m |
m |
||
(47 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | This page provides a summary of '''significant''' recent changes to this website. We anticipate this page will be updated infrequently | + | This page provides a summary of '''significant''' recent changes to this website. We anticipate this page will be updated infrequently. |
+ | {{alert|For more detailed information about some of the updates described below, see [[Minnesota Stormwater Manual email Updates]]|alert-info}} | ||
+ | *November 7, 2022 | ||
+ | **[[TP and TSS credits and guidance for manufactured treatment devices (mtds)]] | ||
+ | **[[Guidance and recommendations for storing transported snow and for on-site snow storage]] | ||
+ | **[[Operation and maintenance considerations for vegetation in stormwater management]] | ||
+ | **[[Assessing the performance of iron enhanced sand filter]] | ||
+ | **[[Identifying and characterizing redoximorphic features in soils and soil borings]] | ||
+ | **Street sweeping updates | ||
+ | ***[[Overview, water quality benefits, and other co-benefits of street sweeping]] | ||
+ | ***[[Recommended practices for a water quality-targeted street sweeping program]] | ||
+ | ***[[File:Fact sheet - recommended practices for a water quality targeted street sweeping program.docx]] | ||
+ | ***[[Composition, characterization, and management of street sweepings]] | ||
+ | ***[[Accounting for phosphorus load reductions with street sweeping]] | ||
+ | ***[[Cost and maintenance information for street sweeping for water quality]] | ||
+ | ***[[Street Sweeping Phosphorus Credit Calculator]] | ||
+ | **Green infrastructure updates | ||
+ | ***[[Operation and maintenance of green stormwater infrastructure best management practices]] | ||
+ | ***[[Planning green stormwater infrastructure projects and practices]] | ||
+ | ***[[Green infrastructure and green stormwater infrastructure terminology]] | ||
+ | ***[[Green Infrastructure benefits of bioretention]] | ||
+ | ***[[Green Infrastructure benefits of tree trenches and tree boxes]] | ||
+ | ***[[Green Infrastructure benefits of permeable pavement]] | ||
+ | ***[[Green Infrastructure benefits of constructed wetlands]] | ||
+ | ***[[Green Infrastructure benefits of vegetated swales]] | ||
+ | ***[[Green Infrastructure benefits of harvest and use/re-use practices]] | ||
+ | ***[[Green Infrastructure benefits of green roofs]] | ||
+ | *March 28, 2022: | ||
+ | **Operation and maintenance (O&M) of Green stormwater infrastructure (GSI) | ||
+ | ***[[Operation and maintenance of bioretention and other stormwater infiltration practices]] | ||
+ | ***[[Operation and maintenance (O&M) of tree trenches and tree boxes]] | ||
+ | ***[[Operation and maintenance (O&M) of green roofs]] | ||
+ | ***[[Operation and maintenance (O&M) of swales]] | ||
+ | ***[[Operation and maintenance (O&M) of filter strips]] | ||
+ | ***[[Operation and maintenance (O&M) of stormwater and rainwater harvest and use/reuse practices]] | ||
+ | ***[[Operation and maintenance (O&M) of stormwater treatment wetland practices]] | ||
+ | ***[[Operation and maintenance (O&M) of permeable pavement]] | ||
+ | **Street sweeping updates | ||
+ | ***[https://stormwater.pca.state.mn.us/index.php?title=Recommended_street_sweeping_practices_for_water_quality_purposes#Street_sweeping_overview Street sweeping overview] | ||
+ | ***[https://stormwater.pca.state.mn.us/index.php?title=Recommended_street_sweeping_practices_for_water_quality_purposes#Street_sweeping_equipment Street sweeping equipment] | ||
+ | ***[https://stormwater.pca.state.mn.us/index.php?title=Recommended_street_sweeping_practices_for_water_quality_purposes#Benefits_of_street_sweeping Benefits of street sweeping] | ||
+ | ***[https://stormwater.pca.state.mn.us/index.php?title=Recommended_street_sweeping_practices_for_water_quality_purposes#Effectiveness_of_street_sweeping Effectiveness of street sweeping (locations, timing, frequency)] | ||
+ | ***[https://stormwater.pca.state.mn.us/index.php?title=Recommended_street_sweeping_practices_for_water_quality_purposes#Managing_street_sweeping_waste Managing street sweeping waste] | ||
+ | ***[https://stormwater.pca.state.mn.us/index.php?title=Recommended_street_sweeping_practices_for_water_quality_purposes#Cost_considerations Cost considerations] | ||
