Skip to main content

BMP design considerations for ground water aquifer protection

BMP design considerations for groundwater aquifer protection
BMP design considerations for groundwater aquifer protection
BMP Group Design Consideration
Bioretention
  • OK with proper caution for PSH
Filtration
  • OK with proper caution for PSH
  • Open channels are OK, but polluted runoff must be adequately pretreated
Infiltration
  • Provide a 100-foot horizontal separation distance from wells and three-foot vertical distance from the water table
  • No PSH runoff, unless treated by another practice, such as a filtering system
  • Needed pre-treatment of all runoff except rooftop
Stormwater Ponds
  • May need liner if A soils or active karst are present. The CSW permit requires a liner in areas of active karst.
  • Pre-treat PSH runoff
  • Provide a separation distance from well or water table to BMP
Constructed Stormwater Wetlands
  • May need liner if A soils or active karst are present. The CSW permit requires a liner in areas of active karst.
  • Pre-treat PSH runoff
  • Provide a separation distance from well or water table to BMP