m |
|||
(15 intermediate revisions by the same user not shown) | |||
Line 23: | Line 23: | ||
|} | |} | ||
− | [[File:Pdf image.png|100px|thumb|left|alt=pdf image|<font size=3>[https://stormwater.pca.state.mn.us/index.php?title=File: | + | [[File:Pdf image.png|100px|thumb|left|alt=pdf image|<font size=3>[https://stormwater.pca.state.mn.us/index.php?title=File:Calculating_credits_for_tree_trenches_and_tree_boxes_-_Minnesota_Stormwater_Manual_May_2022.pdf Download pdf]</font size>]] |
[[File:Summary image.jpg|100px|left|thumb|alt=image|<font size=3>[https://stormwater.pca.state.mn.us/index.php?title=File:Credit_page_descriptions.mp4 Page video summary]</font size>]] | [[File:Summary image.jpg|100px|left|thumb|alt=image|<font size=3>[https://stormwater.pca.state.mn.us/index.php?title=File:Credit_page_descriptions.mp4 Page video summary]</font size>]] | ||
[[File:Technical information page image.png|100px|left|alt=image]] | [[File:Technical information page image.png|100px|left|alt=image]] | ||
Line 277: | Line 277: | ||
:R<sub>TSS</sub> is the TSS pollutant removal percentage for filtered runoff. | :R<sub>TSS</sub> is the TSS pollutant removal percentage for filtered runoff. | ||
− | The [http://stormwater.pca.state.mn.us/index.php/Pollutant_removal_percentages_for_bioretention_BMPs Stormwater Manual] provides a recommended value for R<sub>TSS</sub> of 0.80 (80 percent removal) for filtered water | + | The [http://stormwater.pca.state.mn.us/index.php/Pollutant_removal_percentages_for_bioretention_BMPs Stormwater Manual] provides a recommended value for R<sub>TSS</sub> of 0.80 (80 percent removal) for filtered water. Alternate justified percentages for TSS removal can be used if proven to be applicable to the BMP design. |
The above calculations may be applied on an event or annual basis and are given by | The above calculations may be applied on an event or annual basis and are given by | ||
Line 321: | Line 321: | ||
:the second term on the right side of the equation represents the removal of dissolved phosphorus; and | :the second term on the right side of the equation represents the removal of dissolved phosphorus; and | ||
:D<sub>MU<sub>max=2</sub></sub> = the media depth above the underdrain, up to a maximum of 2 feet. | :D<sub>MU<sub>max=2</sub></sub> = the media depth above the underdrain, up to a maximum of 2 feet. | ||
+ | |||
+ | The assumption of 55 percent particulate phosphorus and 45 percent dissolved phosphorus is likely inaccurate for certain land uses, such as industrial, transportation, and some commercial areas. Studies indicate particulate phosphorus comprises a greater percent of total phosphorus in these land uses. It may therefore be appropriate to modify the above equation with locally derived ratios for particulate and dissolved phosphorus. For more information on fractionation of phosphorus in stormwater runoff, [https://stormwater.pca.state.mn.us/index.php?title=Event_mean_concentrations_of_total_and_dissolved_phosphorus_in_stormwater_runoff#Ratios_of_particulate_to_dissolved_phosphorus link here]. | ||
The following table can be used to calculate phosphorus credits. | The following table can be used to calculate phosphorus credits. | ||
Line 371: | Line 373: | ||
{{alert|The model selected depends on your objectives. For compliance with the Construction Stormwater permit, the model must be based on the assumption that an instantaneous volume is captured by the BMP.|alert-danger}} | {{alert|The model selected depends on your objectives. For compliance with the Construction Stormwater permit, the model must be based on the assumption that an instantaneous volume is captured by the BMP.|alert-danger}} | ||
− | Users may opt to use a water quality model or calculator to compute volume, TSS and/or TP pollutant removal for the purpose of determining credits. The available models described below are commonly used by water resource professionals, but are not explicitly endorsed or required by the Minnesota Pollution Control Agency. Furthermore, many of the models listed below cannot be used to determine compliance with the Construction Stormwater General permit since the permit requires the water quality volume to be calculated as an | + | Users may opt to use a water quality model or calculator to compute volume, TSS and/or TP pollutant removal for the purpose of determining credits. The available models described below are commonly used by water resource professionals, but are not explicitly endorsed or required by the Minnesota Pollution Control Agency. Furthermore, many of the models listed below cannot be used to determine compliance with the Construction Stormwater General permit since the permit requires the water quality volume to be calculated as an <span title="The maximum volume of water that can be retained by a stormwater practice (bmp) if the water was instantaneously added to the practice. It equals the depth of the practice times the average area of the practice. For some bmps (e.g. bioretention, infiltration trenches and basins, swales with check dams), the volume is the water stored or retained above the media, while for other practices (e.g. permeable pavement, tree trenches) the volume is the water stored or retained within the media."> '''instantaneous volume'''</span>. |
Use of models or calculators for the purpose of computing pollutant removal credits should be supported by detailed documentation, including: | Use of models or calculators for the purpose of computing pollutant removal credits should be supported by detailed documentation, including: | ||
Line 388: | Line 390: | ||
The Simple Method is a technique used for estimating storm pollutant export delivered from urban development sites. Pollutant loads are estimated as the product of <span title="The average pollutant concentration for a given stormwater event, expressed in units of mass per volume (e.g., mg/L)"> '''event mean concentration'''</span> and runoff depths over specified periods of time (usually annual or seasonal). The method was developed to provide an easy yet reasonably accurate means of predicting the change in pollutant loadings in response to development. [http://www.stormwatercenter.net/Library/Practice/13.pdf Ohrel] (2000) states: "In general, the Simple Method is most appropriate for small watersheds (<640 acres) and when quick and reasonable stormwater pollutant load estimates are required". Rainfall data, land use (runoff coefficients), land area, and pollutant concentration are needed to use the Simple Method. For more information on the Simple Method, see [http://www.stormwatercenter.net/monitoring%20and%20assessment/simple%20meth/simple.htm The Simple method to Calculate Urban Stormwater Loads] or [[The Simple Method for estimating phosphorus export]]. | The Simple Method is a technique used for estimating storm pollutant export delivered from urban development sites. Pollutant loads are estimated as the product of <span title="The average pollutant concentration for a given stormwater event, expressed in units of mass per volume (e.g., mg/L)"> '''event mean concentration'''</span> and runoff depths over specified periods of time (usually annual or seasonal). The method was developed to provide an easy yet reasonably accurate means of predicting the change in pollutant loadings in response to development. [http://www.stormwatercenter.net/Library/Practice/13.pdf Ohrel] (2000) states: "In general, the Simple Method is most appropriate for small watersheds (<640 acres) and when quick and reasonable stormwater pollutant load estimates are required". Rainfall data, land use (runoff coefficients), land area, and pollutant concentration are needed to use the Simple Method. For more information on the Simple Method, see [http://www.stormwatercenter.net/monitoring%20and%20assessment/simple%20meth/simple.htm The Simple method to Calculate Urban Stormwater Loads] or [[The Simple Method for estimating phosphorus export]]. | ||
