Line 28: | Line 28: | ||
**[[Recommendations and guidance for utilizing P8 to meet TMDL permit requirements]] | **[[Recommendations and guidance for utilizing P8 to meet TMDL permit requirements]] | ||
**[[Case study for using P8 to meet TMDL permit requirements]] | **[[Case study for using P8 to meet TMDL permit requirements]] | ||
− | **U of MN P8 training on the use of the P8 software. P8 is a free software package for modeling stormwater pollutant management in urban watersheds. | + | **U of MN P8 training on the use of the P8 software. P8 is a free software package for modeling stormwater pollutant management in urban watersheds. For more information on training, [https://erosion.umn.edu/courses-registration/ed8001-using-p8-software-model go to this link]. |
*'''WINSLAMM''' | *'''WINSLAMM''' | ||
**[[Recommendations and guidance for utilizing WINSLAMM to meet TMDL permit requirements]] | **[[Recommendations and guidance for utilizing WINSLAMM to meet TMDL permit requirements]] |
Total Maximum Daily Loads (TMDLs) are EPA approved amounts of pollutant loading that can occur and have a water body meet water quality standards. This page is collection of links and resources to better understand, and meet, TMDL requirements.
This page was last edited on 28 May 2024, at 18:54.