BMP practices costs and land requirements - Appendix A: Cost Survey Tables

Appendix A: BMP Cost Survey Data Tables

Appendix A: BMP Cost Survey Data Tables

DATA SOURCES

  1. International Stormwater BMP Database Cost Data Included in July 2007 Database Release, Wright Water Engineers, Inc. and GeoSyntec Consultants (2007)
  2. Century College, White Bear Lake, MN Parking Lot Reconstruction Plans and Specifications, (2009)
  3. A Public Works Perspective on the Cost Vs. Benefit of Various Stormwater Management Practices, WSB Inc. (2007)
  4. Stormwater BMP Costs, North Carolina State University (2007)
  5. Stormwater BMP Performance Assessment and Cost-Benefit Analysis, Capitol Region Watershed District, (2010)
  6. Oakgreen Avenue, Afton MN; Infiltration Basin Construction Plans and Data, Barr Engineering Co., (2007)
  7. Medford MN School Stormwater Wetlands, Barr Engineering Co., (2008)
  8. East 145th Street Raingarden/infiltration basin, Barr Engineering Co., (2010)
  9. City of Shoreview road construction, American Public Works Assn, (2009)
  10. Lockheed Martin Eagan MN parking Lot 1, Barr Engineering Co., (2009)
  11. Owatonna Test Alley, Owatonna City Council Packet March 23, 2010
  12. Bloomington Pervious parking area bid tabs, city of Bloomington, (2009)
  13. Villanova Urban Stormwater Partnership Website, BMP Research, (2010)
Biofiltration - Raingardens data table
BMP Site Name BMP Type Ownership Footprint Arrea Units Total Watershed Area Units Capture Volume of Basin Units Watershed Land Use Construction Costs Under drain Adjusted maint costs Average Annual Maintenance Costs Year of Cost Estimate State Data Source CPI factor Cost in 2010 dollars Rain Zone Factor Zone 1 - 2010 dollars   Cost per Capture Volume (cf)
Arlington Pascal SIP - Pascal North RG raingarden City of St Paul 357 ft2 0.46 ac 209 cf mixed 💲6,750 no 474 474 2010 MN 5 1.00 💲6,750 1.12 💲6,750   💲32
Arlington Pascal SIP - Pascal Center RG raingarden City of St Paul 536 ft2 0.13 ac 227 cf mixed 💲5,421 no 793 793 2010 MN 5 1.00 💲5,421 1.12 💲5,421   💲24
Arlington Pascal SIP - Pascal South RG raingarden City of St Paul 710 ft2 0.36 ac 344 cf mixed 💲8,648 no 535 535 2010 MN 5 1.00 💲8,648 1.12 💲8,648   $25
Arlington Pascal SIP - Arlington-McKinley RG raingarden City of St Paul 767 ft2 0.37 ac 349 cf mixed 💲4,115 no 486 486 2010 MN 5 1.00 💲4,115 1.12 💲4,115   💲12
Century College Infiltration planter raingarden Century College 864 ft2     864 cf impervious 💲17,425 no     2009 MN 2 1.01 💲17,652 1.12 💲17,652   💲20
Arlington Pascal SIP - Asbury North RG raingarden City of St Paul 945 t2 0.40 ac 1,045 cf mixed 💲9,246 no 612 612 2010 MN 5 1.00 💲9,246 1.12 💲9,246   💲9
Century College Raingardens (3) raingarden Century College 1,944 t2 0.8 3 combined) 1,944 cf Impervious 💲26,988 no     2009 MN 2 1.01 💲27,339 1.12 💲27,339   💲14
