• ...iki authors. It is not a content page for the Manual. Information on this page may not be accurate and should not be used as guidance in managing stormwat [[File:Technical information page image.png|100px|right|alt=image]]
    16 KB (2,272 words) - 18:52, 3 December 2022
  • [[File:Technical information page image.png|100px|left|alt=image]] ...ermittees must provide at least one soil boring, test pit or infiltrometer test in the location of the infiltration practice for determining infiltration r
    21 KB (3,265 words) - 22:03, 16 February 2023
  • To view this section as an individual page [[TCMA Chloride Management Plan - Prioritizing and Implementing Restoration ...her a water softener is needed and avoid the ongoing expenses if it isn’t. Test water for hardness. Typically water hardness greater than 120 mg/L CaCO3 ne
    4 KB (555 words) - 17:33, 23 November 2022
  • [[File:Technical information page image.png|100px|left|alt=image]] ...reting soils and soil boring reports for infiltration BMPs|borings]]. This page includes [https://stormwater.pca.state.mn.us/index.php?title=Determining_so
    28 KB (4,170 words) - 23:33, 25 January 2023
  • [[File:Technical information page image.png|100px|right|alt=image]] ...of more common soil tests, links to information on sampling, and links to test methods.
    37 KB (5,315 words) - 14:39, 11 January 2023
  • [[File:Technical information page image.png|right|100px|alt=image]] {{alert|Because of the site-specific nature for amending soils, this page offers general guidance on amending soils rather than a specific approach.|
    12 KB (1,803 words) - 15:06, 17 January 2023
  • ...sons learned are not included below but instead were incorporated into the page on recommended street sweeping practices. *Test equipment prior to purchase, especially in hilly areas and areas that are h
    4 KB (625 words) - 19:14, 18 July 2022
  • ...wiki authors. It is not a content page for the Manual. Information on this page may not be accurate and should not be used as guidance in managing stormwat {{alert|This page is in development|alert-under-construction}}
    20 KB (2,883 words) - 18:53, 3 December 2022
  • ...wiki authors. It is not a content page for the Manual. Information on this page may not be accurate and should not be used as guidance in managing stormwat [[Scott Test Page]]
    18 KB (2,519 words) - 16:10, 2 February 2023
  • [[File:Technical information page image.png|100px|right|alt=image]] This page provides guidance for operation and maintenance (O&M) of permeable pavement
    23 KB (3,322 words) - 14:03, 30 December 2022
  • To view this section as an individual page [[TCMA Chloride Management Plan - Prioritizing and Implementing Restoration ...aces and the impacts to water resources. Look for opportunities to invent, test, and implement lower-salt-use pavement surfaces. This includes sidewalks, p
    8 KB (1,098 words) - 16:12, 23 November 2022
  • This page summarizes the structure used for the wiki version of the Design Sequence F ...design sequence flow chart - Step 39 - Provide soil boring or infiltration test results documenting low-infiltrating soils
    15 KB (2,402 words) - 15:28, 8 December 2022
  • [[File:General information page image.png|right|100px|alt=image]] ...unoff Testing] for infiltration and filtration practices. Synthetic runoff test results can be used to develop an accurate characterization of pollutant re
    7 KB (996 words) - 15:32, 27 December 2022
  • This page provides information on pollutant removal credits for Contech The Kraken, l ...ned by analyzing water quality data collected at the Lake Union Ship Canal Test Facility in Seattle, WA. The site consisted of 1.69 acres of impervious sur
    10 KB (1,409 words) - 17:38, 15 February 2023
  • .... Note the steps in this image may differ from the steps described on this page.</font size>]] Two advantages of using the wiki version on this page are that 1) the path through questions and answers is straightforward and 2
    61 KB (9,487 words) - 03:14, 25 February 2023
  • This page provides information on pollutant removal credits for Contech The Jellyfish ...ned by analyzing water quality data collected at the Lake Union Ship Canal Test Facility in Seattle, WA. The site consisted of 1.69 acres of impervious sur
    10 KB (1,374 words) - 18:15, 15 February 2023
  • This page provides guidance on how to comply with the documentation requirements outl [[media:MS4DocumentaionRequired.pdf| Here's a PDF of this page]]
    13 KB (1,935 words) - 17:37, 1 May 2024
  • This page provides information on education resources for salt management. Included a *complete and pass the associated test, and
    7 KB (973 words) - 19:56, 7 February 2023
  • [[File:Technical information page image.png|100px|left|alt=image]] This page provides a discussion of construction specifications for infiltration basin
    21 KB (3,095 words) - 20:49, 27 December 2022
  • ...te.mn.us/index.php?title=Cost-benefit_considerations_for_infiltration This page] was created in the original manual and provides some basic information, al ...ting on [https://www.pca.state.mn.us/sites/default/files/pfsd-section2.pdf page 67, Section 2], which shows inundation depths and duration of inundation fo
    17 KB (2,590 words) - 14:28, 6 December 2022
  • [[File:Technical information page image.png|100px|left|alt=image]] This page provides a discussion of construction specifications for stormwater step po
    21 KB (3,094 words) - 20:46, 27 December 2022
  • Click on a number in the image to link to a page with more information on the topic. Image:Updated MPCA_Small_Site_Graphic.JPG|Image map test
    7 KB (979 words) - 13:26, 17 January 2023
  • Eventually, this page will be redirected to the first link above.|alert-info}} ...for green roof media using the modified (DTPA)saturated paste extract (SME)test method. The ranges are for mature green roofs. Higher nitrogen levels are r
    11 KB (1,611 words) - 21:39, 7 February 2023
  • [[File:Technical information page image.png|100px|left|alt=image]] | Test
    48 KB (6,932 words) - 01:26, 1 December 2022
  • This page provides information and recommendations for maximizing volume retention in ...phosphorus removal. Mixes A and B require testing and will likely fail the test.
    21 KB (3,203 words) - 20:16, 1 December 2022
  • [[File:Technical information page image.png|100px|right|alt=image]] This page provides guidance for operation and maintenance (O&M) of <span title="Biore
    31 KB (4,328 words) - 22:25, 31 January 2023
  • This page provides a discussion of dissolved phosphorus in stormwater runoff, its sou *Reactive phosphorus is the phosphorus associated with the test for orthophosphate. It consists mostly of orthophosphate but includes a sma
    11 KB (1,529 words) - 21:03, 20 February 2023
  • [[File:Technical information page image.png|100px|left|alt=image]] This page provides guidance for operation and maintenance (O&M) of green roofs. Green
    25 KB (3,627 words) - 13:45, 30 December 2022
  • [[File:Technical information page image.png|right|100px|alt=image]] ...tps://en.wikipedia.org/wiki/Standard_penetration_test standard penetration test] (SPT).
    11 KB (1,605 words) - 13:16, 15 February 2023
  • [[File:Technical information page image.png|right|100px|alt=image]] *The location of the test should correspond to the BMP location.
    13 KB (1,941 words) - 13:24, 15 February 2023
  • [[File:Technical information page image.png|100px|left|alt=image]] This page provides a discussion of construction specifications for dry swales ([https
    22 KB (3,332 words) - 20:46, 27 December 2022
  • [[File:Technical information page image.png|100px|left|alt=image]] ...rd Test Method for Infiltration Rate of In Place Pervious Concrete''. This test method can be used on porous asphalt and PICP.
    19 KB (2,739 words) - 20:57, 27 December 2022
  • [[File:Technical information page image.png|100px|right|alt=image]] This page provides guidance for operation and maintenance (O&M) of stormwater and rai
    26 KB (3,670 words) - 17:11, 28 January 2023
  • [[File:Technical information page image.png|100px|right|alt=image]] ...and post-construction phase O&M, including inspection checklists, see the page called [[Operation and maintenance (O&M) of permeable pavement]].
