This page contains links to Microsoft Word documents that contain an example for the Minimal Impact Design Standards calculator. These files were largely developed for Version 2 of the calculator and therefore may be somewhat dated, but the basic approaches are still applicable.
- File:1 - Bioretention Basin Example.docx
- File:1 - Bioretention Basin without underdrain.docx
- File:1 - MIDS Addendum Sections1and2 final.docx
- File:10 - Swale Main Channel with underdrain.docx
- File:10 - Swale Side Slope and Wet Swale Example.docx
- File:11 - Sand Filter example.docx
- File:11 - Wet Swale.docx
- File:12 - Sand Filter.docx
- File:12 - Stormwater Pond.docx
- File:13 - Wetland example.docx
- File:13 - Wetland.docx
- File:14 - Harvest and reuse - Cistern.docx
- File:14 - Stormwater Pond.docx
- File:15 - Harvest and reuse updated.docx
- File:15 - Harvest and reuse.docx
- File:15 - Other example.docx
- File:16 - Individual vs Clumping example.docx
- File:16 - Other.docx
- File:17 - BMPs in Series Example.docx
- File:2 - Bioretention Basin with an elevated Underdrain Example.docx
- File:2 - Bioretention Basin with underdrain.docx
- File:2 - MIDS Calculator Overview.docx
- File:3 - Biofiltration Basin underdrain at bottom.docx
- File:3 - Infiltration basin.docx
- File:4 - Green Roof Example.docx
- File:4 - Green Roof.docx
- File:5 - Infiltration Basin example.docx
- File:5 - Permeable pavement.docx
- File:6 - Tree trench system-box.docx
- File:7 - Tree trench system-box with underdrain.docx
- File:7- Tree Trench Systme - Box (with out an underdrain).docx
- File:8 - Swale Side Slope.docx
- File:8 - Tree Trench System - Box (with underdrain).docx
- File:9 - Swale Main Channel.docx
- File:9 - Swale Side Slope and Main Channel Example.docx