==NPDES Point Source Permits by Waterbody==
{{:NPDES Source Permits by Lake}}
239 bytes (30 words) - 15:56, 23 November 2022
==Stormwater permits and programs==
2 KB (324 words) - 15:38, 8 November 2022
<font size=3>'''NPDES Source Permits by Lake'''</font size><br>
Link to this [[NPDES Source Permits by LakeT|table]]
1 KB (167 words) - 02:34, 15 December 2022
...al information, reference, tables, images, and archives/Tables/Regulatory, permits, TMDLs]]</noinclude>
1 KB (216 words) - 22:13, 22 December 2022
<font size=3>'''NPDES Source Permits by Stream'''</font size><br>
Link to this [[NPDES Source Permits by Stream|table]]
2 KB (257 words) - 15:29, 4 August 2022
...ws for faster and more efficient permitting compared to issuing individual permits.
...home page for the 2020 Minimum Control Measures (MCM) of the Minnesota MS4 permits. Information found within this page can be used to meet the requirements ci
4 KB (561 words) - 16:22, 7 May 2024
<th>Related Permits You May Need</th>
<td>NPDES/SDS Permits</td>
12 KB (1,963 words) - 16:59, 27 December 2022
...ws for faster and more efficient permitting compared to issuing individual permits.
...home page for the 2020 Minimum Control Measures (MCM) of the Minnesota MS4 permits. Information found within this page can be used to meet the requirements ci
5 KB (709 words) - 16:23, 7 May 2024
...irements_in_stormwater_permits Summary of TMDL requirements in storm water permits]</td>
1 KB (178 words) - 19:29, 23 August 2019
<td>permits</td>
2 KB (260 words) - 20:01, 3 August 2022
'''Construction sites and stormwater permits - Does your project need MPCA construction stormwater coverage?'''
*Building permits
2 KB (326 words) - 19:24, 17 November 2022
...l adverse impacts to a wetland on a specific project site are addressed by permits or other approvals from an official statewide program (U.S. Army Corps of E
<big>If there are impacts from the project not addressed in one of the permits, decisions or other determinations discussed in item [https://stormwater.pc
3 KB (437 words) - 15:09, 8 August 2023
...ermits, Minnesota Department of Natural Resources (DNR) Public Waters Work permits or local governmental unit (LGU) Wetland Conservation Act replacement plans
...rage under this permit cannot be issued until the requirements for wetland permits, decisions, other determinations, or the mitigative sequence required in se
5 KB (729 words) - 21:01, 2 August 2023
<big>'''Issuance of Individual Permits'''. [[https://www.revisor.mn.gov/rules/7001/ Minn. R. 7001]]</big>
2 KB (217 words) - 16:48, 22 November 2022
...e.mn.us/sites/default/files/wq-strm4-94.pdf General Permit] or issue other permits, in accordance with [https://www.revisor.mn.gov/rules/7001/ Minn. R. 7001],
2 KB (293 words) - 16:47, 22 November 2022
*[[Summary of TMDL requirements in stormwater permits]]
1 KB (184 words) - 20:52, 2 February 2023
NPDES/SDS permits for construction sites near specially-protected and impaired waters require
2 KB (277 words) - 16:16, 12 January 2023
*[[Summary of TMDL requirements in stormwater permits]]
2 KB (227 words) - 15:51, 29 August 2023
<font size=3>'''Summary of federal and state stormwater related permits'''.</font size><br>
Link to this [[Federal and State Stormwater Related Permits|table]]
8 KB (1,288 words) - 21:57, 22 December 2022
#Verify that all necessary certifications, licenses, permits and approvals have been obtained, including those required by the [http://w
...time to make sure that all aspects of the design, schedule, submittals and permits are understood and any ambiguities resolved. Suggested attendees include,
6 KB (892 words) - 20:24, 17 November 2022
==Groundwater protection and underground injection control permits==
7 KB (865 words) - 13:40, 6 January 2023
....state.mn.us/index.php?title=Aaron_test_MS4_page#Previous_Permits Previous Permits]
...(population of 250,000 or more) and received reissued individual NPDES/SDS permits on January 21, 2011.">
15 KB (2,266 words) - 16:49, 7 May 2024
...s but are expected to have an MS4 permit by or before 2020. The future MS4 Permits are included in the categorical WLA for MS4s.
8 KB (1,147 words) - 15:58, 23 November 2022
...al information, reference, tables, images, and archives/Tables/Regulatory, permits, TMDLs]]
3 KB (532 words) - 02:35, 15 December 2022
...associated with the green roof (e.g. grants, review of shop drawings, and permits).
*Paper work associated with the green roof (grants, review of shop drawings, permits, etc).
