stormwaterbook.safl.umn.edu/sedimentation-practices Weiss et al.]. | ||
− | The <span title="The volume of water that is treated by a BMP."> [https://stormwater.pca.state.mn.us/index.php?title=Water_quality_criteria '''Water Quality Volume''']</span> (V<sub>WQ</sub>), which is equivalent to V<sub>pp</sub>, is delivered instantaneously to the BMP. The V<sub>WQ</sub> can vary depending on the stormwater management objective(s). For construction stormwater, the water quality volume is 1 inch times the new impervious surface area. For MIDS, the V<sub>WQ</sub> is 1.1 inches times the new impervious surface area. | + | The <span title="The volume of water that is treated by a BMP."> [https://stormwater.pca.state.mn.us/index.php?title=Water_quality_criteria '''Water Quality Volume''']</span> (V<sub>WQ</sub>), which is equivalent to V<sub>pp</sub>, is delivered as an <span title="The maximum volume of water that can be retained by a stormwater practice (bmp) if the water was instantaneously added to the practice. It equals the depth of the practice times the average area of the practice. For some bmps (e.g. bioretention, infiltration trenches and basins, swales with check dams), the volume is the water stored or retained above the media, while for other practices (e.g. permeable pavement, tree trenches) the volume is the water stored or retained within the media."> '''instantaneous volume'''</span> to the BMP. The V<sub>WQ</sub> can vary depending on the stormwater management objective(s). For construction stormwater, the water quality volume is 1 inch times the new impervious surface area. For [https://stormwater.pca.state.mn.us/index.php?title=Minimal_Impact_Design_Standards MIDS], the V<sub>WQ</sub> is 1.1 inches times the new impervious surface area. |
The annual TSS credit, in pounds, is given by | The annual TSS credit, in pounds, is given by | ||
Line 202: | Line 208: | ||
*EMC<sub>TP</sub> is the event mean concentration for total phosphorus in runoff, in milligrams per liter. | *EMC<sub>TP</sub> is the event mean concentration for total phosphorus in runoff, in milligrams per liter. | ||
− | + | The assumption of 55 percent particulate phosphorus and 45 percent dissolved phosphorus is likely inaccurate for certain land uses, such as industrial, transportation, and some commercial areas. Studies indicate particulate phosphorus comprises a greater percent of total phosphorus in these land uses. It may therefore be appropriate to modify the above equation with locally derived ratios for particulate and dissolved phosphorus. For more information on fractionation of phosphorus in stormwater runoff, [https://stormwater.pca.state.mn.us/index.php?title=Event_mean_concentrations_of_total_and_dissolved_phosphorus_in_stormwater_runoff#Ratios_of_particulate_to_dissolved_phosphorus link here]. | |
For wet ponds, removal rates for PP and DP vary with design level. Assuming PP removal is 55% of TP, the removal rates are given below. | For wet ponds, removal rates for PP and DP vary with design level. Assuming PP removal is 55% of TP, the removal rates are given below. | ||
Line 233: | Line 239: | ||
#Quantifying volume and pollution reductions based on accepted hydrologic/hydraulic models | #Quantifying volume and pollution reductions based on accepted hydrologic/hydraulic models | ||
#The Simple Method and MPCA Estimator | #The Simple Method and MPCA Estimator | ||
− | # | + | #MIDS Calculator |
#Quantifying volume and pollution reductions based on values reported in literature | #Quantifying volume and pollution reductions based on values reported in literature | ||
#Quantifying volume and pollution reductions based on field monitoring | #Quantifying volume and pollution reductions based on field monitoring | ||
Line 261: | Line 267: | ||
The Simple Method is a technique used for estimating storm pollutant export delivered from urban development sites. Pollutant loads are estimated as the product of <span title="The average pollutant concentration for a given stormwater event, expressed in units of mass per volume (e.g., mg/L)"> '''event mean concentration'''</span> and runoff depths over specified periods of time (usually annual or seasonal). The method was developed to provide an easy yet reasonably accurate means of predicting the change in pollutant loadings in response to development. [http://www.stormwatercenter.net/Library/Practice/13.pdf Ohrel] (2000) states: "In general, the Simple Method is most appropriate for small watersheds (<640 acres) and when quick and reasonable stormwater pollutant load estimates are required". Rainfall data, land use (runoff coefficients), land area, and pollutant concentration are needed to use the Simple Method. For more information on the Simple Method, see [http://www.stormwatercenter.net/monitoring%20and%20assessment/simple%20meth/simple.htm The Simple method to Calculate Urban Stormwater Loads] or [[The Simple Method for estimating phosphorus export]]. | The Simple Method is a technique used for estimating storm pollutant export delivered from urban development sites. Pollutant loads are estimated as the product of <span title="The average pollutant concentration for a given stormwater event, expressed in units of mass per volume (e.g., mg/L)"> '''event mean concentration'''</span> and runoff depths over specified periods of time (usually annual or seasonal). The method was developed to provide an easy yet reasonably accurate means of predicting the change in pollutant loadings in response to development. [http://www.stormwatercenter.net/Library/Practice/13.pdf Ohrel] (2000) states: "In general, the Simple Method is most appropriate for small watersheds (<640 acres) and when quick and reasonable stormwater pollutant load estimates are required". Rainfall data, land use (runoff coefficients), land area, and pollutant concentration are needed to use the Simple Method. For more information on the Simple Method, see [http://www.stormwatercenter.net/monitoring%20and%20assessment/simple%20meth/simple.htm The Simple method to Calculate Urban Stormwater Loads] or [[The Simple Method for estimating phosphorus export]]. | ||
