Showing below up to 50 results in range #101 to #150.
View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)
- Typical diversion methods for working in the dry and their applicability (15:01, 24 July 2022)
- Typical temporary stream crossing methods and their applicability (15:01, 24 July 2022)
- Unit costs related to diversion and working in the dry (15:01, 24 July 2022)
- Unit costs related to riprap (15:02, 24 July 2022)
- Average Bid Prices for Spec Year 2014 (13:18, 26 July 2022)
- Average Bid Prices Storm drain for spec year 2014 (13:19, 26 July 2022)
- Example check dam types spacing slope applications and longevity (13:19, 26 July 2022)
- Example sizing information for riprap energy dissipators at culvert outlets (13:19, 26 July 2022)
- Expected performance benefits for various dewatering practices (13:20, 26 July 2022)
- Expected performance for check dams (13:20, 26 July 2022)
- Expected performance for outlet energy dissipators (13:20, 26 July 2022)
- Expected performance for perimeter control (13:20, 26 July 2022)
- Expected performance for stabilized earth/soil berms (13:20, 26 July 2022)
- Expected performance for storm drain inlet protection (13:20, 26 July 2022)
- Expected performance for temporary diversion barrier controls (13:23, 26 July 2022)
- Expected performance for temporary vehicle tracking BMPs (13:23, 26 July 2022)
- Expected performance for temporary/permanent sediment traps and basins (13:23, 26 July 2022)
- List of chemicals typically used for treating turbidity (Source: adapted from FHWA, 2008) (13:23, 26 July 2022)
- Maximum runoff velocity (feet per second) for a berm based on soil type (13:23, 26 July 2022)
- Recommended dimensions for stabilized berms (13:24, 26 July 2022)
- Recommended embankment widths for sediment traps (13:24, 26 July 2022)
- Sediment trap sizing table (13:24, 26 July 2022)
- Summary of inspection and maintenance activities for check dams (13:24, 26 July 2022)
- Summary of temporary construction sediment control techniques (13:25, 26 July 2022)
- Temporary Sediment Control - Corrective Actions (13:25, 26 July 2022)
- Temporary Sediment Control: Corrective Actions (13:25, 26 July 2022)
- Temporary Sediment Control: Corrective Actions - check damns (13:25, 26 July 2022)
- Unit costs related to stabilized earth/soil berms (13:25, 26 July 2022)
- Checklist for bacteria source inventory (13:54, 26 July 2022)
- Stormwater filtration practice (grass filters/swales) outflow concentrations and pollutant removals (14:08, 26 July 2022)
- Stormwater filtration practice (media filters; includes sand filters, peat mixed with sand, and other) outflow concentrations and pollutant removals (14:08, 26 July 2022)
- Stormwater pond outflow concentrations and pollutant removals (14:08, 26 July 2022)
- Stormwater wetland outflow concentrations and pollutant removals (14:09, 26 July 2022)
- Calculating credits for green roofs (14:22, 26 July 2022)
- Calculating credits for infiltration (14:22, 26 July 2022)
- Calculating credits for stormwater wetlands (14:23, 26 July 2022)
- Biofiltration - Raingardens data table (20:21, 26 July 2022)
- Differences between infiltration basins and bioretention basins (20:22, 26 July 2022)
- Minimum bioretention soil media depths recommended to target specific stormwater pollutants (20:23, 26 July 2022)
- Minimum setback requirements (for bioretention practices that treat a volume of 1000 gallons or more) (20:23, 26 July 2022)
- Summary of bioretention water quality cleansing mechanisms for common stormwater pollutants (20:24, 26 July 2022)
- Typical maintenance problems and activities for infiltration practices (20:25, 26 July 2022)
- Summary of specifications for permeable pavement (20:36, 26 July 2022)
- Calculating credits for stormwater and rainwater harvest and use/reuse (21:16, 28 July 2022)
- Updates to credits and pollutant removal values (14:05, 1 August 2022)
- Calculating credits for stormwater ponds (18:13, 1 August 2022)
- BMP pollutant removal for phosphorus (19:48, 1 August 2022)
- BMP pollutant removal for bacteria (19:48, 1 August 2022)
- BMP pollutant removal for hydrocarbons (19:49, 1 August 2022)
- BMP pollutant removal for metals (19:49, 1 August 2022)
View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)