− | Some simple stormwater calculators utilize the Simple Method ([https://www.epa.gov/nps/spreadsheet-tool-estimating-pollutant-loads-stepl EPA STEPL], [https://www.stormwatercenter.net/monitoring%20and%20assessment/watershed_treatment_model.htm Watershed Treatment Model]). The MPCA developed a simple calculator for estimating load reductions for TSS, total phosphorus, and bacteria. Called the [http://stormwater.pca.state.mn.us/index.php/Guidance_and_examples_for_using_the_MPCA_Estimator '''MPCA Estimator'''], this tool was developed specifically for complying with the [https://stormwater.pca.state.mn.us/index.php?title= | + | Some simple stormwater calculators utilize the Simple Method ([https://www.epa.gov/nps/spreadsheet-tool-estimating-pollutant-loads-stepl EPA STEPL], [https://www.stormwatercenter.net/monitoring%20and%20assessment/watershed_treatment_model.htm Watershed Treatment Model]). The MPCA developed a simple calculator for estimating load reductions for TSS, total phosphorus, and bacteria. Called the [http://stormwater.pca.state.mn.us/index.php/Guidance_and_examples_for_using_the_MPCA_Estimator '''MPCA Estimator'''], this tool was developed specifically for complying with the [https://stormwater.pca.state.mn.us/index.php?title=Forms,_guidance,_and_resources_for_completing_the_TMDL_annual_report_form MS4 General Permit TMDL annual reporting requirement]. The MPCA Estimator provides default values for pollutant concentration, <span title="The runoff coefficient (C) is a dimensionless coefficient relating the amount of runoff to the amount of precipitation received. It is a larger value for areas with low infiltration and high runoff (pavement, steep gradient), and lower for permeable, well vegetated areas (forest, flat land)."> [https://stormwater.pca.state.mn.us/index.php?title=Runoff_coefficients_for_5_to_10_year_storms '''runoff coefficients''']</span> for different land uses, and precipitation, although the user can modify these and is encouraged to do so when local data exist. The user is required to enter area for different land uses and area treated by BMPs within each of the land uses. BMPs include infiltrators (e.g. bioinfiltration, infiltration basin, tree trench, permeable pavement, etc.), filters (biofiltration, sand filter, green roof), constructed ponds and wetlands, and swales/filters. The MPCA Estimator includes standard removal efficiencies for these BMPs, but the user can modify those values if better data are available. Output from the calculator is given as a load reduction (percent, mass, or number of bacteria) from the original estimated load. |
{{alert|The MPCA Estimator should not be used for modeling a stormwater system or selecting BMPs.|alert-warning}} | {{alert|The MPCA Estimator should not be used for modeling a stormwater system or selecting BMPs.|alert-warning}} | ||
Line 411: | Line 413: | ||
*select the median value from pollutant reduction databases that report a range of reductions, such as from the International BMP Database; | *select the median value from pollutant reduction databases that report a range of reductions, such as from the International BMP Database; | ||
*select a pollutant removal reduction from literature that studied a BMP with site characteristics and climate similar to the device being considered for credits; | *select a pollutant removal reduction from literature that studied a BMP with site characteristics and climate similar to the device being considered for credits; | ||
− | *review the article to determine that the design principles of the studied BMP are close to the design recommendations for Minnesota, as described in [ | + | *review the article to determine that the design principles of the studied BMP are close to the design recommendations for Minnesota, as described in [https://stormwater.pca.state.mn.us/index.php?title=Trees this manual] and/or by a local permitting agency; and |
*give preference to literature that has been published in a peer-reviewed publication. | *give preference to literature that has been published in a peer-reviewed publication. | ||
Line 417: | Line 419: | ||
The following references summarize pollutant reduction values from multiple studies or sources that could be used to determine credits for bioretention systems. Users should note that there is a wide range of monitored pollutant removal effectiveness in the literature. Before selecting a literature value, users should compare the characteristics of the monitored site in the literature against the characteristics of the proposed bioretention device, considering such conditions as watershed characteristics, bioretention sizing, soil infiltration rates, and climate factors. | The following references summarize pollutant reduction values from multiple studies or sources that could be used to determine credits for bioretention systems. Users should note that there is a wide range of monitored pollutant removal effectiveness in the literature. Before selecting a literature value, users should compare the characteristics of the monitored site in the literature against the characteristics of the proposed bioretention device, considering such conditions as watershed characteristics, bioretention sizing, soil infiltration rates, and climate factors. | ||
− | *[ | + | *[https://bmpdatabase.org/ International Stormwater Best Management Practices (BMP) Database] Pollutant Category Summary Statistical Addendum: TSS, Bacteria, Nutrients, and Metals |
**Compilation of BMP performance studies published through 2011 | **Compilation of BMP performance studies published through 2011 | ||
**Provides values for TSS, Bacteria, Nutrients, and Metals | **Provides values for TSS, Bacteria, Nutrients, and Metals | ||
**Applicable to grass strips, bioretention, bioswales, detention basins, green roofs, manufactured devices, media filters, porous pavements, wetland basins, and wetland channels | **Applicable to grass strips, bioretention, bioswales, detention basins, green roofs, manufactured devices, media filters, porous pavements, wetland basins, and wetland channels | ||
− | *[ | + | *[http://lshs.tamu.edu/docs/lshs/end-notes/updated%20bmp%20removal%20efficiencies%20from%20the%20national%20pollutant%20re-2854375963/updated%20bmp%20removal%20efficiencies%20from%20the%20national%20pollutant%20removal%20database.pdf Updated BMP Removal Efficiencies from the National Pollutant Removal Database (2007) & Acceptable BMP Table for Virginia] |
− | ** | + | **Provides data for several structural and non-structural BMP performance evaluations |
− | |||
− | |||
*[http://www.epa.state.il.us/green-infrastructure/docs/draft-final-report.pdf The Illinois Green Infrastructure Study] | *[http://www.epa.state.il.us/green-infrastructure/docs/draft-final-report.pdf The Illinois Green Infrastructure Study] | ||
**Figure ES-1 summarizes BMP effectiveness | **Figure ES-1 summarizes BMP effectiveness | ||
**Provides values for TN, TSS, peak flows / runoff volumes | **Provides values for TN, TSS, peak flows / runoff volumes | ||
**Applicable to permeable pavements, constructed wetlands, infiltration, detention, filtration, and green roofs | **Applicable to permeable pavements, constructed wetlands, infiltration, detention, filtration, and green roofs | ||
− | *[ | + | *[https://www.des.nh.gov/sites/g/files/ehbemt341/files/documents/2020-01/wd-08-20b.pdf New Hampshire Stormwater Manual] |
**Volume 2, Appendix B summarizes BMP effectiveness | **Volume 2, Appendix B summarizes BMP effectiveness | ||
**Provides values for TSS, TN, and TP removal | **Provides values for TSS, TN, and TP removal | ||
**Applicable to basins and wetlands, stormwater wetlands, infiltration practices, filtering practices, treatment swales, vegetated buffers, and pre-treatment practices | **Applicable to basins and wetlands, stormwater wetlands, infiltration practices, filtering practices, treatment swales, vegetated buffers, and pre-treatment practices | ||
− | *[ | + | *[https://www.wri.wisc.edu/wp-content/uploads/FinalWR03R001.pdf Design Guidelines for Stormwater Bioretention Facilities]. University of Wisconsin, Madison |
**Table 2-1 summarizes typical removal rates | **Table 2-1 summarizes typical removal rates | ||
**Provides values for TSS, metals, TP, TKN, ammonium, organics, and bacteria | **Provides values for TSS, metals, TP, TKN, ammonium, organics, and bacteria | ||
**Applicable for bioretention | **Applicable for bioretention | ||
− | *[ | + | *[https://www3.epa.gov/region1/npdes/stormwater/tools/BMP-Performance-Analysis-Report.pdf BMP Performance Analysis]. Prepared for US EPA Region 1, Boston MA. |
**Appendix B provides pollutant removal performance curves | **Appendix B provides pollutant removal performance curves | ||
**Provides values for TP, TSS, and zinc | **Provides values for TP, TSS, and zinc | ||
Line 498: | Line 498: | ||
*In 2014 the Water Environment Federation released this White Paper that investigates the feasibility of a national program for the testing of stormwater products and practices. The report does not include any specific guidance on the monitoring of a BMP, but it does include a summary of the existing technical evaluation programs that could be consulted for testing results for specific products (see Table 1 on page 8). | *In 2014 the Water Environment Federation released this White Paper that investigates the feasibility of a national program for the testing of stormwater products and practices. The report does not include any specific guidance on the monitoring of a BMP, but it does include a summary of the existing technical evaluation programs that could be consulted for testing results for specific products (see Table 1 on page 8). | ||
− | : | + | :'''Caltrans Stormwater Monitoring Guidance Manual (Document No. CTSW-OT-13-999.43.01)'''] |
The most current version of this manual was released by the State of California, Department of Transportation in November 2013. As with the other monitoring manuals described, this manual does include guidance on planning a stormwater monitoring program. However, this manual is among the most thorough for field activities. Relevant chapters include. | The most current version of this manual was released by the State of California, Department of Transportation in November 2013. As with the other monitoring manuals described, this manual does include guidance on planning a stormwater monitoring program. However, this manual is among the most thorough for field activities. Relevant chapters include. | ||
Line 514: | Line 514: | ||
This online manual was developed in 2010 by Andrew Erickson, Peter Weiss, and John Gulliver from the University of Minnesota and St. Anthony Falls Hydraulic Laboratory with funding provided by the Minnesota Pollution Control Agency. The manual advises on a four-level process to assess the performance of a Best Management Practice. | This online manual was developed in 2010 by Andrew Erickson, Peter Weiss, and John Gulliver from the University of Minnesota and St. Anthony Falls Hydraulic Laboratory with funding provided by the Minnesota Pollution Control Agency. The manual advises on a four-level process to assess the performance of a Best Management Practice. | ||
− | *Level 1: [ | + | *Level 1: [https://stormwaterbook.safl.umn.edu/assessment-programs/visual-inspection Visual Inspection] |
− | *Level 2: [ | + | *Level 2: [https://stormwaterbook.safl.umn.edu/assessment-programs/capacity-testing Capacity Testing] |
*Level 3: [http://stormwaterbook.safl.umn.edu/assessment-programs/synthetic-runoff-testing Synthetic Runoff Testing] | *Level 3: [http://stormwaterbook.safl.umn.edu/assessment-programs/synthetic-runoff-testing Synthetic Runoff Testing] | ||
− | *Level 4: [ | + | *Level 4: [https://stormwaterbook.safl.umn.edu/assessment-programs/monitoring Monitoring] |
Level 1 activities do not produce numerical performance data that could be used to obtain a stormwater management credit. BMP owners and operators who are interested in using data obtained from Levels 2 and 3 should consult with the MPCA or other regulatory agency to determine if the results are appropriate for credit calculations. Level 4, Monitoring, is the method most frequently used for assessment of the performance of a BMP. | Level 1 activities do not produce numerical performance data that could be used to obtain a stormwater management credit. BMP owners and operators who are interested in using data obtained from Levels 2 and 3 should consult with the MPCA or other regulatory agency to determine if the results are appropriate for credit calculations. Level 4, Monitoring, is the method most frequently used for assessment of the performance of a BMP. | ||
Use these links to obtain detailed information on the following topics related to BMP performance monitoring: | Use these links to obtain detailed information on the following topics related to BMP performance monitoring: | ||
− | *[ | + | *[https://stormwaterbook.safl.umn.edu/water-budget-measurement Water Budget Measurement] |
− | *[ | + | *[https://stormwaterbook.safl.umn.edu/sampling-methods Sampling Methods] |
− | *[ | + | *[https://stormwaterbook.safl.umn.edu/analysis-water-and-soils Analysis of Water and Soils] |
− | *[ | + | *[https://stormwaterbook.safl.umn.edu/data-analysis Data Analysis for Monitoring] |
==Other pollutants== | ==Other pollutants== | ||
− | In addition to TSS and phosphorus, bioretention BMPs can reduce loading of other pollutants. According to the [ | + | In addition to TSS and phosphorus, bioretention BMPs can reduce loading of other pollutants. According to the [https://bmpdatabase.org/ International Stormwater Database], studies have shown that bioretention BMPs are effective at reducing concentrations of pollutants, including metals, and bacteria. A compilation of the pollutant removal capabilities from a review of literature are summarized below. |
{{:Relative pollutant reduction for biofiltration}} | {{:Relative pollutant reduction for biofiltration}} | ||
Line 613: | Line 613: | ||
*[[Requirements, recommendations and information for using trees with an underdrain as a BMP in the MIDS calculator]] | *[[Requirements, recommendations and information for using trees with an underdrain as a BMP in the MIDS calculator]] | ||
− | [[Category: | + | [[Category:Level 3 - Best management practices/Structural practices/Tree trench and box]] |
− | [[Category: | + | [[Category:Level 3 - Best management practices/Guidance and information/Pollutant removal and credits]] |
</noinclude> | </noinclude> |
Recommended pollutant removal efficiencies, in percent, for tree trench/tree box BMPs. Sources. NOTE: removal efficiencies are 100 percent for water that is infiltrated. TSS=total suspended solids; TP=total phosphorus; PP=particulate phosphorus; DP=dissolved phosphorus; TN=total nitrogen | |||||||
TSS | TP | PP | DP | TN | Metals | Bacteria | Hydrocarbons |
80 | link to table | link to table | link to table | 50 | 35 | 95 | 80 |
Credit refers to the quantity of stormwater or pollutant reduction achieved either by an individual best management practice (BMP) or cumulatively with multiple BMPs. Stormwater credits are a tool for local stormwater authorities who are interested in
This page provides a discussion of how tree trench/tree box practices can achieve stormwater credits. Tree systems with and without underdrains are both discussed, with separate sections for each type of system as appropriate.
