17:20, 31 January 2014 Mtrojantalkcontribs marked feedback post #141 as resolved on Stormwater Manual Table of Contents(The original manual combined information on swales and sand filters into a single chapter. We eventually intend to create separate sections for these BMPs but have not done so yet. To address this comment we added links to to Swales and Sand filters in...)
21:22, 10 October 2013 Mtrojantalkcontribs marked feedback post #131 as resolved on Design infiltration rates(This information is undergoing final review and will be incorporated into the Manual in the next month or two. We would be happy to provide this information now, as draft material, upon request (contact mike.trojan@state.mn.us). )
21:10, 2 August 2013 Mtrojantalkcontribs marked feedback post #76 as resolved on Design criteria for bioretention(There must be 3 feet of undisturbed soil beneath the infiltration practice and the seasonal high water table (saturated soil) or top of the bedrock. We have clarified that in the Manual.)
19:24, 1 August 2013 Mtrojantalkcontribs marked feedback post #77 as resolved on Bioretention(This information will be updated in the coming year. See http://stormwater.pca.state.mn.us/index.php/Future_updates#Updates_to_information_on_infiltration_and_infiltration_constraints )
15:49, 1 August 2013 Mtrojantalkcontribs marked feedback post #125 as resolved on Stormwater research and education(The information on the Stormwater research and education page is from the original Manual. We agree it is in need of updating and will attempt to update this when resources allow.)
16:22, 24 July 2013 Mtrojantalkcontribs marked feedback post #122 as resolved on Communicating with us(We consulted with Lois Eberhart, City of Minneapolis Water Resources Adminstrator. Her response was: "No, we would not consider any sort of irrigation management to be eligible for stormwater quality or stormwater quantity credits against the city’s ...)
15:39, 11 July 2013 Mtrojantalkcontribs marked feedback post #120 as resolved on Stormwater Manual Table of Contents(We have created an option to view all the articles as a single document. We will likely do the same where appropriate in other places in the Table of Contents. Another option for the Manual user is to create a book (see left toolbar), which allows cus...)
14:46, 19 June 2013 Mwenzeltalkcontribs marked feedback post #114 as resolved on Stormwater program for industrial activity(As long as the Permittee has chosen their Benchmark Monitoring Location in accordance with the definiton of the Industrial Stormwater Permit, how they collect the sample doesn't change that it's a regulated industrial stormwater discharge. )
18:06, 9 April 2013 Mtrojantalkcontribs marked feedback post #106 as resolved on Design infiltration rates(As part of the MIDS project, a technical team evaluated the infiltration table and determined there should be one value for B soils (0.3 in/hr). The heading is corrected. This is an important change and we are discussing how to inform Manual users abou...)
16:04, 2 April 2013 Mtrojantalkcontribs marked feedback post #88 as resolved on Permeable pavement combined(The MIDS permeable pavement group discussed this and decided to stick with the term "permeable pavement". Where appropriate, we indicate that these are systems.)