...use/reuse#Identify_required_permits_and_applicable_codes Identify required permits]
...limited to land use, zoning, building, plumbing, and stormwater discharge permits (e.g. MS4 permit).
113 KB (16,329 words) - 17:02, 29 December 2022
*[[Summary of TMDL requirements in stormwater permits]]
21 KB (3,100 words) - 15:22, 3 December 2022
...pca.state.mn.us/water/water-permit-holders-and-chloride Chloride and NPDES Permits]
19 KB (2,771 words) - 15:03, 23 November 2022
...is because 40 C.F.R. 122.44(d)(1)(vii)(B) requires that effluent limits in permits be consistent with "the assumptions and requirements of any available waste
MS4 permits only cover water in a publicly-owned or -operated conveyance. Discharges to
45 KB (7,197 words) - 14:46, 4 December 2022
...ng a stormwater site plan review under the MS4 and Construction Stormwater Permits. For each site plan review performed, permittees must document the project
18 KB (2,638 words) - 16:11, 31 January 2023
...ng, modifying, revoking, reissuing, terminating, monitoring, and enforcing permits under the Clean Water Act, as amended (33 U.S.C. 1251 et seq. Section 1342
14 KB (2,048 words) - 15:53, 8 August 2023
...ght foot wide mulch ring, make the mulch ring as large as the tree opening permits.
18 KB (2,726 words) - 16:12, 9 February 2023
...h spawning. Note that these projects usually need state, federal, or local permits. For example, placement of cofferdams in regulated waterbodies requires per
17 KB (2,410 words) - 14:33, 14 February 2023
**Verify that all necessary certifications, licenses, permits and approvals have been obtained, including those required by the [https://
26 KB (3,670 words) - 17:11, 28 January 2023
*[[Summary of TMDL requirements in stormwater permits]]
21 KB (3,255 words) - 14:48, 23 January 2023
...nk components. This will reduce maintenance costs and confined space entry permits.
19 KB (2,688 words) - 17:15, 28 January 2023
...n they adopt or revise stormwater ordinances as part of NPDES Phase II MS4 permits.
...revise or adopt local stormwater ordinances to comply with municipal NPDES permits.
41 KB (6,386 words) - 19:17, 6 December 2022
...ation practices are installed in areas subject to state, federal, or local permits. For example, where energy dissipation materials are installed within water
21 KB (2,912 words) - 12:08, 15 February 2023
...-approved TMDLs. General information on meeting TMDL requirements in NPDES permits is found [http://stormwater.pca.state.mn.us/index.php/MS4_PART_III.STORMWAT
21 KB (3,012 words) - 20:38, 30 October 2023
...5)]]. Hotspots can be classified as Regulated, subject to state or federal permits, or Unregulated. In Minnesota Regulated hotspots are subject to the NPDES
*[https://mde.maryland.gov/programs/Permits/WaterManagementPermits/Documents/GDP%20Stormwater/MD%20Stormwater%20Hotspot
20 KB (2,956 words) - 20:49, 2 February 2023
*[[Summary of TMDL requirements in stormwater permits]]
23 KB (3,606 words) - 19:42, 14 February 2023
*[[Summary of TMDL requirements in stormwater permits]]
20 KB (2,921 words) - 01:33, 29 December 2022
**[[Summary of TMDL requirements in stormwater permits]] - updated
**[[Summary of TMDL requirements in stormwater permits]]
60 KB (8,737 words) - 18:14, 19 July 2023
*[[Summary of TMDL requirements in stormwater permits]]
28 KB (4,348 words) - 19:45, 14 February 2023
...404 permits], Minnesota Department of Natural Resources Public Waters Work Permits or Local Governmental Unit Wetland Conservation Act replacement plans or de
#Any other stormwater related permits required for the project
109 KB (17,051 words) - 19:48, 1 December 2022
...NPDES Phase I or II stormwater permits and individual construction general permits must be consistent with the load allocations and pollutant reductions conta
45 KB (6,677 words) - 13:36, 6 January 2023
...MDL_form#Link_to_TMDL_GIS_Shapefiles link]. Part II.3.a of the Phase I MS4 permits requires permittees to develop maps showing locations of structural BMPs, s
32 KB (5,079 words) - 15:54, 5 January 2023
**Apply for and obtain other local/state/federal permits
23 KB (3,285 words) - 22:15, 31 January 2023
...pca.state.mn.us/water/water-permit-holders-and-chloride Chloride and NPDES Permits]
25 KB (3,805 words) - 15:05, 23 November 2022
...pecific regulatory requirements regarding snow storage in NPDES stormwater permits. Proper snow storage may facilitate meeting NPDES requirements. For example
27 KB (4,007 words) - 14:39, 2 February 2023
*[[Summary of TMDL requirements in stormwater permits]]
33 KB (4,626 words) - 13:47, 10 February 2023
...igation system is intended to demonstrate compliance with any of the above permits and stormwater management requirements, the MPCA would not be involved in t
*Appropriations permits are required for withdrawals from any waters of the state. Appropriate is d
87 KB (12,743 words) - 18:45, 2 February 2023
...les,_images,_and_archives/Tables/Regulatory,_permits,_TMDLs '''Regulatory, permits, TMDLs''']</span>
...title="The Minnesota Pollution Control Agency administers three stormwater permits: construction, municipal, and industrial. In addition, there are several lo
89 KB (12,875 words) - 13:29, 9 February 2023
...404 permit. In addition, a permit from the [https://www.fws.gov/Endangered/permits/index.html U.S. Fish and Wildlife Service] (USFWS) may be needed if endange
30 KB (4,532 words) - 13:02, 2 February 2023
...les,_images,_and_archives/Tables/Regulatory,_permits,_TMDLs '''Regulatory, permits, TMDLs''']</span>
...title="The Minnesota Pollution Control Agency administers three stormwater permits: construction, municipal, and industrial. In addition, there are several lo
89 KB (12,945 words) - 15:54, 29 August 2023
...versions of this permit on the page. It helps with comments for new draft permits. It is nice to be able to look back and see how long something has been a r
...May 6, 2003, the Minnesota Court of Appeals ruled that the use of general permits and best management practices was appropriate, and that the monitoring requ
139 KB (19,236 words) - 15:31, 19 July 2023
*[[Summary of TMDL requirements in stormwater permits]]
32 KB (4,742 words) - 13:34, 10 February 2023
...s provide useful tips but should not be used for compliance with Minnesota permits.'''</font size>]]
22 KB (3,054 words) - 14:21, 24 January 2023
...Permit Compliance: Compliance with total maximum daily loads (TMDLs), MS4 permits, or other program requirements may require documentation of observable and/
26 KB (3,845 words) - 22:36, 20 December 2022
...ted Primary SIC code or narrative activity, separate industrial stormwater permits or No Exposure exclusions are required for the off-site facility and the ma
...code and sector requirements of the main facility. Both facilities require permits or No Exposure certification.