Tree trenches and tree boxes are specialized bioretention practices practices. They are therefore terrestrial-based (up-land as opposed to wetland) water quality and water quantity control process. Tree systems consist of an engineered soil media designed to treat stormwater runoff via filtration through plant and soil media, evapotranspiration from trees, or through infiltration into underlying soil. * Pretreatment is REQUIRED for all bioretention facilities, including tree-based systems, to settle particulates before entering the BMP. Tree practices may be built with or without an underdrain. Other common components may include a stone aggregate layer to allow for increased retention storage and an impermeable liner on the bottom or sides of the facility if located near buildings, subgrade utilities, or in Karst formations.
Like other bioretention practices, tree trenches and tree boxes have high nutrient and pollutant removal efficiencies (Mid-America Regional Council and American Public Works Association Manual of Best Management Practice BMPs for Stormwater Quality, 2012). Tree practices provide pollutant removal and volume reduction through filtration, evaporation, infiltration, transpiration, biological and microbiological uptake, and soil adsorption; the extent of these benefits is highly dependent on site specific conditions and design. In addition to phosphorus and total suspended solids (TSS), which are discussed in greater detail below, tree practices treat a wide variety of other pollutants.
Removal of phosphorus is dependent on the engineered media. Media mixes with high organic matter content typically leach phosphorus and can therefore contribute to water quality degradation. The Manual provides a detailed discussion of media mixes, including information on phosphorus retention.
Stormwater treatment trains are multiple best management practices (BMPs) that work together to minimize the volume of stormwater runoff, remove pollutants, and reduce the rate of stormwater runoff being discharged to Minnesota wetlands, lakes and streams. Tree trenches and tree boxes can be incorporated anywhere in the stormwater treatment train but are most often located in upland areas of the treatment train. The strategic distribution of tree BMPs help control runoff close to the source where it is generated.
This section describes the basic concepts and equations used to calculate credits for volume, Total Suspended Solids (TSS) and Total Phosphorus (TP). Specific methods for calculating credits are discussed later in this article.
Tree practices generate credits for volume, TSS, and TP. Practices with underdrains do not substantially reduce the volume of runoff but may qualify for a partial volume credit as a result of evapotranspiration, infiltration occurring through the sidewalls above the underdrain, and infiltration below the underdrain piping. Tree practices are effective at reducing concentrations of other pollutants including nitrogen, metals, bacteria, and hydrocarbons. This article does not provide information on calculating credits for pollutants other than TSS and TP, but references are provided that may be useful for calculating credits for other pollutants.
In developing the credit calculations, it is assumed the tree practice is properly designed, constructed, and maintained in accordance with the Minnesota Stormwater Manual. If any of these assumptions is not valid, the BMP may not qualify for credits or credits should be reduced based on reduced ability of the BMP to achieve volume or pollutant reductions. For guidance on design, construction, and maintenance, see the appropriate article within the tree section of the Manual.
In the following discussion, the Water Quality Volume (VWQ) is delivered as an instantaneous volume to the BMP. The VWQ is stored within the filter media. The VWQ can vary depending on the stormwater management objective(s). For construction stormwater, VWQ is 1 inch times the new impervious surface area. For MIDS, VWQ is 1.1 inches times the impervious surface area.
Volume credits are calculated based on the capacity of the BMP and its ability to permanently remove stormwater runoff via infiltration into the underlying soil, evapotranspiration (ET) from trees, and interception of rainfall by the tree canopy. The total volume credit, V in cubic feet, is given by
\( V = V_{inf_b}\ + V_{ET}\ + V_I \)
where
Water intercepted by a tree canopy may evaporate or be slowly released such that it does not contribute to stormwater runoff. An interception credit is given by a simplified value of the interception capacity (Ic) for deciduous and coniferous tree species [1].
These values intercept approximately 30% and 57% of annual rainfall over the canopy area.
This credit is per storm event.
The infiltration and evapotranspiration (ET) credits are assumed to be instantaneous values entirely based on the capacity of the BMP to capture, store, and transmit water in any storm event. Because the volume is calculated as an instantaneous volume, the water quality volume (VWQ) is assumed to be instantly stored in the bioretention media. The volume of water between saturation and field capacity is assumed to infiltrate through the bottom of the BMP. The volume credit (Vinfb) for infiltration through the bottom of the BMP into the underlying soil, in cubic feet, is given by
\( V_{inf_b} = (n-FC)\ D_M\ (A_M + A_B)\ / 2 \)
where
Vinfb should be calculated to infiltrate within a specific drawdown time. The construction stormwater permit has a 48 hour drawdown requirement (24 hours is recommended for discharges to trout streams).
ET is calculated as the volume of water between field capacity and the permanent wilting point. Two calculations are needed to determine the evapotranspiration (ET) credit. The smaller of the two calculated values will be used as the ET credit.
The first calculation is the volume of water available for ET. This equals the water stored between field capacity and the wilting point. Note this calculation is made for the entire thickness of the media.
The second calculation is the theoretical ET. The theoretical volume of ET lost (Lindsey and Bassuk, 1991) per day per tree is given by
\(ET = (CP) (LAI) (E_{rate}) (E_{ratio})*3\)
Where (see definitions below):
The canopy projection area (CP) is the perceived tree canopy area at maturity and is given by
\(CP = Π (d/2)^2\)
where d is the diameter of the canopy as measured at the dripline (feet).
CP varies by tree species. Refer to the Tree Species List for these values. Default values can be used in place of calculating CP. Defaults for CP are based on tree size and are
The leaf area index (LAI) is a dimensionless measure that quantifies the amount of leaf material in a canopy. LAI should be stratified by type into either
These values are based on collected research for global leaf area from 1932-2000 (Scurlock, Asner and Gower, 2002).
The evaporation rate (Erate) per unit time can be calculated using a pan evaporation rate for the given area, as available at NOAA. This should be estimated as a per day value.
The evaporation ratio (Eratio) is the equivalent that accounts for the efficiency of the leaves to transpire the available soil water or, alternately, the stomatal resistance of the canopy to transpiration and water movement. This is set at 0.20, or 20 percent based on research by Lindsey and Bassuk (1991). This means that a 1 square centimeter leaf transpires only about 1/5 as much as 1 square centimeter of pan surface.
If the soil volume is less than the recommended volume, the theoretical ET must be adjusted. Since the recommended soil volume equals 2 times the canopy project area (CP), the adjustment term is given by
\(Adjustment = (S_v)/(2 CP)\)
Where Sv is the actual soil volume in cubic feet. Multiply the theoretical ET by the adjustment term to arrive at the true value for theoretical ET.
It is recommended that calculations be based over a three day period. To determine the credit, compare the volume of water available for ET to the theoretical ET over a 3 day period. The credit is the smaller of these two values.
Recommended values for porosity, field capacity and wilting point for different soils.1
Link to this table.
Soil | Hydrologic soil group | Porosity 2 (volume/volume) | Field capacity (volume/volume) | Wilting point (volume/volume) | Porosity minus field capacity (volume/volume)3 | Field capacity minus wilting point (volume/volume)4 |
---|---|---|---|---|---|---|
Sand | A (GM, SW, or SP) | 0.43 | 0.17 | 0.025 to 0.09 | 0.26 | 0.11 |
Loamy sand | A (GM, SW, or SP) | 0.44 | 0.09 | 0.04 | 0.35 | 0.05 |
Sandy loam | A (GM, SW, or SP) | 0.45 | 0.14 | 0.05 | 0.31 | 0.09 |
Loam | B (ML or OL) | 0.47 | 0.25 to 0.32 | 0.09 to 0.15 | 0.19 | 0.16 |
Silt loam | B (ML or OL) | 0.50 | 0.28 | 0.11 | 0.22 | 0.17 |
Sandy clay loam | C | 0.4 | 0.07 | |||
Clay loam | D | 0.46 | 0.32 | 0.15 | 0.14 | 0.17 |
Silty clay loam | D | 0.47 to 0.51 | 0.30 to 0.37 | 0.17 to 0.22 | 0.16 | 0.14 |
Sandy clay | D | 0.43 | 0.11 | |||
Silty clay | D | 0.47 | 0.05 | |||
Clay | D | 0.47 | 0.32 | 0.20 | 0.15 | 0.12 |
1Sources of information include Saxton and Rawls (2006), Cornell University, USDA-NIFA, Minnesota Stormwater Manual. (See References for trees)
2Soil saturation is assumed to be equal to the porosity.
3This value may be used to represent the volume of water that will drain from a bioretention media.
4This value may be used to estimate the amount of water available for evapotranspiration
The annual volume captured and infiltrated by the BMP can be determined with appropriate modeling tools, including the MIDS calculator. Example values are shown below for a scenario using the MIDS calculator. For example, a permeable pavement system designed to capture 1 inch of runoff from impervious surfaces will capture 89 percent of annual runoff from a site with B (SM) soils.
Annual volume, expressed as a percent of annual runoff, treated by a BMP as a function of soil and Water Quality Volume. See footnote1 for how these were determined.
Link to this table
Soil | Water quality volume (VWQ) (inches) | ||||
---|---|---|---|---|---|
0.5 | 0.75 | 1.00 | 1.25 | 1.50 | |
A (GW) | 84 | 92 | 96 | 98 | 99 |
A (SP) | 75 | 86 | 92 | 95 | 97 |
B (SM) | 68 | 81 | 89 | 93 | 95 |
B (MH) | 65 | 78 | 86 | 91 | 94 |
C | 63 | 76 | 85 | 90 | 93 |
1Values were determined using the MIDS calculator. BMPs were sized to exactly meet the water quality volume for a 2 acre site with 1 acre of impervious, 1 acre of forested land, and annual rainfall of 31.9 inches.
Volume credits for a tree system with an underdrain include the ET and interception credits discussed above and an infiltration credit. The main design variables impacting the infiltration volume credit include whether the underdrain is elevated above the native soils and if an impermeable liner on the sides or bottom of the basin is used. Other design variables include media top surface area, underdrain location, basin bottom area, total depth of media, soil water holding capacity and media porosity, and infiltration rate of underlying soils. The total volume credit (Vinf), in cubic feet, is given by
\( V_{inf} = V_{inf_b}\ + V_{inf_s}\ + V_U + V_{ET}\ + V_I \)
where:
Volume credits for ET and canopy interception remain the same as shown above
Volume credits for infiltration through the bottom of the basin (Vinfb) are accounted for only if the bottom of the basin is not lined and the BMP permanently removes a portion of the stormwater runoff via infiltration through sidewalls or beneath the underdrain piping. As long as water continues to draw down, some infiltration will occur through the bottom of the BMP. However, it is assumed that when an underdrain is included in the installation, the majority of water will be filtered through the media and exit through the underdrain. Because of this, the drawdown time is likely to be short. Volume credit for infiltration through the bottom of the basin is given by
\( V_{inf_B} = A_B\ DDT\ I_R/12 \)
where
The Construction Stormwater permit requires drawdown within 48 hours and recommends 24 hours when discharges are to a trout stream. With a properly functioning underdrain, the drawdown time is likely to be considerably less than 48 hours.
Volume credit for infiltration through the sides of the basin is accounted for only if the sides of the basin are not lined with an impermeable liner. Volume credit for infiltration through the sides of the basin is given by
\( V_{inf_s} = (A_M - A_U)\ DDT\ I_R/12 \)
where
This equation assumes water will infiltrate through the entire sideslope area during the period when water is being drawn down. This is not the case, however, since the water level will decline in the BMP. The MIDS calculator assumes a linear drop in water level and thus divides the right hand term in the above equation by 2.
Volume credit for media storage capacity below the underdrain (VU) is accounted for only if the underdrain is elevated above the native soils. Volume credit for media storage capacity below the underdrain is given by
\( V_U = (n-FC)\ D_U\ (A_U + A_B)/2 \)
where
This equation assumes water between the soil porosity and field capacity will infiltrate into the underlying soil. Water stored below the underdrain should infiltrate within a specified drawdown time. The construction stormwater permit has a 48 hour requirement for drawdown (24 hours is recommended when discharges are to trout streams).
The ET and infiltration credits are assumed to be instantaneous values based on the design capacity of the BMP for a specific storm event. Instantaneous volume reduction, also termed event based volume reduction, can be converted to annual volume reduction percentages using the MIDS calculator or other appropriate modeling tools. Assuming an instantaneous volume will somewhat overestimate actual storage when the majority of water is being captured by the underdrains.