− | Some simple stormwater calculators utilize the Simple Method ([https://www.epa.gov/nps/spreadsheet-tool-estimating-pollutant-loads-stepl EPA STEPL], [https://www.stormwatercenter.net/monitoring%20and%20assessment/watershed_treatment_model.htm Watershed Treatment Model]). The MPCA developed a simple calculator for estimating load reductions for TSS, total phosphorus, and bacteria. Called the [http://stormwater.pca.state.mn.us/index.php/Guidance_and_examples_for_using_the_MPCA_Estimator '''MPCA Estimator'''], this tool was developed specifically for complying with the [https://stormwater.pca.state.mn.us/index.php?title= | + | Some simple stormwater calculators utilize the Simple Method ([https://www.epa.gov/nps/spreadsheet-tool-estimating-pollutant-loads-stepl EPA STEPL], [https://www.stormwatercenter.net/monitoring%20and%20assessment/watershed_treatment_model.htm Watershed Treatment Model]). The MPCA developed a simple calculator for estimating load reductions for TSS, total phosphorus, and bacteria. Called the [http://stormwater.pca.state.mn.us/index.php/Guidance_and_examples_for_using_the_MPCA_Estimator '''MPCA Estimator'''], this tool was developed specifically for complying with the [https://stormwater.pca.state.mn.us/index.php?title=Forms,_guidance,_and_resources_for_completing_the_TMDL_annual_report_form General Permit TMDL annual reporting requirement]. The MPCA Estimator provides default values for pollutant concentration, <span title="The runoff coefficient (C) is a dimensionless coefficient relating the amount of runoff to the amount of precipitation received. It is a larger value for areas with low infiltration and high runoff (pavement, steep gradient), and lower for permeable, well vegetated areas (forest, flat land)."> [https://stormwater.pca.state.mn.us/index.php?title=Runoff_coefficients_for_5_to_10_year_storms '''runoff coefficients''']</span> for different land uses, and precipitation, although the user can modify these and is encouraged to do so when local data exist. The user is required to enter area for different land uses and area treated by BMPs within each of the land uses. BMPs include infiltrators (e.g. bioinfiltration, infiltration basin, tree trench, permeable pavement, etc.), filters (biofiltration, sand filter, green roof), constructed ponds and wetlands, and swales/filters. The MPCA Estimator includes standard removal efficiencies for these BMPs, but the user can modify those values if better data are available. Output from the calculator is given as a load reduction (percent, mass, or number of bacteria) from the original estimated load. Default TSS removal fractions are 0.84 for wet basins and 0.73 for constructed wetlands. Default removal fractions for TP are 0.50 for wet basins and 0.38 for constructed wetlands. |
{{alert|The MPCA Estimator should not be used for modeling a stormwater system or selecting BMPs.|alert-warning}} | {{alert|The MPCA Estimator should not be used for modeling a stormwater system or selecting BMPs.|alert-warning}} | ||
Line 283: | Line 289: | ||
Designers may use the pollutant reduction values in the [[Information on pollutant removal by BMPs|Minnesota Stormwater Manual]] or may research values from other databases and published literature. Designers who opt for this approach should | Designers may use the pollutant reduction values in the [[Information on pollutant removal by BMPs|Minnesota Stormwater Manual]] or may research values from other databases and published literature. Designers who opt for this approach should | ||
− | *select the median value from pollutant reduction databases that report a range of reductions, such as from the [ | + | *select the median value from pollutant reduction databases that report a range of reductions, such as from the [https://bmpdatabase.org/ International BMP Database]; |
*select a pollutant removal reduction from literature that studied a stormwater pond or wetland device with site characteristics and climate similar to the device being considered for credits; | *select a pollutant removal reduction from literature that studied a stormwater pond or wetland device with site characteristics and climate similar to the device being considered for credits; | ||
− | *when using data from an individual study, review the article to determine that the design principles of the studied stormwater pond or wetland are close to the [ | + | *when using data from an individual study, review the article to determine that the design principles of the studied stormwater pond or wetland are close to the [https://stormwater.pca.state.mn.us/index.php?title=Design_criteria_for_stormwater_ponds design recommendations] for Minnesota and/or by a local permitting agency; and |
