Line 137: | Line 137: | ||
===Some other stuff of interest (September 2021)=== | ===Some other stuff of interest (September 2021)=== | ||
*[https://stormwater.wef.org/2021/04/doneux-discusses-innovation-outreach-and-ms4-awards/ DONEUX DISCUSSES INNOVATION, OUTREACH, AND MS4 AWARDS] - Yes, '''THE''' Mark Doneux in an interview featured in the WEF Stormwater Report | *[https://stormwater.wef.org/2021/04/doneux-discusses-innovation-outreach-and-ms4-awards/ DONEUX DISCUSSES INNOVATION, OUTREACH, AND MS4 AWARDS] - Yes, '''THE''' Mark Doneux in an interview featured in the WEF Stormwater Report | ||
+ | *[https://www.mwmo.org/news/making-green-infrastructure-work-lessons-learned-from-towersides-district-stormwater-system/?utm_medium=email&utm_source=govdelivery Making Green Infrastructure Work: Lessons Learned from Towerside’s District Stormwater System] | ||
*[https://stormwater.wef.org/2021/07/mayors-on-six-continents-promise-green-infrastructure-investments/ MAYORS ON SIX CONTINENTS PROMISE GREEN INFRASTRUCTURE INVESTMENTS] - WEF Stormwater Report | *[https://stormwater.wef.org/2021/07/mayors-on-six-continents-promise-green-infrastructure-investments/ MAYORS ON SIX CONTINENTS PROMISE GREEN INFRASTRUCTURE INVESTMENTS] - WEF Stormwater Report | ||
*[https://stormwater.pca.state.mn.us/index.php?title=Stormwater_newsletters Stormwater newsletters] | *[https://stormwater.pca.state.mn.us/index.php?title=Stormwater_newsletters Stormwater newsletters] |
Over the past several years we've heard from people suggesting they be notified when updates are made to the Minnesota Stormwater Manual. We have also identified several stormwater management concerns and felt that focused communication on these specific issues might be useful. We therefore decided that periodic emails to subscribers would be one way of notifying practitioners about updates to the Manual and focus on specific stormwater issues. Emails are sent periodically, roughly every 6-12 weeks.
The emails contain only a short description of updates and other information. This page provides more detailed information. It is organized by the approximate dates when emails are sent to subscribers. We welcome recommendations for featured topics and links to case studies and other items of information. Please contact Mike Trojan at the MPCA..
Subscribe to the email list here.
The Minnesota Construction Stormwater Permit requires pretreatment for filtration and infiltration practices. Forebays or other pretreatment practices are highly recommended for constructed stormwater ponds. The permit, however, does not specify the type of or sizing for pretreatment practices. We are discovering that many stormwater best management practices (bmps, also often called stormwater control measures or scms) are not performing as designed, often due to heavy sediment loads to the bmp and to poor design.
Proper pretreatment can extend the life and improve performance of downstream bmps. But we frequently hear stories about inadequate or improperly designed pretreatment. This is unfortunate, since the Manual contains a wealth of information on pretreatment. For example, did you know the Manual contains the following?
Below are examples of some design issues that have been brought to our attention.
The information in the manual could be better organized and made more accessible. So, we hope to execute a work order this summer to better organize the information on pretreatment. You can help by providing the following (NOTE: We cannot endorse or promote specific commercial products, processes, or services).
The MIDS Calculator and MPCA Simple Estimator
The Minimal Impacts Design Standards (MIDS) Calculator and MPCA's Simple Estimator (Estimator) are two tools used to estimate volume and pollutant load reductions associated with implementation of stormwater control measures, also known as best management practices (BMPs). Each of these tools is widely used. The MIDS Calculator, for example, has had over 8000 downloads in the past 3 years, while the Estimator is used by many MS4 permittees to assess progress toward or determine if they are meeting a TMDL Wasteload Allocation. The advantage of these tools is they are relatively easy to use and understand. However, with simplicity comes the potential for inaccuracy. This article provides a high level discussion of these two tools, including their advantages and potential pitfalls. The closing paragraph in this article provides a discussion of how MPCA hopes to move forward in providing a better understanding and application of these tools.
MIDS Calculator
The MIDS Calculator was originally designed as a tool for determining how to meet the MIDS performance goal of 1.1 inches at development sites. Detailed discussion of the Calculator and MIDS performance goal are found on the following pages.
Despite the original intent, the Calculator is being used for purposes other than assessing volume reduction at individual sites. It was and continues to be widely used for water quality determinations, including at sub-watershed scales. This presents a number of challenges since the Calculator is not easily modified or is inflexible in addressing water quality at these larger scales. Examples of some limitations of the Calculator include the following.
These are just examples of limitations.
Fundamentally, the MIDS Calculator is limited by its platform. It is built in Excel and addressing these various issues would be challenging. Additionally, as these issues get addressed, the tool becomes more complex to use, defeating one of its original intentions.
MPCA Simple Estimator
The 2013 MS4 permit required quantification of pollutant reductions to demonstrate a permittee was making progress toward achieving or had achieved a TMDL ( total maximum daily load) wasteload allocation. The tools available, such as P8, WinSLAMM, SWMM, and even the MIDS Calculator, were accessible only to "modeling experts". As a result, the MPCA developed a simple Excel spreadsheet that employed the Simple Method. This spreadsheet was readily accessible to most practitioners and could be used to demonstrate progress toward meeting a WLA.
The tool was intended to be used for demonstrating progress toward reducing pollutant loads, since it only considered a single watershed and there was limited guidance on modifying defaults in the spreadsheet. To make the tool more robust and rigorous, the Excel workbook was updated to include up to 10 subwatersheds (as separate worksheets), default values were updated based on literature reviews, and guidance for using the tool was expanded. The tool was again widely used by permittees during the 2020-21 permit cycle. Questions and submittals we received indicated the tool continues to have limitations and is not being correctly applied in some situations. Some of the limitations in the tool include the following.
Addressing these issues
MPCA hopes to conduct a more rigorous analysis of how these tools are being used and develop appropriate guidance. Additional training is likely. The Estimator may undergo modifications based on this analysis. Unfortunately, changes to the MIDS Calculator are unlikely as the Excel platform is limiting in terms of adjusting the Calculator for water quality modeling. We are in the process of documenting some of these issues and hope to have more detailed guidance and training in place in 2022.
Alternative models may be used. The Minnesota Stormwater Manual provides a detailed summary of available water quality models. These models typically require greater modeling expertise and lack extensive documentation in the Manual, though many have user guides. The MPCA will also accept other modeling approaches, but it is recommended that permittees consult the MPCA prior to using alternative models.