7 KB (1,022 words) - 21:08, 3 August 2022
==Previous permits==
8 KB (1,192 words) - 22:34, 1 December 2022
...much of the information in the wiki relates to regulatory requirements in permits. We encourage comments and suggested edits.
2 KB (333 words) - 00:49, 23 January 2023
*[[Summary of TMDL requirements in stormwater permits]]
**Construction, Industrial & Municipal Stormwater Permits & SWPPPs - [[File:Wq-strm7-82.pdf]]
6 KB (845 words) - 17:24, 12 January 2023
..._Section_7_Issuance_of_Individual_Permits Section 7 Issuance of Individual Permits]
5 KB (732 words) - 16:33, 22 November 2022
*Permits the handling of stormwater on-site, which contributes to maintaining pre-de
2 KB (293 words) - 20:08, 3 August 2022
...onomic, and social. Because stormwater management is often linked to NPDES permits or local requirements, we added a fourth category called regulatory. Each o
**Reduces pollutant loads as required in permits
6 KB (826 words) - 18:32, 5 December 2022
...u can search for active permits on the [https://webapp.pca.state.mn.us/csw/permits MPCA Construction Stormwater Permit Search] website:
...inated first. The original permit must remain active while the other “Sub” permits are active, even if no construction activity is occurring on those portions
13 KB (2,296 words) - 20:25, 29 December 2022
...water resources clean the Minnesota Pollution Control Agency (MPCA) issues permits to construction site owners and their operators to prevent stormwater pollu
==Previous Construction Stormwater General permits==
13 KB (1,864 words) - 19:51, 15 August 2023
...S)"> '''National Pollutant Discharge Elimination System'''</span> (NPDES) permits, discharge requirements that are consistent with requirements established i
4 KB (569 words) - 15:23, 3 December 2022
...ite plan will need to account for the requirements of all agencies issuing permits.
=='''Permits'''==
14 KB (2,052 words) - 16:51, 6 March 2024
...ons of the permit and, for all permits other than hazardous waste facility permits, if these backup or auxiliary facilities are technically and economically f
6 KB (996 words) - 15:12, 3 December 2022
...pca.state.mn.us/water/water-permit-holders-and-chloride Chloride and NPDES Permits]
3 KB (481 words) - 14:38, 23 November 2022
...er discharges must be included in the WLA. TMDL requirements in Stormwater permits (MS4, Construction, and Industrial) are triggered by the inclusion of a WLA
2 KB (361 words) - 20:28, 30 November 2022
<td>Permits and other Approvals Plan</td>
3 KB (462 words) - 18:35, 5 December 2022
...pca.state.mn.us/water/water-permit-holders-and-chloride Chloride and NPDES Permits]
3 KB (506 words) - 14:33, 23 November 2022
achieve compliance with the conditions of the General Permit and, for all permits other than hazardous waste facility
permits, if these backup or auxiliary facilities are technically and economically f
8 KB (1,206 words) - 17:42, 22 November 2022
<td>Which permits and regulatory approvals are needed?</td>
3 KB (534 words) - 18:23, 5 December 2022
See [[Summary of TMDL requirements in stormwater permits]] and [[Guidance for completing the MS4 Permit TMDL Application Form]] for
3 KB (528 words) - 15:49, 29 August 2023
...(population of 250,000 or more) and received reissued individual NPDES/SDS permits on January 21, 2011.
3 KB (436 words) - 17:13, 7 March 2023
...al information, reference, tables, images, and archives/Tables/Regulatory, permits, TMDLs]]
10 KB (1,811 words) - 18:45, 13 December 2022
...d stormwater discharges, this permit does not replace or satisfy any other permits required for those discharges.
4 KB (515 words) - 15:11, 3 December 2022
...treatment devices be certified through [https://ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Stormwater-permittee-guidance-resources/Emerg
==Applicability to MPCA stormwater permits==
16 KB (2,215 words) - 18:38, 13 December 2022
==Applicability to MPCA stormwater permits==
17 KB (2,380 words) - 18:39, 13 December 2022
====Step 2. Determine if additional permits are needed====
...state and federal agencies and local units of government to determine what permits are required in addition to the National Pollutant Discharge Elimination Sy
18 KB (2,645 words) - 18:40, 27 June 2023
'''Step 2: Determine if additional permits are needed.'''
...state and federal agencies and local units of government to determine what permits are required in addition to the National Pollutant Discharge Elimination Sy
21 KB (3,054 words) - 19:49, 15 August 2023
<p>This page focuses solely on those programs and permits that are specifically tied to stormwater management, though many other prog
<p>This page focuses primarily on description/interpretation of programs and permits at the federal and state levels. Most of the decisions about development an
57 KB (8,066 words) - 16:58, 7 March 2023
...ts. This is an added project benefit related to local, state, and federal permits regarding your solar project.