*give preference to literature that has been published in a peer-reviewed publication. | *give preference to literature that has been published in a peer-reviewed publication. | ||
The following references summarize pollutant reduction values from multiple studies or sources that could be used to determine credits. Users should note that there is a wide range of monitored pollutant removal effectiveness in the literature. Before selecting a literature value, users should compare the characteristics of the monitored site in the literature against the characteristics of the proposed stormwater pond, considering such conditions as watershed characteristics, pond sizing, and climate factors. | The following references summarize pollutant reduction values from multiple studies or sources that could be used to determine credits. Users should note that there is a wide range of monitored pollutant removal effectiveness in the literature. Before selecting a literature value, users should compare the characteristics of the monitored site in the literature against the characteristics of the proposed stormwater pond, considering such conditions as watershed characteristics, pond sizing, and climate factors. | ||
− | *[ | + | *[https://bmpdatabase.org/ International Stormwater Best Management Practices (BMP) Database Pollutant Category Summary Statistical Addendum: TSS, Bacteria, Nutrients, and Metals] |
**Compilation of BMP performance studies published through 2011 | **Compilation of BMP performance studies published through 2011 | ||
**Provides values for TSS, Bacteria, Nutrients, and Metals | **Provides values for TSS, Bacteria, Nutrients, and Metals | ||
**Applicable to grass strips, bioretention, bioswales, detention basins, green roofs, manufactured devices, media filters, porous pavements, wetland basins, and wetland channels | **Applicable to grass strips, bioretention, bioswales, detention basins, green roofs, manufactured devices, media filters, porous pavements, wetland basins, and wetland channels | ||
− | *[ | + | *[http://lshs.tamu.edu/docs/lshs/end-notes/updated%20bmp%20removal%20efficiencies%20from%20the%20national%20pollutant%20re-2854375963/updated%20bmp%20removal%20efficiencies%20from%20the%20national%20pollutant%20removal%20database.pdf Updated BMP Removal Efficiencies from the National Pollutant Removal Database (2007) & Acceptable BMP Table for Virginia] |
− | ** | + | **Provides data for several structural and non-structural BMP performance evaluations |
− | |||
− | |||
*[http://www.epa.state.il.us/green-infrastructure/docs/draft-final-report.pdf The Illinois Green Infrastructure Study] | *[http://www.epa.state.il.us/green-infrastructure/docs/draft-final-report.pdf The Illinois Green Infrastructure Study] | ||
**Figure ES-1 (page 9) summarizes BMP effectiveness | **Figure ES-1 (page 9) summarizes BMP effectiveness | ||
Line 305: | Line 309: | ||
**Provides values for TSS, TN, and TP removal | **Provides values for TSS, TN, and TP removal | ||
**Applicable to basins and wetlands, stormwater wetlands, infiltration practices, filtering practices, treatment swales, vegetated buffers, and pre-treatment practices | **Applicable to basins and wetlands, stormwater wetlands, infiltration practices, filtering practices, treatment swales, vegetated buffers, and pre-treatment practices | ||
− | *[https://www3.epa.gov/region1/npdes/stormwater/ | + | *[https://www3.epa.gov/region1/npdes/stormwater/tools/BMP-Performance-Analysis-Report.pdf BMP Performance Analysis]. Prepared for US EPA Region 1, Boston MA |
**Appendix B provides pollutant removal performance curves | **Appendix B provides pollutant removal performance curves | ||
**Provides values for TP, TSS, and Zn | **Provides values for TP, TSS, and Zn | ||
Line 372: | Line 376: | ||
*In 2014 the Water Environment Federation released this White Paper that investigates the feasibility of a national program for the testing of stormwater products and practices. The report does not include any specific guidance on the monitoring of a BMP, but it does include a summary of the existing technical evaluation programs that could be consulted for testing results for specific products (see Table 1 on page 8). | *In 2014 the Water Environment Federation released this White Paper that investigates the feasibility of a national program for the testing of stormwater products and practices. The report does not include any specific guidance on the monitoring of a BMP, but it does include a summary of the existing technical evaluation programs that could be consulted for testing results for specific products (see Table 1 on page 8). | ||
− | : | + | :'''Caltrans Stormwater Monitoring Guidance Manual (Document No. CTSW-OT-13-999.43.01)''' |
The most current version of this manual was released by the State of California, Department of Transportation in November 2013. As with the other monitoring manuals described, this manual does include guidance on planning a stormwater monitoring program. However, this manual is among the most thorough for field activities. Relevant chapters include. | The most current version of this manual was released by the State of California, Department of Transportation in November 2013. As with the other monitoring manuals described, this manual does include guidance on planning a stormwater monitoring program. However, this manual is among the most thorough for field activities. Relevant chapters include. | ||
