Skip to main content

Stormwater step pool operation and maintenance checklist

 

Stormwater step pool operation and maintenance checklist.
To access an Excel version of form (for field use), click here.
Project:
Location:
Site Status:
Date:
Time:
Inspector:
Maintenance Item Satisfactory / Unsatisfactory Comments
1. Debris Cleanout (Monthly)
Contributing areas clean of litter and vegetative debris    
Filtration or infiltration facility clean    
Inlets and outlets clear    
2. Check Dams or Energy Dissipators (Annual and After Major Storms)
No evidence of flow going around structures    
No evidence of erosion at downstream toe    
3. Vegetation (Monthly)
Vegetation maintenance complies with O&M plan    
Vegetation meets performance standards (including control of specified invasive species)    
Minimum mowing depth not exceeded    
No evidence of erosion    
4. Dewatering (monthly)
Dewaters between storms within 48 hours    
5. Sediment Deposition (Annual)
Area clean of sediment    
Contributing drainage area stabilized and free of erosion    
Winter accumulation of sand removed each spring    
6. Outlet/Overflow Spillway (Annual, After Major Storms)
Good condition, no need for repair    
No evidence of erosion    
No evidence of any blockages    
No evidence of structural deterioration    
7. Other (Monthly)
Encroachment on easement area (if applicable)    
Complaints from residents (if applicable)    
Any public hazards (specify)    
Comments:
Actions to be taken: