m
m
Line 15: Line 15:
 
*[[Interpreting wasteload allocations based on flow/load duration curves]]
 
*[[Interpreting wasteload allocations based on flow/load duration curves]]
  
===TMDL toolkit for MS4 permit compliance===
+
==TMDL toolkit for MS4 permit compliance==
 
[[File:Quick guide.png|200px|thumb|alt=image|<font size=3>[https://stormwater.pca.state.mn.us/index.php?title=Quick_guides_for_using_models_to_meet_MS4_TMDL_permit_requirements Access a quick guide] for using models to meet MS4 TMDL requirements</font size>]]
 
[[File:Quick guide.png|200px|thumb|alt=image|<font size=3>[https://stormwater.pca.state.mn.us/index.php?title=Quick_guides_for_using_models_to_meet_MS4_TMDL_permit_requirements Access a quick guide] for using models to meet MS4 TMDL requirements</font size>]]
  

Revision as of 21:15, 9 May 2020

Total Maximum Daily Loads (TMDLs) are EPA approved amounts of pollutant loading that can occur and have a water body meet water quality standards. This page is collection of links and resources to better understand, and meet, TMDL requirements.

image of Miss and St Croix rivers confluence
Confluence of the St. Croix and Mississippi rivers. Note the St. Croix River is not impaired for sediment, while the Mississippi River is impaired.

TMDL MS4 permit guidance

TMDL toolkit for MS4 permit compliance

image
Access a quick guide for using models to meet MS4 TMDL requirements

TMDL guidance and general information

Information received from MS4 permittees

Links and other resources