+ | ***[https://stormwater.pca.state.mn.us/index.php?title=Recommended_street_sweeping_practices_for_water_quality_purposes#Training_for_street_sweeping_professionals Training for street sweeping professionals] | ||
+ | ***[https://stormwater.pca.state.mn.us/index.php?title=Recommended_street_sweeping_practices_for_water_quality_purposes#Street_sweeping_program_development Street Sweeping program development] | ||
+ | ***[https://stormwater.pca.state.mn.us/index.php?title=Recommended_street_sweeping_practices_for_water_quality_purposes#References References] | ||
+ | **[https://stormwater.pca.state.mn.us/index.php?title=Information_on_soil Information on soils] | ||
+ | **[[Sand filter]] | ||
+ | *March 25, 2021: Several updates since the last update | ||
+ | **The [https://stormwater.pca.state.mn.us/index.php?title=Green_Stormwater_Infrastructure_(GSI)_and_sustainable_stormwater_management Green Infrastructure section] of the Manual was reorganized and [https://stormwater.pca.state.mn.us/index.php?title=Green_stormwater_infrastructure_case_studies several case studies were added]. On-going work on Green Infrastructure continues, with a focus on operation and maintenance, and on GI project planning. | ||
+ | **The [https://stormwater.pca.state.mn.us/index.php?title=Street_sweeping street sweeping section] of the manual has been updated and new material added. | ||
+ | ***[[Street Sweeping Phosphorus Credit Calculator]] | ||
+ | ***[[Street Sweeping Phosphorus Credit Calculator: User Guide]] | ||
+ | ***[[Methods for sampling street sweeping material - Standard Operating Procedures]] | ||
+ | ***[[Methods for calculating pollutant reductions (credits) for street sweeping]] | ||
+ | ***[[Accounting for phosphorus load reductions with street sweeping]] | ||
+ | ***[[P8 Street Sweeping Modeling]] | ||
+ | **[[Training and webinar schedule]] page added | ||
+ | **Added a page called [[Tips for using the MIDS Calculator for tracking pollutant loading]] | ||
+ | **Added a page called [[Summary of changes in Version 4 Minimal Impact Design Standards (MIDS) Calculator]] | ||
+ | **Added a page called [[Spent lime, calcium water treatment residuals and application in stormwater]] | ||
+ | **Added a page called [[Assessing total suspended sediment and total phosphorus removal efficiency of permittee owned/operated constructed stormwater ponds]] | ||
+ | **Added a page called [[Aluminum and iron water treatment residuals and application in stormwater]] | ||
+ | **Added a page called [[Biochar and applications of biochar in stormwater management]] | ||
+ | *December 1, 2020: A new page has been created called [[Assessing total suspended sediment and total phosphorus removal efficiency of permittee owned/operated constructed stormwater ponds]]. This page provides guidance related to assessing the total suspended sediment (TSS) and total phosphorus (TP) removal efficiency of MS4 (Municipal Separate Storm Sewer System) permittee owned/operated ponds constructed and used for the collection and treatment of stormwater. Four (4) evaluation strategies are discussed. | ||
+ | *December 1, 2020. Lots of new information has been added on TMDLs and the MS4 permit. A list of and links to new pages is provided below. | ||
+ | **[[Summary of TMDL requirements in stormwater permits]] - updated | ||
+ | **[[Guidance for completing the MS4 Permit TMDL Application Form]] | ||
+ | **[[Guidance for meeting chloride TMDL MS4 permit requirements]] | ||
+ | **[[Guidance for meeting bacteria TMDL MS4 permit requirements]] | ||
+ | **[[Guidance for meeting dissolved oxygen or oxygen demand TMDL MS4 permit requirements]] | ||
+ | **[[Guidance for meeting temperature TMDL MS4 permit requirements]] | ||
+ | **[[Guidance for categorical TMDLs]] - updated | ||
+ | **[[List of Approved TMDLs with MS4 WLAs]] - updated | ||
+ | **[[Forms, guidance, and resources for completing the TMDL annual report form]] | ||
+ | **[[Baseline year]] | ||
+ | **[[Interpreting wasteload allocations based on flow/load duration curves]] | ||
+ | **[[Overview of models used to meet MS4 TMDL permit requirements]] | ||
+ | **[[Recommendations and guidance for utilizing P8 to meet TMDL permit requirements]] | ||
+ | **[[Case study for using P8 to meet TMDL permit requirements]] | ||
+ | **[[Recommendations and guidance for utilizing WINSLAMM to meet TMDL permit requirements]] | ||
+ | **[[Case study for using WINSLAMM to meet TMDL permit requirements]] | ||
+ | **[[Recommendations and guidance for utilizing the MIDS calculator to meet TMDL permit requirements]] | ||