4 KB (582 words) - 18:59, 2 February 2023
The Commissioner may modify this permit or issue other permits, in accordance with Minn. R. 7001, to include more stringent effluent limit
4 KB (669 words) - 15:11, 3 December 2022
...pal and industrial wastewater sources are covered by individual or general permits. Monitoring data for theWWTP are not widely available at this point in time
...water treatment facility filter backwash discharges. Individual industrial permits include discharges of noncontact cooling water, geothermal cooling water, r
20 KB (3,038 words) - 15:57, 23 November 2022
...g/Wastewater-Water/Services/Industrial-Waste/Standard-Industrial-Discharge-Permits/Industrial-Waste-Forms.aspx Met Council Environmental Services: Industrial
*[http://www.dnr.state.mn.us/permits/water/needpermit.html DNR Do I Need a Permit]
7 KB (1,036 words) - 17:57, 20 July 2022
...water resources clean the Minnesota Pollution Control Agency (MPCA) issues permits to construction site owners and their operators to prevent stormwater pollu
7 KB (1,052 words) - 17:11, 6 January 2023
...ants at numerous stages of the approval process. Final building or grading permits are not issued until all portions of the project are in line with with city
6 KB (843 words) - 14:57, 8 December 2022
*[[Summary of TMDL requirements in stormwater permits]]
5 KB (709 words) - 18:57, 27 April 2023
...ed as “Class V” wells by the Underground Injection Control Program]. Water Permits Division and Drinking Water Protection Division. Washington, D.C.
6 KB (734 words) - 02:44, 25 February 2023
...S)"> '''National Pollutant Discharge Elimination System'''</span> (NPDES) permits, discharge requirements that are consistent with requirements established i
...important to note watershed boundaries define TMDL study areas, while MS4 permits apply to a political boundary or jurisdiction. Further, WLAs apply only to
16 KB (2,522 words) - 17:56, 5 January 2023
...ritical to protect public health and water quality. Limited-term operating permits are issued to the owner and are renewable for another term if the owner dem
11 KB (1,674 words) - 22:49, 23 January 2023
...d feasible alternatives to providing BMPs in upland areas. In these cases, permits can be issued if the full wetland mitigation sequence (avoid, minimize and
5 KB (779 words) - 18:21, 23 November 2022
...pca.state.mn.us/water/water-permit-holders-and-chloride Chloride and NPDES Permits]
7 KB (973 words) - 19:56, 7 February 2023
...s provide useful tips but should not be used for compliance with Minnesota permits.'''</font size>]]
7 KB (887 words) - 21:58, 24 January 2023
...ral Nation Discharge Elimination System] (NPDES) program. The MPCA issues permits covering every type of [http://stormwater.pca.state.mn.us/index.php/Constru
6 KB (973 words) - 01:21, 7 December 2022
...ocal, regional, state and federal authorities and receiving any applicable permits, prior to conducting any work in surface waters.</big>
8 KB (1,145 words) - 21:23, 7 August 2023
...ction stormwater permit are required to comply with the conditions in both permits, including the use of down gradient perimeter controls to minimize sediment
16 KB (2,528 words) - 21:47, 27 December 2022
...onmental requirements. Check with your local government for any additional permits or requirements.
6 KB (874 words) - 22:36, 28 January 2023
[[TCMA Chloride TMDL - NPDES Point Source Permits by Waterbody]]
7 KB (963 words) - 16:37, 23 November 2022
.... While many solid waste permits have stormwater requirements, solid waste permits do not have legal authority to regulate water quality NPDES requirements.
14 KB (2,061 words) - 17:21, 5 December 2022
...s provide useful tips but should not be used for compliance with Minnesota permits.'''</font size>]]
...ght foot wide mulch ring, make the mulch ring as large as the tree opening permits.
15 KB (2,288 words) - 21:43, 24 January 2023
...ur should be contacted for more information about specific regulations and permits required for any activity undertaken that may impact land use, stormwater,
...Army Corps of Engineers (USACE). The USACE handles the actual issuance of permits (both individual and general); it also determines whether a particular plot
36 KB (5,118 words) - 15:28, 23 February 2023
...ommends using the mid value when determining wasteload allocations for MS4 permits. However, if your required pollutant reduction is zero (0) at the mid value
10 KB (1,534 words) - 15:23, 3 December 2022
**Mitigation considerations (e.g. tree replacement, wetland permits)
7 KB (998 words) - 19:02, 3 December 2022
...ugh the permit’s standards may still provide design guidelines. Additional permits may be necessary depending on the jurisdiction and the proposed location of
8 KB (1,208 words) - 13:52, 10 February 2023
...gh State Disposal System (SDS) permits. The MPCA issues combined NPDES/SDS permits for construction sites, industrial facilities and municipal separate storm
...the three stormwater permitting programs has a general permit. Individual permits may also be issued within each program.