    13 KB (1,791 words) - 14:02, 30 December 2022
  • [[File:Technical information page image.png|100px|left|alt=image]] *[https://minnesotawildflowers.info/page/invasive-species Invasive Plant Species in Minnesota – Minnesota Wildflow
    46 KB (6,815 words) - 14:53, 7 February 2023
  • ...iki authors. It is not a content page for the Manual. Information on this page may not be accurate and should not be used as guidance in managing stormwat [[Main page test]]
    48 KB (6,516 words) - 21:10, 10 April 2023
  • [[File:General information page image.png|right|100px|alt=image]] This page provides information and guidance for <span title="A municipal separate sto
    17 KB (2,612 words) - 14:21, 22 January 2023
  • ...the [http://stormwater.pca.state.mn.us/index.php/What%27s_New What's new] page in the manual. Information on ''road salt and water quality'' can be found ...of pavement. (By increasing the size of the test area i.e., the longer the test area, the more accurate the results will be).
    31 KB (4,965 words) - 20:40, 2 February 2023
  • [[File:Technical information page image.png|100px|left|alt=image]] This page provides guidance for operation and maintenance (O&M) of tree trenches and
    28 KB (3,985 words) - 16:12, 9 February 2023
  • ....pca.state.mn.us/index.php/Stormwater_infiltration stormwater infiltration page]. ..._facilities_with_infiltration_and.2For_recharge.29 here]. Designers should test soil at fully saturated conditions (saturated hydraulic conductivity or K<s
    16 KB (2,309 words) - 13:45, 11 February 2023
  • This page provides information on coir (coconut coir). While providing extensive info ===Test methods===
    27 KB (3,860 words) - 12:29, 2 February 2023
  • [[File:Technical information page image.png|100px|left|alt=image]] ...fertilizer to minimize the chance for nutrient runoff into surface waters. Test for presence of agricultural chemicals (e.g., herbicides, pesticides) if us
    24 KB (3,512 words) - 17:41, 11 January 2023
  • test This page provides pollutant removal credits guidance on determining credits for manu
    9 KB (1,324 words) - 15:11, 1 January 2024
  • [[File:Technical information page image.png|100px|right|alt=image]] This page provides guidance for operation and maintenance (O&M) of stormwater treatme
    22 KB (3,136 words) - 17:18, 28 January 2023
  • ...Stormwater Reuse Calculator]. A total of 576 model iterations were run to test the sensitivity of sizing a stormwater storage tank. The performance of sto The information in this section is modified from page 63-64 of the [http://www.minnehahacreek.org/sites/minnehahacreek.org/files/
    26 KB (3,824 words) - 18:52, 18 July 2022
  • [[File:Technical information page image.png|100px|right|alt=image]] ...ion Rate of Soils in Field Using Double-Ring Infiltrometer, D5093 Standard Test Method for Field Measurement of Infiltration Rate Using Double-Ring Infiltr
    44 KB (6,544 words) - 17:30, 29 December 2022
  • [[File:Technical information page image.png|right|100px|alt=image]] ...tps://en.wikipedia.org/wiki/Standard_penetration_test standard penetration test] (SPT).
    12 KB (1,783 words) - 13:13, 15 February 2023
  • [[File:Technical information page image.png|right|100px|alt=image]] ...s in the water source and the filter effluent at numerous times during the test. If SRP concentration in the water source is below 0.1 mg/L (ppm or parts
    16 KB (2,245 words) - 15:31, 27 December 2022
  • Access this page as a Word document: [[File:Stormwater wet pond fact sheet.docx]] **Open up the riser to access and test the valves (see image at right)
    12 KB (1,895 words) - 23:45, 30 January 2023
  • [[File:General information page image.png|right|100px|alt=image]] ...removal and assessing the performance of trees. Both are discussed on this page.
    29 KB (4,157 words) - 15:34, 27 December 2022

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)