The volume of water passing through underdrains can be determined by subtracting the volume loss (V) from the volume of water instantaneously captured by the BMP. No volume reduction credit is given for filtered stormwater that exits through the underdrain, but the volume of filtered water can be used in the calculation of pollutant removal credits through filtration.
A parking lot is developed and will contain tree trenches containing red maple (Acer rubrum). The tree trench has 1000 cubic feet of sandy loam per tree. Note that the following calculations are on a per tree basis. Total volume credit for the BMP will equal the per tree value times the number of trees, assuming all trees are of the same relative size (large in this case). Soil information is from the Soil water storage properties table.
The infiltration credit is given by
\((soil volume) (porosity - field capacity) = 1000 * 0.31 = 310 cubic feet\)
Using the tree morphology table, red maple is a large tree with a mature canopy of 30 feet. The available storage volume is given by
\(Soil volume (field capacity - wilting point) = 1000 * 0.09 = 90 cubic feet\)
The theoretical ET volume is given by
\((CP) (LAI) (E_{rate}) (E_{ratio}) (adjustment) (3 days) = 707 * 4.7 * 0.02 * 0.2 * (1000/(2 * 707)) * 3 = 28.2 cubic feet\)
The smaller value is the theoretical ET (28.2 cubic feet), so that is the volume credit. Note that if the recommended soil volume of 1414 cubic feet had been used the credit would be 39.9 cubic feet.
To make this calculation we used the default value of 707 for CP and the soil volume information from the table above. The evaporation rate (Erate) of 0.24 inches per day (0.02 feet per day) was from data collected at the Southwest Research and Outreach Center in Lamberton, Minnesota.
The interception credit is given by
\(707 (0.14/12) = 8.14 cubic feet\)
The division by 12 converts the calculation to feet.
The total credit is the sum of the infiltration, ET and interception credits and equals (310 + 28.2 + 8.1) or 346.3 cubic feet.
TSS reduction credits correspond with volume reduction through infiltration/ET and filtration of water captured by the tree BMP and are given by
\( M_{TSS} = M_{TSS_{i+ET}} + M_{TSS_f} \)
where
Pollutant removal for infiltrated and evapotranspired water is assumed to be 100 percent. The event-based mass of pollutant removed through infiltration and ET, in pounds, is given by
where
The EMCTSS entering the BMP is a function of the contributing land use and treatment by upstream tributary BMPs. For more information on EMC values for TSS, link here. If there is no underdrain, the water quality volume (VWQ)) is used in this calculation.
Removal for the filtered portion is less than 100 percent. The event-based mass of pollutant removed through filtration, in pounds, is given by
\( M_{TSS_f} = 0.0000624\ (V_{total} - (V_{inf_b} + V_{inf_s} + V_U))\ EMC_{TSS}\ R_{TSS} \)
where
The Stormwater Manual provides a recommended value for RTSS of 0.80 (80 percent removal) for filtered water. Alternate justified percentages for TSS removal can be used if proven to be applicable to the BMP design.
The above calculations may be applied on an event or annual basis and are given by
\( M_{TSS_f} = 2.72\ F\ V_{annual}\ EMC_{TSS}\ R_{TSS} \)
where
Total phosphorus (TP) reduction credits correspond with volume reduction through infiltration/ET and filtration of water captured by the tree BMP and are given by
\( M_{TP} = M_{TP_{i+ET}} + M_{TP_f} \)
where
Pollutant removal for infiltrated water is assumed to be 100 percent. The mass of pollutant removed through infiltration and ET, in pounds, is given by
where
The EMCTP entering the BMP is a function of the contributing land use and treatment by upstream tributary BMPs.
The filtration credit for TP in an underdrained system assumes removal rates based on the soil media mix used and the presence or absence of amendments. Soil mixes with more than 30 mg/kg phosphorus (P) content are likely to leach phosphorus and do not qualify for a water quality credit. If the soil phosphorus concentration is less than 30 mg/kg, the mass of phosphorus removed through filtration, in pounds, is given by
\( M_{TP_f} = 0.0000624\ (V_{total} - (V_{inf_b} + V_{inf_s} + V_U + V_{ET}))\ EMC_{TP}\ R_{TP} \)
Again, assuming the phosphorus content in the media is less than 30 milligrams per kilogram, the removal efficiency (RTP) provided in the Stormwater Manual is a function of the fraction of phosphorus that is in particulate or dissolved form, the depth of the media, and the presence or absence of soil amendments. For the purpose of calculating credits it can be assumed that TP in storm water runoff consists of 55 percent particulate phosphorus (PP) and 45 percent dissolved phosphorus (DP). The removal efficiency for particulate phosphorus is 80 percent. The removal efficiency for dissolved phosphorus is 20 percent if the media depth is 2 feet or greater. The efficiency decreases by 1 percent for each 0.1 foot decrease in media thickness below 2 feet. If a soil amendment is added to the BMP design, an additional 40 percent credit is applied to dissolved phosphorus. Thus, the overall removal efficiency, (RTP), expressed as a percent removal of total phosphorus, is given by
\( R_{TP} = (0.8 * 0.55) + (0.45 * ((0.2 * (D_{MU_{max=2}})/2) + 0.40_{if amendment is used})) * 100 \)
where
The assumption of 55 percent particulate phosphorus and 45 percent dissolved phosphorus is likely inaccurate for certain land uses, such as industrial, transportation, and some commercial areas. Studies indicate particulate phosphorus comprises a greater percent of total phosphorus in these land uses. It may therefore be appropriate to modify the above equation with locally derived ratios for particulate and dissolved phosphorus. For more information on fractionation of phosphorus in stormwater runoff, link here.
The following table can be used to calculate phosphorus credits.
Phosphorus credits for bioretention systems with an underdrain. This includes tree trenches and dry swales.
Link to this table
Particulate phosphorus (PP) | Dissolved phosphorus (DP) |
---|---|
Is Media Mix C or D being used or, if using a mix other than C or D, is the media phosphorus content 30 mg/kg or less per the Mehlich 3 (or equivalent) test1?
The assumption of 55 percent particulate phosphorus and 45 percent dissolved phosphorus is likely inaccurate for certain land uses, such as industrial, transportation, and some commercial areas. Studies indicate particulate phosphorus comprises a greater percent of total phosphorus in these land uses. It may therefore be appropriate to modify the above equation with locally derived ratios for particulate and dissolved phosphorus. For more information on fractionation of phosphorus in stormwater runoff, link here.
Example PP removal credit
|
1. Is Media Mix C or D being used or, if using a mix other than C or D, is the media phosphorus content 30 mg/kg or less per the Mehlich 3 (or equivalent) test1?