Line 402: | Line 406: | ||
==Other Pollutants== | ==Other Pollutants== | ||
− | In addition to TSS and phosphorus, constructed basins can reduce loading of other pollutants. According to the [ | + | In addition to TSS and phosphorus, constructed basins can reduce loading of other pollutants. According to the [https://bmpdatabase.org/ International Stormwater Database], studies have shown that constructed basins are effective at reducing concentration of pollutants, including nutrients, metals, bacteria, cyanide, oils and grease, Volatile Organic Compounds (VOC), and Biological Oxygen Demand (BOD). A compilation of the pollutant removal capabilities from a review of literature are summarized below. |
{{:Other Pollutants Reduced by Constructed Basins: Stormwater Ponds}} | {{:Other Pollutants Reduced by Constructed Basins: Stormwater Ponds}} | ||
Line 470: | Line 474: | ||
**[[Calculating credits for stormwater and rainwater harvest and use/reuse]] | **[[Calculating credits for stormwater and rainwater harvest and use/reuse]] | ||
− | [[ | + | [[Category:Level 3 - Best management practices/Guidance and information/Pollutant removal and credits]] |
+ | [[Category:Level 2 - Pollutants/Pollutant removal]] | ||
</noinclude> | </noinclude> |
Recommended pollutant removal efficiencies, in percent, for constructed ponds. Sources. TSS=total suspended solids; TP=total phosphorus; PP=particulate phosphorus; DP=dissolved phosphorus; TN=total nitrogen | |||||||||
Design level | TSS | TP | PP | DP | TN | Metals | Bacteria | Hydrocarbons | |
1 | 60 | 34 | 60 | 0 or 401 | 30 | 60 | 70 | 80 | |
2 | 84 | 50 | 84 | 8 or 481 | 30 | 60 | 70 | 80 | |
3 | 90 | 60 | 90 | 23 or 631 | 30 | 60 | 70 | 80 | |
1 If iron or another amendment to retain phosphorus has been incorporated into the design, the dissolved phosphorus removal is 40 percent. With no amendment, removal is 0 percent. Note that only iron enhanced pond benches are discussed in this manual as a mechanism for retaining dissolved phosphorus. | - |
Credit refers to the quantity of stormwater or pollutant reduction achieved either by an individual best management practice (BMP) or cumulatively with multiple BMPs. Stormwater credits are a tool for local stormwater authorities who are interested in
This page provides a discussion of how constructed basins ( wet pond and stormwater wetland) can achieve stormwater credits.
Recommended pollutant removal efficiencies, in percent, for constructed wetlands. Sources. TSS=total suspended solids; TP=total phosphorus; PP=particulate phosphorus; DP=dissolved phosphorus; TN=total nitrogen | |||||||
TSS | TP | PP | DP | TN | Metals | Bacteria | Hydrocarbons |
73 | 38 | 69 | 0 | 30 | 60 | 70 | 80 |
Stormwater ponds (wet pond) and stormwater wetlands are the most common types of constructed basins. Constructed basins have a permanent pool of water and are built for the purpose of capturing and storing stormwater runoff. These basins are constructed, either temporarily or in a permanent installation, to prevent or mitigate downstream water quantity and/or quality impacts. Several types of constructed basins and wetlands (stormwater basins, constructed stormwater ponds, wet detention ponds, forebays, wet sedimentation basins, wet ponds, constructed wetlands, stormwater wetlands, etc) are included in this general category. Generally stormwater ponds do not have a significant area of vegetation. Stormwater wetlands do have significant vegetation that enhances the nutrient removal of the basin. Not included in this BMP category are dry basins without a permanent pool. Also not included are pretreatment practices, such as oil/water separators, swirl concentrators, and other manufactured devices, that have a permanent pool of water in the device.
Constructed basins rely on physical, biological, and chemical processes to remove pollutants from incoming stormwater runoff. The primary treatment mechanism is gravitational settling of particulates and their associated pollutants as stormwater runoff resides in the permanent pool. Stormwater wetlands provide an additional mechanism for the removal of nutrient and other pollutants through the uptake by algae and aquatic vegetation. Volatilization and chemical activity can also occur in both ponds and wetlands, breaking down and assimilating a number of other stormwater contaminants such as hydrocarbons (WEF, ASCE/EWRI, 2012).
The longer stormwater runoff remains in the permanent pool, the more settling (and associated pollutant removal) and other treatment will occur. After the particulates settle to the bottom of a pond, a permanent pool provides protection from re-suspension when additional runoff enters the pond during and after a rain event (WEF, ASCE/EWRI, 2012).
Stormwater treatment trains are comprised of multiple best management practices (BMPs) that work together to minimize the volume of stormwater runoff, remove pollutants, and reduce the rate of stormwater runoff being discharged to Minnesota wetlands, lakes and streams. Constructed basins are typically located at the end of the stormwater treatment train, capturing all the runoff from the site.
This section describes the basic concepts used to calculate credits for volume, total suspended solids (TSS) and total phosphorus (TP). Specific methods for calculating credits are discussed later in this article.
