This special page shows all uploaded files.

File list
First pagePrevious pageNext pageLast page
Date Name Thumbnail Size Description Versions
16:37, 21 September 2016 Maintenance inspection report for dry swale with check dams.docx (file) 14 KB   1
16:23, 21 September 2016 Maintenance inspection report for underground infiltration facilities.docx (file) 12 KB   1
15:52, 21 September 2016 Maintenance inspection report for dry well.docx (file) 14 KB   1
15:43, 21 September 2016 Maintenance inspection report for infiltration trench.docx (file) 14 KB   1
15:36, 21 September 2016 Maintenance inspection report for bioinfiltration basins.docx (file) 14 KB   1
15:13, 21 September 2016 Maintenance inspection report for infiltration basins.docx (file) 14 KB   1
19:08, 22 August 2016 MPCA Stormwater Harvest and Use System Example Inspection Report.docx (file) 25 KB   1
20:58, 18 August 2016 Settling.jpg (file) 28 KB   1
20:54, 18 August 2016 Separators.jpg (file) 24 KB   1
20:51, 18 August 2016 Gutter Guards - Leaf Screens.jpg (file) 57 KB   1
20:48, 18 August 2016 First Flush Device.jpg (file) 44 KB   1
20:43, 18 August 2016 Debris Screens.jpg (file) 7 KB   1
20:39, 18 August 2016 Manufactured screens and filters.jpg (file) 11 KB   1
20:33, 18 August 2016 BMPs with an underdrain.jpg (file) 55 KB   1
20:29, 18 August 2016 Grassed Swales.jpg (file) 33 KB   1
15:00, 18 August 2016 Cistern located at Mississippi Watershed Management Organization 2.jpg (file) 290 KB   1
15:00, 18 August 2016 Cistern located at Mississippi Watershed Management Organization 1.jpg (file) 67 KB   1
19:07, 17 August 2016 Risk characterization stormwater reuse.png (file) 38 KB   1
14:31, 17 August 2016 Post-Storm Inspection Form Stormwater Harvesting and Use.docx (file) 17 KB   1
14:28, 17 August 2016 Treatment System Maintenance Log Stormwater Harvesting and Use Systems.docx (file) 17 KB   1
14:25, 17 August 2016 Spring Inspection & Maintenance Form Stormwater Harvesting and Use Systems.docx (file) 22 KB   1
19:14, 15 August 2016 MPCA survey responses of total stormwater harvest and use system costs.png (file) 19 KB   1
16:07, 15 August 2016 Example Stormwater Harvesting and Use System Schematic.jpg (file) 182 KB   1
22:12, 19 July 2016 Dry swale with check dams complete with trees.png (file) 762 KB   1
22:10, 19 July 2016 Dry swale with check dams complete with.png (file) 762 KB   1
22:06, 19 July 2016 Dry Swale with check dams.png (file) 779 KB   1
21:54, 19 July 2016 Dry swale infiltration area excavated and finished with hand tools.png (file) 839 KB   1
21:50, 19 July 2016 Infiltration media being placed in infiltration area with tracked backhoe.png (file) 832 KB   1
21:41, 19 July 2016 Tracked backhoe and hand laborer in infiltration area during excavation.png (file) 703 KB   1
21:37, 19 July 2016 Partial excavation for future dry swale.png (file) 864 KB   1
21:28, 19 July 2016 Retaining wall constructed infiltration basin is fully excavated and has infiltration media in place.png (file) 882 KB   1
21:24, 19 July 2016 Partial excavation for retaining wall infiltration basin is not excavated.png (file) 890 KB   1
20:57, 19 July 2016 Dry swale with check dam inlet pipe.png (file) 433 KB   1
20:49, 19 July 2016 Pretreatment inlet structure to dry swale with check dam.png (file) 421 KB   1
20:31, 19 July 2016 Infiltration basin before planting.png (file) 2.1 MB   1
20:27, 19 July 2016 Infiltration basin with rough grading complete.png (file) 2.64 MB   1
20:05, 19 July 2016 Modular Block Sediment Trap.png (file) 2.9 MB   1
20:01, 19 July 2016 Plan and section view of the infiltration basin.png (file) 156 KB   1
19:35, 19 July 2016 Finished basin with simple groupings of shrubs grasses and trees.png (file) 4.07 MB   1
19:26, 19 July 2016 Riverside Stormwater Plaza Concept Plan.png (file) 317 KB   1
19:20, 19 July 2016 Infiltration soil being carefully placed to avoid compaction.png (file) 3.64 MB   1
19:15, 19 July 2016 Infiltration soil being carefully placed to avoid compaction.docx (file) 3.56 MB   1
18:56, 19 July 2016 StormTrap underground storage vault for water stormwater reuse as irrigation.png (file) 4.3 MB   1
18:38, 19 July 2016 Contech infiltration system in native sandy soils.png (file) 4.06 MB   1
18:30, 19 July 2016 Plan layout of infiltration and reuse systems.png (file) 141 KB   1
19:51, 29 June 2016 Schematic showing pollutant load reduction for infiltrated and overflow water 2.png (file) 91 KB   1
19:05, 29 June 2016 BMP Properties 1 - Underground infiltration.jpg (file) 47 KB   1
19:02, 29 June 2016 Symbol for underground infiltration in MIDS calculator.png (file) 50 KB   1
18:52, 29 June 2016 Schematic showing pollutant load reduction for infiltrated and overflow water.png (file) 88 KB   1
18:48, 29 June 2016 Screenshot from MIDS calculator showing user inputs needed for stormwater disconnection.png (file) 76 KB   1
First pagePrevious pageNext pageLast page