2. Does the system include approved P-sorbing soil amendments2?
The assumption of 55 percent particulate phosphorus and 45 percent dissolved phosphorus is likely inaccurate for certain land uses, such as industrial, transportation, and some commercial areas. Studies indicate particulate phosphorus comprises a greater percent of total phosphorus in these land uses. It may therefore be appropriate to modify the above equation with locally derived ratios for particulate and dissolved phosphorus. For more information on fractionation of phosphorus in stormwater runoff, link here. |
|
1Other widely accepted soil P tests may be used. Note: a basic conversion of test results may be necessary
2Acceptable P sorption amendments include
Example 1 Assume the following:
The credits are as follows
Example 2 Assume the following:
The credits are as follows
Tree trenches and tree boxes are specialized bioretention BMPs. This section provides specific information on generating and calculating credits from bioretention BMPS, including tree-based systems, for volume, Total Suspended Solids (TSS) and Total Phosphorus (TP). Stormwater runoff volume and pollution reductions (“credits”) may be calculated using one of the following methods:
Users may opt to use a water quality model or calculator to compute volume, TSS and/or TP pollutant removal for the purpose of determining credits. The available models described below are commonly used by water resource professionals, but are not explicitly endorsed or required by the Minnesota Pollution Control Agency. Furthermore, many of the models listed below cannot be used to determine compliance with the Construction Stormwater General permit since the permit requires the water quality volume to be calculated as an instantaneous volume.
Use of models or calculators for the purpose of computing pollutant removal credits should be supported by detailed documentation, including:
The following table lists water quantity and water quality models that are commonly used by water resource professionals to predict the hydrologic, hydraulic, and/or pollutant removal capabilities of a single or multiple stormwater BMPs. The table can be used to guide a user in selecting the most appropriate model for computing volume, TSS, and/or TP removal for bioretention BMPs, including tree-based systems. In using this table, use the sort arrow on the table to select Infiltrator BMPs or Filter BMPs, depending on the type of tree BMP and the terminology used in the model.
Comparison of stormwater models and calculators. Additional information and descriptions for some of the models listed in this table can be found at this link. Note that the Construction Stormwater General Permit requires the water quality volume to be calculated as an instantaneous volume, meaning several of these models cannot be used to determine compliance with the permit.
Link to this table
Access this table as a Microsoft Word document: File:Stormwater Model and Calculator Comparisons table.docx.
Model name | BMP Category | Assess TP removal? | Assess TSS removal? | Assess volume reduction? | Comments | |||||
---|---|---|---|---|---|---|---|---|---|---|
Constructed basin BMPs | Filter BMPs | Infiltrator BMPs | Swale or strip BMPs | Reuse | Manu- factured devices |
|||||
Center for Neighborhood Technology Green Values National Stormwater Management Calculator | X | X | X | X | No | No | Yes | Does not compute volume reduction for some BMPs, including cisterns and tree trenches. | ||
CivilStorm | Yes | Yes | Yes | CivilStorm has an engineering library with many different types of BMPs to choose from. This list changes as new information becomes available. | ||||||
EPA National Stormwater Calculator | X | X | X | No | No | Yes | Primary purpose is to assess reductions in stormwater volume. | |||
EPA SWMM | X | X | X | Yes | Yes | Yes | User defines parameter that can be used to simulate generalized constituents. | |||
HydroCAD | X | X | X | No | No | Yes | Will assess hydraulics, volumes, and pollutant loading, but not pollutant reduction. | |||
infoSWMM | X | X | X | Yes | Yes | Yes | User defines parameter that can be used to simulate generalized constituents. | |||
infoWorks ICM | X | X | X | X | Yes | Yes | Yes | |||
i-Tree-Hydro | X | No | No | Yes | Includes simple calculator for rain gardens. | |||||
i-Tree-Streets | No | No | Yes | Computes volume reduction for trees, only. | ||||||
LSPC | X | X | X | Yes | Yes | Yes | Though developed for HSPF, the USEPA BMP Web Toolkit can be used with LSPC to model structural BMPs such as detention basins, or infiltration BMPs that represent source control facilities, which capture runoff from small impervious areas (e.g., parking lots or rooftops). | |||
MapShed | X | X | X | X | Yes | Yes | Yes | Region-specific input data not available for Minnesota but user can create this data for any region. | ||
MCWD/MWMO Stormwater Reuse Calculator | X | Yes | No | Yes | Computes storage volume for stormwater reuse systems | |||||
Metropolitan Council Stormwater Reuse Guide Excel Spreadsheet | X | No | No | Yes | Computes storage volume for stormwater reuse systems. Uses 30-year precipitation data specific to Twin Cites region of Minnesota. | |||||
MIDS Calculator | X | X | X | X | X | X | Yes | Yes | Yes | Includes user-defined feature that can be used for manufactured devices and other BMPs. |
MIKE URBAN (SWMM or MOUSE) | X | X | X | Yes | Yes | Yes | User defines parameter that can be used to simulate generalized constituents. | |||
P8 | X | X | X | X | Yes | Yes | Yes | |||
PCSWMM | X | X | X | Yes | Yes | Yes | User defines parameter that can be used to simulate generalized constituents. | |||
PLOAD | X | X | X | X | X | Yes | Yes | No | User-defined practices with user-specified removal percentages. | |
PondNet | X | Yes | No | Yes | Flow and phosphorus routing in pond networks. | |||||
PondPack | X | [ | No | No | Yes | PondPack can calculate first-flush volume, but does not model pollutants. It can be used to calculate pond infiltration. | ||||
RECARGA | X | No | No | Yes | ||||||
SHSAM | X | No | Yes | No | Several flow-through structures including standard sumps, and proprietary systems such as CDS, Stormceptors, and Vortechs systems | |||||
SUSTAIN | X | X | X | X | X | Yes | Yes | Yes | Categorizes BMPs into Point BMPs, Linear BMPs, and Area BMPs | |
SWAT | X | X | X | Yes | Yes | Yes | Model offers many agricultural BMPs and practices, but limited urban BMPs at this time. | |||
Virginia Runoff Reduction Method | X | X | X | X | X | X | Yes | No | Yes | Users input Event Mean Concentration (EMC) pollutant removal percentages for manufactured devices. |
WARMF | X | X | Yes | Yes | Yes | Includes agriculture BMP assessment tools. Compatible with USEPA Basins | ||||
WinHSPF | X | X | X | Yes | Yes | Yes | USEPA BMP Web Toolkit available to assist with implementing structural BMPs such as detention basins, or infiltration BMPs that represent source control facilities, which capture runoff from small impervious areas (e.g., parking lots or rooftops). | |||
WinSLAMM | X | X | X | X | Yes | Yes | Yes | |||
XPSWMM | X | X | X | Yes | Yes | Yes | User defines parameter that can be used to simulate generalized constituents. |
The Simple Method is a technique used for estimating storm pollutant export delivered from urban development sites. Pollutant loads are estimated as the product of event mean concentration and runoff depths over specified periods of time (usually annual or seasonal). The method was developed to provide an easy yet reasonably accurate means of predicting the change in pollutant loadings in response to development. Ohrel (2000) states: "In general, the Simple Method is most appropriate for small watersheds (<640 acres) and when quick and reasonable stormwater pollutant load estimates are required". Rainfall data, land use (runoff coefficients), land area, and pollutant concentration are needed to use the Simple Method. For more information on the Simple Method, see The Simple method to Calculate Urban Stormwater Loads or The Simple Method for estimating phosphorus export.