Constructed basins generate credits for TSS and TP. They do not substantially reduce the volume of runoff. Constructed basins are effective at reducing concentrations of other pollutants associated with sediment, including metals and hydrocarbons. This article does not provide information on calculating credits for pollutants other than TSS and TP, but references are provided that may be useful for calculating credits for Other pollutants.
Wet ponds have many potential designs. Credits vary with design. Below are minimum requirements for three design levels used to credit constructed wet ponds.
An iron-enhanced sand filtration bench in a wet pond is essentially a wet extended detention pond with a permanent pool and a flood pool. The outlet structure of the pond is designed such that the water in the flood pool during and after a storm event is held above the elevation of the iron-enhanced sand filter bench, thereby allowing water to filter through the bench. The basic design elements of an iron-enhanced sand filter basin include the following.
In developing the credit calculations, it is assumed the constructed basin is properly designed, constructed, and maintained in accordance with the Minnesota Stormwater Manual. If any of these assumptions is not valid, the BMP may not qualify for credits or credits should be reduced based on reduced ability of the BMP to achieve pollutant reductions. For guidance on design, construction, and maintenance, see the appropriate article within the Manual (pond design, construction, maintenance; wetland design, construction, maintenance).
Ponds constructed under the Construction Stormwater General Permit (CGP) must meet the following conditions.
If any of these assumptions are not valid, the credit will be reduced.
Constructed basins provide pollutant removal associated with settling of particulates normally present in stormwater runoff, and serve the purpose of reducing peak stormwater flows for channel protection and overbank flood control. Pollutant removal is accomplished by the maintenance of a permanent pool of water that serves to both settle and store the particulates. The necessity of the permanent pool negates the ability to infiltrate runoff; therefore no volume credit is obtained for basins and wetlands.
Constructed basins provide pollutant removal associated with settling of particulates normally present in stormwater runoff. No credits associated with volume reduction are available.
The event-based TSS credit for constructed basins, MTSS in pounds, is given by
\( M_{TSS} = 0.0000624\ R_{TSS}\ EMC_{TSS}\ V_{pp} \)
where
TSS removal for constructed ponds and wetlands varies with the design.
Constructed ponds
Design Level 2 is the most common design level, with a median removal of 84 percent
Constructed wetlands: median removal rate of 73 percent.
For a discussion of the principles of sedimentation, see Weiss et al..
The Water Quality Volume (VWQ), which is equivalent to Vpp, is delivered as an instantaneous volume to the BMP. The VWQ can vary depending on the stormwater management objective(s). For construction stormwater, the water quality volume is 1 inch times the new impervious surface area. For MIDS, the VWQ is 1.1 inches times the new impervious surface area.
The annual TSS credit, in pounds, is given by
\( M_{TSS} = 2.72\ R_{TSS}\ EMC_{TSS}\ F\ V_{annual} \)
where
For a constructed pond or wetland, the fraction of annual runoff treated by the BMP is assumed to be 1, meaning all runoff from the contributing drainage area passes through and is treated by the BMP.
Assume a constructed pond is designed to treat 5 acres of impervious surface and 5 acres of forested land on B (SM) soils. The TSS concentration in runoff is 54.5 milligrams per liter. Annual runoff, calculated using the MIDS calculator, is 11.72 acre-feet. The annual TSS reduction is 2.72 * 0.84 * 54.5 * 11.72 = 1459 pounds. If the BMP was a constructed wetland instead of a constructed pond, the removal efficiency would be 0.73 instead of 0.84 and the TSS reduction would be 1268 pounds.
Constructed basins provide pollutant removal associated with settling of particulates normally present in stormwater runoff. No credits associated with volume reduction are available.
In the Minimal Impact Design Standards (MIDS) Calculator, phosphorus in runoff is assumed to be 55 percent particulate phosphorus (PP) and 45 percent dissolved phosphorus (DP). Using these values, the event-based TP removal, MTP in pounds, is given by
\( M_{TP} = 0.0000624\ ((0.55\ R_{PP})\ + (0.45\ R_{DP}))\ EMC_{TP}\ V_{pp} \)
where
The assumption of 55 percent particulate phosphorus and 45 percent dissolved phosphorus is likely inaccurate for certain land uses, such as industrial, transportation, and some commercial areas. Studies indicate particulate phosphorus comprises a greater percent of total phosphorus in these land uses. It may therefore be appropriate to modify the above equation with locally derived ratios for particulate and dissolved phosphorus. For more information on fractionation of phosphorus in stormwater runoff, link here.
For wet ponds, removal rates for PP and DP vary with design level. Assuming PP removal is 55% of TP, the removal rates are given below.
The MIDS Calculator gives no credit for DP unless an amendment to retain phosphorus is incorporated into the pond design. Data from the International BMP Database indicates constructed basins with no P-retaining amendment typically provide no credit for DP. Information on phosphorus removal fractions (percentages) can be found here. PP removal rates for pond Design Level 2, the most common design, are 0.84 for constructed ponds and 0.69 for constructed wetlands.