108 KB (16,702 words) - 19:49, 20 February 2023
an ordinance, permits, standards, written policies, operational plans, legal agreements, or any o
9 KB (1,246 words) - 17:43, 22 November 2022
...he purposes of this permit may consist of contract language, an ordinance, permits, standards, written policies, operational plans, legal agreements, or any
...ts for construction site stormwater runoff control in municipal stormwater permits]]</td>
36 KB (5,350 words) - 16:52, 8 December 2022
...ble. However, chloride monitoring is being required for many facilities as permits are re-issued.
19 KB (2,928 words) - 16:31, 23 November 2022
...oses of the General Permit may consist of contract language, an ordinance, permits,
14 KB (2,085 words) - 17:43, 22 November 2022
...irements_in_stormwater_permits Summary of TMDL requirements in storm water permits]
*[[Summary of TMDL requirements in stormwater permits]]
24 KB (3,840 words) - 15:58, 12 January 2023
...irements_in_stormwater_permits Summary of TMDL requirements in storm water permits]
*[[Summary of TMDL requirements in stormwater permits]]
26 KB (3,924 words) - 16:08, 12 January 2023
...reaching natural community water bodies. In addition, homeowners who seek permits for additions to their home structures benefit from ideas such as convertin
9 KB (1,364 words) - 20:04, 20 July 2022
...s. [https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Federal-Regulation/ Refer to 33 CFR Parts 321 and 322] for additional infor
*Verify that applicable permits have been obtained before the diversion is installed
29 KB (4,320 words) - 12:59, 2 February 2023
* Obtaining permits or other approvals from an official statewide wetland permitting program (U
* If there are impacts from the project that are not addressed in one of the permits listed above, follow the appropriate measures to avoid, minimize or mitigat
19 KB (2,898 words) - 17:08, 6 January 2023
...a construction stormwater permit is required for these projects, and these permits typically have requirements for how stormwater must be managed once the pro
11 KB (1,661 words) - 22:12, 8 December 2022
...irements_in_stormwater_permits Summary of TMDL requirements in storm water permits]
*[[Summary of TMDL requirements in stormwater permits]]
26 KB (3,920 words) - 16:21, 12 January 2023
...liance-and-guidance Industrial stormwater: Individual NPDES/SDS wastewater permits compliance and guidance]
12 KB (1,550 words) - 16:56, 24 January 2023
**Applicable laws, codes and permits
...k components. This will reduce maintenance costs and confined space entry permits.
25 KB (3,513 words) - 17:22, 28 January 2023
While MS4 permits require varying degrees of quantitative and qualitative documentation on st
...ing requirements were not evident in the state permitting pages, local MS4 permits and annual reports were identified and reviewed to determine the types of s
54 KB (7,643 words) - 00:00, 31 January 2023
...pca.state.mn.us/water/water-permit-holders-and-chloride Chloride and NPDES Permits]
14 KB (2,139 words) - 14:44, 23 November 2022
...irements_in_stormwater_permits Summary of TMDL requirements in storm water permits]
15 KB (2,316 words) - 22:03, 22 November 2022
*[[Summary of TMDL requirements in stormwater permits]]
16 KB (2,237 words) - 19:26, 14 February 2023
...ten a construction stormwater permit is required for these projects. These permits have requirements for how stormwater must be managed once the project is co
12 KB (1,895 words) - 23:45, 30 January 2023
...tent. On sites with the original, undisturbed, native soil and where space permits, stockpiling and reapplying topsoil may be less costly. Importing topsoil u
11 KB (1,671 words) - 18:36, 22 November 2022
...ast projects (e.g., rain gardens) and/or individuals that have applied for permits for construction activities.
11 KB (1,669 words) - 16:11, 23 November 2022
...ed as “Class V” wells by the Underground Injection Control Program]. Water Permits Division and Drinking Water Protection Division. Washington, D.C.
13 KB (1,791 words) - 14:02, 30 December 2022
Permit may consist of contract language, an ordinance, permits, standards, written policies, operational plans, legal
23 KB (3,334 words) - 17:43, 22 November 2022
*[[Summary of TMDL requirements in stormwater permits]]
21 KB (2,980 words) - 16:07, 20 February 2023
*Increase likelihood of compliance with NPDES stormwater permits or other local requirements for managing stormwater. Examples include
12 KB (1,710 words) - 14:44, 6 February 2023