Some simple stormwater calculators utilize the Simple Method (EPA STEPL, Watershed Treatment Model). The MPCA developed a simple calculator for estimating load reductions for TSS, total phosphorus, and bacteria. Called the MPCA Estimator, this tool was developed specifically for complying with the MS4 General Permit TMDL annual reporting requirement. The MPCA Estimator provides default values for pollutant concentration, runoff coefficients for different land uses, and precipitation, although the user can modify these and is encouraged to do so when local data exist. The user is required to enter area for different land uses and area treated by BMPs within each of the land uses. BMPs include infiltrators (e.g. bioinfiltration, infiltration basin, tree trench, permeable pavement, etc.), filters (biofiltration, sand filter, green roof), constructed ponds and wetlands, and swales/filters. The MPCA Estimator includes standard removal efficiencies for these BMPs, but the user can modify those values if better data are available. Output from the calculator is given as a load reduction (percent, mass, or number of bacteria) from the original estimated load.
Because the MPCA Estimator does not consider BMPs in series, makes simplifying assumptions about runoff and pollutant removal processes, and uses generalized default information, it should only be used for estimating pollutant reductions from an estimated load. It is not intended as a decision-making tool.
The Minimal Impact Design Standards (MIDS) best management practice (BMP) calculator is a tool used to determine stormwater runoff volume and pollutant reduction capabilities of various low impact development (LID) BMPs. The MIDS calculator estimates the stormwater runoff volume reductions for various BMPs and annual pollutant load reductions for total phosphorus (including a breakdown between particulate and dissolved phosphorus) and total suspended solids (TSS). The calculator was intended for use on individual development sites, though capable modelers could modify its use for larger applications.
The MIDS calculator is designed in Microsoft Excel with a graphical user interface (GUI), packaged as a windows application, used to organize input parameters. The Excel spreadsheet conducts the calculations and stores parameters, while the GUI provides a platform that allows the user to enter data and presents results in a user-friendly manner.
Detailed guidance has been developed for all BMPs in the calculator, including tree systems with an underdrain and without an underdrain. An overview of individual input parameters and workflows is presented in the MIDS Calculator User Documentation.
A simplified approach to computing a credit would be to apply a reduction value found in literature to the pollutant mass load or concentration (EMC) entering the BMP. Concentration reductions resulting from treatment can be converted to mass reductions if the volume of stormwater treated is known.
Designers may use the pollutant reduction values reported in this manual or may research values from other databases and published literature. Designers who opt for this approach should
The following references summarize pollutant reduction values from multiple studies or sources that could be used to determine credits for bioretention systems. Users should note that there is a wide range of monitored pollutant removal effectiveness in the literature. Before selecting a literature value, users should compare the characteristics of the monitored site in the literature against the characteristics of the proposed bioretention device, considering such conditions as watershed characteristics, bioretention sizing, soil infiltration rates, and climate factors.
Field monitoring may be made in lieu of desktop calculations or models/calculators as described. Careful planning is HIGHLY RECOMMENDED before commencing a program to monitor the performance of a BMP. The general steps involved in planning and implementing BMP monitoring include the following.
This manual contains the following guidance for monitoring.
The following guidance manuals have been developed to assist BMP owners and operators on how to plan and implement BMP performance monitoring.
Geosyntec Consultants and Wright Water Engineers prepared this guide in 2009 with support from the USEPA, Water Environment Research Foundation, Federal Highway Administration, and the Environment and Water Resource Institute of the American Society of Civil Engineers. This guide was developed to improve and standardize the protocols for all BMP monitoring and to provide additional guidance for Low Impact Development (LID) BMP monitoring. Highlighted chapters in this manual include:
AASHTO (American Association of State Highway and Transportation Officials) and the FHWA (Federal Highway Administration) sponsored this 2006 research report, which was authored by Oregon State University, Geosyntec Consultants, the University of Florida, and the Low Impact Development Center. The primary purpose of this report is to advise on the selection and design of BMPs that are best suited for highway runoff. The document includes chapters on performance monitoring that may be a useful reference for BMP performance monitoring, especially for the performance assessment of a highway BMP.
The most current version of this manual was released by the State of California, Department of Transportation in November 2013. As with the other monitoring manuals described, this manual does include guidance on planning a stormwater monitoring program. However, this manual is among the most thorough for field activities. Relevant chapters include.
This online manual was developed in 2010 by Andrew Erickson, Peter Weiss, and John Gulliver from the University of Minnesota and St. Anthony Falls Hydraulic Laboratory with funding provided by the Minnesota Pollution Control Agency. The manual advises on a four-level process to assess the performance of a Best Management Practice.
Level 1 activities do not produce numerical performance data that could be used to obtain a stormwater management credit. BMP owners and operators who are interested in using data obtained from Levels 2 and 3 should consult with the MPCA or other regulatory agency to determine if the results are appropriate for credit calculations. Level 4, Monitoring, is the method most frequently used for assessment of the performance of a BMP.
Use these links to obtain detailed information on the following topics related to BMP performance monitoring:
In addition to TSS and phosphorus, bioretention BMPs can reduce loading of other pollutants. According to the International Stormwater Database, studies have shown that bioretention BMPs are effective at reducing concentrations of pollutants, including metals, and bacteria. A compilation of the pollutant removal capabilities from a review of literature are summarized below.
Relative pollutant reduction from bioretention systems for metals, nitrogen, bacteria, and organics.
Link to this table
Pollutant | Constituent | Treatment capabilities1 |
---|---|---|
Metals2 | Cadmium, Chromium, Copper, Zinc, Lead | High |
Nitrogen2 | Total nitrogen, Total Kjeldahl nitrogen | Low/medium |
Bacteria2 | Fecal coliform, e. coli | High |
Organics | Petroleum hydrocarbons3, Oil/grease4 | High |
1 Low: < 30%; Medium: 30 to 65%; High: >65%
2 International Stormwater Database, (2012)
3 LeFevre et al., (2012)
4 Hsieh and Davis (2005).
See Reference list
To see how some other cities are calculating tree credits, see Cities That are Pioneers in Developing Stormwater Credit Systems for Trees (Shanstrom, 2014)
The following pages address incorporation of trees into stormwater management under paved surfaces
This page was last edited on 13 December 2022, at 18:43.