Assuming PP is 55 percent of TP, the annual TP credit, in pounds, is given by
\( M_{TP} = 2.72\ ((0.55\ R_{PP})\ + (0.45\ R_{DP}))\ EMC_{TSS}\ F\ V_{annual} \)
where
For a constructed pond or wetland, the fraction of annual runoff treated by the BMP is assumed to be 1, meaning all runoff from the contributing area passes through and is treated by the BMP.
Assume a 10 acre site with 5 acres of impervious and 5 acres of forested land. Annual rainfall is 31.9 inches and the soil is B (SM) with an infiltration rate of 0.45 inches per hour. The TP EMC is 0.3 milligrams per liter and the removal efficiency of the BMP for particulate phosphorus is 0.85. No dissolved phosphorus is removed. The MIDS calculator was used to calculate an annual runoff of 11.72 acre-feet delivered to the BMP. The annual TP reduction is therefore
2.72 * ((0.55 * 0.84) + (0.45 * 0)) * 0.3 * 11.72 = 4.42 pounds
If the BMP was a constructed wetland the removal efficiency for particulate phosphorus would be 0.68 instead of 0.85 and the total phosphorus removed would be 3.58 pounds.
This section provides specific information on generating and calculating credits from constructed basins for total suspended solids (TSS) and total phosphorus (TP). Stormwater runoff pollution reductions (“credits”) may be calculated using one of the following methods:
The techniques described in this article assume that volume credit cannot be obtained for stormwater ponds and wetlands. This is based on an overall assumption that ponds and wetlands have insignificant losses related to seepage, evaporation, and transpiration. Stormwater pond and wetland designers that suspect significant volume losses from a specific BMP are encouraged to quantify these volume losses through field measurements.
Ponds and wetlands are also effective at reducing concentrations of other pollutants including nitrogen and metals. This article does not provide information on calculating credits for pollutants other than TSS and phosphorus, but references are provided that may be useful for calculating credits for other pollutants; see Other Pollutants and References for more information.
Users may opt to use a water quality model or calculator to compute volume, TSS and/or TP pollutant removal for the purpose of determining credits for stormwater ponds and wetlands. The available models described in this section are commonly used by water resource professionals, but are not explicitly endorsed or required by the Minnesota Pollution Control Agency.
Use of models or calculators for the purpose of computing pollutant removal credits should be supported by detailed documentation, including:
The following table lists water quantity and water quality models that are commonly used by water resource professionals to predict the hydrologic, hydraulic, and/or pollutant removal capabilities of a single or multiple stormwater BMPs. The table can be used to guide a user in selecting the most appropriate model for computing volume, TSS, and/or TP removal for constructed basin BMPs. In using this table to identify models appropriate for constructed ponds and wetlands, use the sort arrow on the table and sort by Constructed Basin BMPs. Models identified with an X may be appropriate for using with constructed basins.
Comparison of stormwater models and calculators. Additional information and descriptions for some of the models listed in this table can be found at this link. Note that the Construction Stormwater General Permit requires the water quality volume to be calculated as an instantaneous volume, meaning several of these models cannot be used to determine compliance with the permit.
Link to this table
Access this table as a Microsoft Word document: File:Stormwater Model and Calculator Comparisons table.docx.
Model name | BMP Category | Assess TP removal? | Assess TSS removal? | Assess volume reduction? | Comments | |||||
---|---|---|---|---|---|---|---|---|---|---|
Constructed basin BMPs | Filter BMPs | Infiltrator BMPs | Swale or strip BMPs | Reuse | Manu- factured devices |
|||||
Center for Neighborhood Technology Green Values National Stormwater Management Calculator | X | X | X | X | No | No | Yes | Does not compute volume reduction for some BMPs, including cisterns and tree trenches. | ||
CivilStorm | Yes | Yes | Yes | CivilStorm has an engineering library with many different types of BMPs to choose from. This list changes as new information becomes available. | ||||||
EPA National Stormwater Calculator | X | X | X | No | No | Yes | Primary purpose is to assess reductions in stormwater volume. | |||
EPA SWMM | X | X | X | Yes | Yes | Yes | User defines parameter that can be used to simulate generalized constituents. | |||
HydroCAD | X | X | X | No | No | Yes | Will assess hydraulics, volumes, and pollutant loading, but not pollutant reduction. | |||
infoSWMM | X | X | X | Yes | Yes | Yes | User defines parameter that can be used to simulate generalized constituents. | |||
infoWorks ICM | X | X | X | X | Yes | Yes | Yes | |||
i-Tree-Hydro | X | No | No | Yes | Includes simple calculator for rain gardens. | |||||
i-Tree-Streets | No | No | Yes | Computes volume reduction for trees, only. | ||||||
LSPC | X | X | X | Yes | Yes | Yes | Though developed for HSPF, the USEPA BMP Web Toolkit can be used with LSPC to model structural BMPs such as detention basins, or infiltration BMPs that represent source control facilities, which capture runoff from small impervious areas (e.g., parking lots or rooftops). | |||
MapShed | X | X | X | X | Yes | Yes | Yes | Region-specific input data not available for Minnesota but user can create this data for any region. | ||
MCWD/MWMO Stormwater Reuse Calculator | X | Yes | No | Yes | Computes storage volume for stormwater reuse systems | |||||
Metropolitan Council Stormwater Reuse Guide Excel Spreadsheet | X | No | No | Yes | Computes storage volume for stormwater reuse systems. Uses 30-year precipitation data specific to Twin Cites region of Minnesota. | |||||
MIDS Calculator | X | X | X | X | X | X | Yes | Yes | Yes | Includes user-defined feature that can be used for manufactured devices and other BMPs. |
MIKE URBAN (SWMM or MOUSE) | X | X | X | Yes | Yes | Yes | User defines parameter that can be used to simulate generalized constituents. | |||
P8 | X | X | X | X | Yes | Yes | Yes | |||
PCSWMM | X | X | X | Yes | Yes | Yes | User defines parameter that can be used to simulate generalized constituents. | |||
PLOAD | X | X | X | X | X | Yes | Yes | No | User-defined practices with user-specified removal percentages. | |
PondNet | X | Yes | No | Yes | Flow and phosphorus routing in pond networks. | |||||
PondPack | X | [ | No | No | Yes | PondPack can calculate first-flush volume, but does not model pollutants. It can be used to calculate pond infiltration. | ||||
RECARGA | X | No | No | Yes | ||||||
SHSAM | X | No | Yes | No | Several flow-through structures including standard sumps, and proprietary systems such as CDS, Stormceptors, and Vortechs systems | |||||
SUSTAIN | X | X | X | X | X | Yes | Yes | Yes | Categorizes BMPs into Point BMPs, Linear BMPs, and Area BMPs | |
SWAT | X | X | X | Yes | Yes | Yes | Model offers many agricultural BMPs and practices, but limited urban BMPs at this time. | |||
Virginia Runoff Reduction Method | X | X | X | X | X | X | Yes | No | Yes | Users input Event Mean Concentration (EMC) pollutant removal percentages for manufactured devices. |
WARMF | X | X | Yes | Yes | Yes | Includes agriculture BMP assessment tools. Compatible with USEPA Basins | ||||
WinHSPF | X | X | X | Yes | Yes | Yes | USEPA BMP Web Toolkit available to assist with implementing structural BMPs such as detention basins, or infiltration BMPs that represent source control facilities, which capture runoff from small impervious areas (e.g., parking lots or rooftops). | |||
WinSLAMM | X | X | X | X | Yes | Yes | Yes | |||
XPSWMM | X | X | X | Yes | Yes | Yes | User defines parameter that can be used to simulate generalized constituents. |
The Simple Method is a technique used for estimating storm pollutant export delivered from urban development sites. Pollutant loads are estimated as the product of event mean concentration and runoff depths over specified periods of time (usually annual or seasonal). The method was developed to provide an easy yet reasonably accurate means of predicting the change in pollutant loadings in response to development. Ohrel (2000) states: "In general, the Simple Method is most appropriate for small watersheds (<640 acres) and when quick and reasonable stormwater pollutant load estimates are required". Rainfall data, land use (runoff coefficients), land area, and pollutant concentration are needed to use the Simple Method. For more information on the Simple Method, see The Simple method to Calculate Urban Stormwater Loads or The Simple Method for estimating phosphorus export.
Some simple stormwater calculators utilize the Simple Method (EPA STEPL, Watershed Treatment Model). The MPCA developed a simple calculator for estimating load reductions for TSS, total phosphorus, and bacteria. Called the MPCA Estimator, this tool was developed specifically for complying with the General Permit TMDL annual reporting requirement. The MPCA Estimator provides default values for pollutant concentration, runoff coefficients for different land uses, and precipitation, although the user can modify these and is encouraged to do so when local data exist. The user is required to enter area for different land uses and area treated by BMPs within each of the land uses. BMPs include infiltrators (e.g. bioinfiltration, infiltration basin, tree trench, permeable pavement, etc.), filters (biofiltration, sand filter, green roof), constructed ponds and wetlands, and swales/filters. The MPCA Estimator includes standard removal efficiencies for these BMPs, but the user can modify those values if better data are available. Output from the calculator is given as a load reduction (percent, mass, or number of bacteria) from the original estimated load. Default TSS removal fractions are 0.84 for wet basins and 0.73 for constructed wetlands. Default removal fractions for TP are 0.50 for wet basins and 0.38 for constructed wetlands.
Because the MPCA Estimator does not consider BMPs in series, makes simplifying assumptions about runoff and pollutant removal processes, and uses generalized default information, it should only be used for estimating pollutant reductions from an estimated load. It is not intended as a decision-making tool.