+ | **[[MIDS calculator]] | ||
+ | **[[Case study for using the MIDS calculator to meet TMDL permit requirements]] | ||
+ | **[[Recommendations and guidance for utilizing the MPCA Simple Estimator to meet TMDL permit requirements]] | ||
+ | **[[Guidance and examples for using the MPCA Estimator]] | ||
+ | **[[Case study for using the MPCA Simple Estimator to meet TMDL permit requirements]] | ||
+ | **[[MPCA review of submittals using the MPCA Simple Estimator]] | ||
+ | **[[Recommendations and guidance for utilizing monitoring to meet TMDL permit requirements]] | ||
+ | **[[Recommendations and guidance for utilizing lake monitoring to meet TMDL permit requirements]] | ||
+ | **[[Recommendations and guidance for utilizing stream monitoring to meet TMDL permit requirements]] | ||
+ | **[[Recommendations and guidance for utilizing major stormwater outfall monitoring to meet TMDL permit requirements]] | ||
+ | **[[Recommendations and guidance for utilizing stormwater best management practice monitoring to meet TMDL permit requirements]] | ||
+ | *[[Quick guides for using models to meet MS4 TMDL permit requirements]] | ||
+ | *[[Case studies for monitoring to meet TMDL permit requirements]] | ||
+ | *March 16, 2020: We have been working on updates to information on event mean concentrations for phosphorus and total suspended solids. This information will be used in updates to the [https://stormwater.pca.state.mn.us/index.php?title=MIDS_calculator MIDS Calculator] and [https://stormwater.pca.state.mn.us/index.php?title=Guidance_and_examples_for_using_the_MPCA_Estimator MPCA Simple Estimator]. | ||
+ | **[[Event mean concentrations of total suspended solids in stormwater runoff]] | ||
+ | **[[Event mean concentrations of total and dissolved phosphorus in stormwater runoff]] | ||
+ | *January 7, 2020: We created a new page called [[Municipal Separate Storm Sewer System (MS4) toolkit]]. This page contains educational resources for stormwater programs. Additional materials will be added to the page as they are created throughout the year. | ||
+ | *October 3, 2019: New pages on pretreatment sizing - [[Pretreatment sizing for basins and filters strips]] and [[Technical basis for pretreatment sizing for basins and filter strips]] | ||
+ | *September 10, 2019: We have been creating several pages related to guidance for TMDLs. Most of these pages are under review and some are still in development. We anticipate having these pages fully reviewed by the end of September in advance of public noticing the MS4 permit. Pages are listed below. | ||
+ | **[[Summary of TMDL requirements in stormwater permits]] | ||
+ | **[[Forms, guidance, and resources for completing the TMDL annual report form]] | ||
+ | **[[Guidance for meeting bacteria TMDL MS4 permit requirements]] | ||
+ | **[[Guidance for meeting dissolved oxygen or oxygen demand TMDL MS4 permit requirements]] | ||
+ | **[[Guidance for meeting temperature TMDL MS4 permit requirements]] | ||
+ | **[[Overview of models used to meet MS4 TMDL permit requirements]] | ||
+ | **[[Recommendations and guidance for utilizing P8 to meet TMDL permit requirements]] | ||
+ | **[[Case study for using P8 to meet TMDL permit requirements]] | ||
+ | **[[Recommendations and guidance for utilizing WINSLAMM to meet TMDL permit requirements]] | ||
+ | **[[Case study for using WINSLAMM to meet TMDL permit requirements]] | ||
+ | **[[Recommendations and guidance for utilizing the MIDS calculator to meet TMDL permit requirements]] | ||
+ | **[[MIDS calculator]] | ||
+ | **[[Case study for using the MIDS calculator to meet TMDL permit requirements]] | ||
+ | **[[Recommendations and guidance for utilizing the MPCA Simple Estimator to meet TMDL permit requirements]] | ||
+ | **[[MPCA Simple Estimator]] | ||
+ | **[[Case study for using the MPCA Simple Estimator to meet TMDL permit requirements]] | ||
+ | **[[Recommendations and guidance for utilizing monitoring to meet TMDL permit requirements]] | ||
+ | **[[Case studies for monitoring to meet TMDL permit requirements]] | ||
+ | *September 10, 2019: We have updated the page on [https://stormwater.pca.state.mn.us/index.php?title=Compost_and_stormwater_management compost]. The page was largely reorganized, but some material was updated and some new information added. | ||
+ | *July 31, 2019: We created a new page called [[Occurrence and mechanisms of constructed stormwater ponds that do not effectively retain phosphorus]] | ||