50 KB (6,841 words) - 15:57, 5 December 2022
*[[Summary of TMDL requirements in stormwater permits]]
40 KB (5,726 words) - 19:32, 14 February 2023
...rom U.S. EPA, June 2003). The U.S. EPA administers Class V injection well permits in Minnesota. Minimum requirements for installing, permitting, and operati
43 KB (6,049 words) - 17:06, 1 February 2023
...orm a firm but re-wettable membrane that binds soil particles together, it permits germination and growth of seed. Psyllium should be sufficiently mixed and d
27 KB (3,971 words) - 18:08, 11 January 2023
...t silt fences at least once a week and after each rainfall, as required by permits, and make required repairs immediately.
31 KB (4,701 words) - 12:14, 15 February 2023
...-approved TMDLs. General information on meeting TMDL requirements in NPDES permits is found [https://stormwater.pca.state.mn.us/index.php?title=Total_Maximum_
31 KB (4,336 words) - 13:13, 7 February 2023
...-approved TMDLs. General information on meeting TMDL requirements in NPDES permits is found [http://stormwater.pca.state.mn.us/index.php/MS4_PART_III.STORMWAT
44 KB (6,189 words) - 13:56, 11 February 2023
...and that will grow at least ten feet taller than the window(s). When space permits, use as many trees as needed to create a continuous planting.
39 KB (5,421 words) - 11:02, 26 January 2023
...ngineer accepts the water treatment plan including any contractor required permits. Include in the water treatment plan the use of sediment traps, vegetative
45 KB (6,689 words) - 12:37, 15 February 2023
...ngineer accepts the water treatment plan including any contractor required permits. Include in the water treatment plan the use of sediment traps, vegetative
39 KB (5,599 words) - 14:09, 17 January 2023
...ovide useful guidance but should not be used for compliance with Minnesota permits.'''</font size>]]
34 KB (4,859 words) - 22:08, 24 January 2023
For entities covered under municipal NPDES stormwater permits, [https://stormwater.pca.state.mn.us/index.php?title=MCM_3_Illicit_Discharg
50 KB (7,101 words) - 03:27, 25 February 2023
3. [[Temporary construction erosion and sediment control|Permits]]<br>
63 KB (7,400 words) - 13:08, 26 January 2023
...and that will grow at least ten feet taller than the window(s). When space permits, use as many trees as needed to create a continuous planting.
58 KB (8,166 words) - 17:00, 21 December 2022
...ng fall leaf pickup, the entire city is covered one time, twice if weather permits.
48 KB (7,303 words) - 21:37, 22 November 2022
...te storm sewer system, the receiving water, discharge description, and any permits issued for the discharge. The MPCA will provide a list of permitted facilit
54 KB (7,826 words) - 15:12, 3 December 2022
*What permits (if any) may be required by your local watershed district, county, or the D
47 KB (7,005 words) - 23:00, 5 January 2023
*[[Summary of TMDL requirements in stormwater permits]]
92 KB (13,204 words) - 17:06, 20 February 2023
...ple from these organizations as planning partners to help obtain the right permits and approvals when implementing green stormwater infrastructure. Contacting
66 KB (9,074 words) - 22:00, 21 February 2023
...tree material and planting specifications (see [http://www.nycgovparks.org/permits/trees/standards.pdf] [https://dnr.wisconsin.gov/topic/TreePlanting] [https:
...d not have sufficient roots left, shaving is not required if the specifier permits not shaving the root ball.
60 KB (9,524 words) - 14:29, 20 February 2023
...nches/hour (MPCA, 2022). Regulatory agencies should consider re-evaluating permits to encourage infiltration and maintain protections against local flooding.
66 KB (9,146 words) - 16:40, 3 April 2024
...nches/hour (MPCA, 2022). Regulatory agencies should consider re-evaluating permits to encourage infiltration and maintain protections against local flooding.
66 KB (9,188 words) - 16:22, 7 May 2024
...ps://www.dnr.state.mn.us/wetlands/regulations.html Wetland Regulations and Permits in Minnesota]
83 KB (11,574 words) - 16:07, 23 February 2023