The Minimal Impact Design Standards (MIDS) best management practice (BMP) calculator is a tool used to determine stormwater runoff volume and pollutant reduction capabilities of various BMPs, including constructed ponds and constructed wetlands. The MIDS calculator estimates the stormwater runoff volume reductions for various BMPs and annual pollutant load reductions for total phosphorus (including a breakdown between particulate and dissolved phosphorus) and total suspended solids (TSS). The calculator was intended for use on individual development sites, though capable modelers could modify its use for larger applications.
The MIDS calculator is designed in Microsoft Excel with a graphical user interface (GUI), packaged as a windows application, used to organize input parameters. The Excel spreadsheet conducts the calculations and stores parameters, while the GUI provides a platform that allows the user to enter data and presents results in a user-friendly manner.
Detailed guidance has been developed for all BMPs in the calculator, including constructed ponds and constructed wetlands. An overview of individual input parameters and workflows is presented in the MIDS Calculator User Documentation.
A simplified approach to computing a credit would be to apply a reduction value found in literature to the pollutant mass load or concentration (EMC) of the constructed pond or constructed wetland device. A more detailed explanation of the differences between mass load reductions and concentration (EMC) reductions can be found on the pollutant removal page.
Designers may use the pollutant reduction values in the Minnesota Stormwater Manual or may research values from other databases and published literature. Designers who opt for this approach should
The following references summarize pollutant reduction values from multiple studies or sources that could be used to determine credits. Users should note that there is a wide range of monitored pollutant removal effectiveness in the literature. Before selecting a literature value, users should compare the characteristics of the monitored site in the literature against the characteristics of the proposed stormwater pond, considering such conditions as watershed characteristics, pond sizing, and climate factors.
Field monitoring may be made in lieu of desktop calculations or models/calculators as described. Careful planning is HIGHLY RECOMMENDED before commencing a program to monitor the performance of a BMP. The general steps involved in planning and implementing BMP monitoring include the following.
This manual contains the following guidance for monitoring.
The following guidance manuals have been developed to assist BMP owners and operators on how to plan and implement BMP performance monitoring.
Geosyntec Consultants and Wright Water Engineers prepared this guide in 2009 with support from the USEPA, Water Environment Research Foundation, Federal Highway Administration, and the Environment and Water Resource Institute of the American Society of Civil Engineers. This guide was developed to improve and standardize the protocols for all BMP monitoring and to provide additional guidance for Low Impact Development (LID) BMP monitoring. Highlighted chapters in this manual include:
AASHTO (American Association of State Highway and Transportation Officials) and the FHWA (Federal Highway Administration) sponsored this 2006 research report, which was authored by Oregon State University, Geosyntec Consultants, the University of Florida, and the Low Impact Development Center. The primary purpose of this report is to advise on the selection and design of BMPs that are best suited for highway runoff. The document includes chapters on performance monitoring that may be a useful reference for BMP performance monitoring, especially for the performance assessment of a highway BMP.
The most current version of this manual was released by the State of California, Department of Transportation in November 2013. As with the other monitoring manuals described, this manual does include guidance on planning a stormwater monitoring program. However, this manual is among the most thorough for field activities. Relevant chapters include.
This online manual was developed in 2010 by Andrew Erickson, Peter Weiss, and John Gulliver from the University of Minnesota and St. Anthony Falls Hydraulic Laboratory with funding provided by the Minnesota Pollution Control Agency. The manual advises on a four-level process to assess the performance of a Best Management Practice.
Level 1 activities do not produce numerical performance data that could be used to obtain a stormwater management credit. BMP owners and operators who are interested in using data obtained from Levels 2 and 3 should consult with the MPCA or other regulatory agency to determine if the results are appropriate for credit calculations. Level 4, Monitoring, is the method most frequently used for assessment of the performance of a BMP.
Use these links to obtain detailed information on the following topics related to BMP performance monitoring:
In addition to TSS and phosphorus, constructed basins can reduce loading of other pollutants. According to the International Stormwater Database, studies have shown that constructed basins are effective at reducing concentration of pollutants, including nutrients, metals, bacteria, cyanide, oils and grease, Volatile Organic Compounds (VOC), and Biological Oxygen Demand (BOD). A compilation of the pollutant removal capabilities from a review of literature are summarized below.
Other Pollutants Reduced by Constructed Basins: Stormwater Ponds
Link to this table
Pollutant Category | Constituent | Treatment Capabilities (Low = < 30%;
Medium = 30-65%; High = 65 -100%) |
---|---|---|
Metals1, 2 | Cd, Cr, Cu, Zn | Medium/High |
As, Fe, Ni, Pb | ||
Nutrients | Total Nitrogen, | Medium |
TKN | Low | |
Organics | High |
1 Results are for total metals only
2 Information on As was found only in the International Stormwater Database where removal was found to be low
This page was last edited on 1 August 2022, at 18:13.