Arlington Pascal SIP - Asbury South RG raingarden City of St Paul 1,712 ft2 1.08 ac 2,113 cf mixed 💲11,971 no 655 655 2010 MN 5 1.00 💲11,971 1.12 💲11,971   💲6
VUSP Bio-Infiltration Traffic Island Infiltration   1499 ft2 1.16 ac 2,258 cf mixed 💲25,412 no     2001 PA 1 1.23 💲31,257 1.12 💲31,257   💲14
Arlington Pascal SIP - Frankson-McKinley RG raingarden City of St Paul 2,078 ft2 2.80 ac 2,494 cf mixed 💲10,921 no 645 645 2010 MN 5 1.00 💲10,921 1.12 💲10,921   💲4
Arlington Pascal SIP - Hamline Midway RG raingarden City of St Paul 6,364 ft2 10.50 ac 12,576 cf mixed 💲103,172 no 1602 1602 2010 MN 5 1.00 💲103,172 1.12 💲103,172   💲8
  •  Ave maint 💲1.25
  • SD maint 💲1.18
  • Average 💲15
  • Standard Deviation 💲9
Filtration data table
BMP Site Name BMP Type Ownership Footprint Area Units Total Watershed Area Units Capture Volume of Basin Units Watershed Land Use Expected Life Span Construction Costs Underdrain Average Annual Maintenance Costs Year of Cost Estimate State Data Source CPI factor Cost in 2010 dollars Rain Zone Factor Zone 1 - 2010 dollars   Cost per Capture Volume (cf)
145th Street Infiltration Basin, Burnsville raingarden City of Burnsville 15,000 ft2     6,250 cf     💲91,124 yes   2010 MN 8 1.00 💲91,124 1.12 💲91,124   💲15
VUSP Bio-Infiltration Traffic Island filtration trench Villanova U 130 ft2     300 cf     💲27,900     2004 PA 13 1.12 💲31,248 1.15 💲90,327   💲101.09
  • Ave maint 💲1.25
  • SD maint 💲1.18
  • Average 💲15
  • Standard Deviation 💲9
Wet Ponds data table
BMP Site Name BMP Type Ownership Treated Volume Units Total Watershed Area Units Watershed Land Use Expected Life Span Construction Costs Land Costs or Value Adjusted Maint Costs Average Annual Maintenance Costs Year of Cost Estimate State Data Source CPI factor Cost in 2010 dollars Rain Zone Factor Zone 1 - 2010 dollars   Cost per treatment volume (cf)
Lakewood RP SF Vault (95) Wet Pond   700 cf 1.6 ac     💲57,000       1995 CO 1 1.43 💲81,568 0.76 💲120,205   💲172
Lakewood RP - MF Vault (96) Wet Pond   700 cf 1.6 ac     💲57,000       1996 CO 1 1.43 💲79,174 0.76 💲16,677   💲167
I-5 / La Costa (east) Wet Pond   9,150 cf 4.2 ac     💲769,841       2000 CA 1 1.27 💲974,619 1.24 💲880,301   💲96
Central Park Wet Pond Wet Pond   273,000 cf 1639.6 ac     💲585,000   💲55,327.16 💲22,500 1994 TX 1 1.47 💲860,535 0.67 💲1,438,506   💲5
Traver Creek Detention Basin Wet Pond   512,000 cf 2303.2 ac     💲187,011 💲128,750     1980 MI 1 2.65 💲494,831 1.12 💲494,8316   💲1
Cockroach Bay Agricultural Site Wet Pond   564,793 cf 210.0 ac     💲563,547   💲3,482.87 💲1,500 1996 FL 1 1.39 💲782,767 0.67 💲1,308,506   💲2
Pittsfield Retention Basin Wet Pond   914,760 cf 4872.8 ac     💲404,931 💲128,750 💲70,142.58 💲20,214 1977 MI 1 3.47 💲1,405,109 1.12 💲1,405,109   💲2
Como Park Regional Pond Wet Pond City of St Paul 2,074,893 cf 128 ac mixed 35 💲1,364,364   💲$4,550.00 💲$4,550 2010 MN 5 1.00 💲1,364,364 1.12 💲1,364,364   💲1
  • Ave maint 💲0.07
  • SD maint 💲0.10
  • Average 💲56
  • Standard Deviation 💲77