Skip to main content

MS4 General Permit, Minimum Control Measures

 Minimum Control Measures

When seeking to manage a Municipal Storm Sewer System (MS4), an effective Stormwater Pollution Prevention Program (SWPPP) has six different components known as Minimum Control Measures (MCMs). Click on the links below to view guidance and resources for each MCM.

Looking for a summary? Watch this video: MS4 Program Overview and Minimum Control Measures (MCM) Descriptions - YouTube Video

NEW: MS4 Implementation Guide

The MPCA Municipal Separate Storm Sewer System (MS4) program developed the MS4 Implementation Guide to assist MS4 permittees in complying with the MS4 General Permit Minimum Control Measures (MCM) 1-6 permit requirements. This guidance package includes resources like example educational materials, written procedure templates, documentation templates, and model ordinances to support a Stormwater Pollution Prevention Program (SWPPP).  The package includes a short orientation video. 

Download the MS4 Implementation Guide (12.6 MB)