+ | *July 31, 2019: We made some minor changes to the page called [[Mosquito control and stormwater management]], including [https://stormwater.pca.state.mn.us/index.php?title=Mosquito_control_and_stormwater_management#Literature_review adding a section] summarizing more recent work on this topic. | ||
+ | *July 30, 2019: The MPCA received a request to develop information on management and disposal of sediment collected in stormwater pretreatment practices. We created a page called [[Guidance for managing sediment and wastes collected by pretreatment practices]]. Note the MPCA does not provide specific recommendations for managing and disposing sediment collected from pretreatment practices. This page provide guidance, a literature review, and a summary of some sampling data from the literature. | ||
+ | *July 1, 2019 - several updates to the [https://stormwater.pca.state.mn.us/index.php?title=Pretreatment Pretreatment section of the manual] | ||
+ | **[https://igeowater.com/mpca/#/intro Pretreatment selection tool] | ||
+ | **[[Pretreatment - Hydrodynamic separation devices]] | ||
+ | **[[Pretreatment - Screening and straining devices, including forebays]] | ||
+ | **[[Pretreatment - Above ground and below grade storage and settling devices]] | ||
+ | **[[Pretreatment - Filtration devices and practices]] | ||
+ | **[[Pretreatment - Other pretreatment water quality devices and practices]] | ||
+ | **[[Pretreatment tables]] - link to tabled information for pretreatment practices | ||
+ | **[https://stormwater.pca.state.mn.us/index.php?title=Hydrodynamic_separator_tables_combined Hydrodynamic separator tables] | ||
+ | **[https://stormwater.pca.state.mn.us/index.php?title=Screening_and_straining_devices_tables_combined Screening and straining devices tables] | ||
+ | **[https://stormwater.pca.state.mn.us/index.php?title=Above_ground_and_below_grade_storage_and_settling_tables_combined Above ground and below grade storage and settling tables] | ||
+ | **[https://stormwater.pca.state.mn.us/index.php?title=Filtration_tables_combined Filtration tables] | ||
+ | **[https://stormwater.pca.state.mn.us/index.php?title=Other_water_quality_devices_tables_combined Other water quality devices tables] | ||
+ | **[[Case studies for pretreatment]] | ||
+ | *May 29: Several new pages pertaining to construction stormwater | ||
+ | **[[Winter construction practices for site stabilization, erosion prevention and sediment control]] | ||
+ | **[[Construction stormwater treatment - dewatering, including chemical treatment and sediment filtration]] | ||
+ | **[[Erosion prevention practices - Riprap]] | ||
+ | **[[Construction stormwater practices - temporary stream crossing]] | ||
+ | **[[Construction stormwater practices - diversion and working in the dry]] | ||
+ | **[[Construction stormwater treatment - BMP removal after final stabilization]] | ||
+ | *May 22, 2019: We've been busy adding case studies for swales and pretreatment. These pages are under review/construction at this time, but if you have comments please use the comment box at the bottom of the pages. | ||
+ | **[[Case studies for pretreatment]] | ||
+ | **[[Case studies for dry swale (grass swale)]] | ||
+ | **[https://stormwater.pca.state.mn.us/index.php?title=Case_studies_for_wet_swale Wet swale case study] | ||
+ | **[https://stormwater.pca.state.mn.us/index.php?title=Case_studies_for_high-gradient_stormwater_step-pool_swale Step pool case study] | ||
+ | *April 3, 2019: We've begun utilizing a new feature called "hover boxes". On new or updated pages, holding your mouse over bolded text will reveal a definition or explanation of the text. This tool is not widely utilized yet as incorporating it into existing pages is a low priority. Over time, the feature will become more prevalent. | ||
+ | *March 21, 2019: Three new pages on sediment control practices have been added. | ||
+ | **[[Sediment control practices - Sediment traps and basins]] | ||
+ | **[[Sediment control practices - Stabilized earth/soil berm]] | ||
+ | **[https://stormwater.pca.state.mn.us/index.php?title=Construction_stormwater_best_management_practice_%E2%80%93_buffer_zones Construction stormwater best management practice – buffer zones] | ||
+ | *March 21, 2019: Two new pages related to the Construction Stormwater permit have been added. | ||
+ | **[[Who needs a Construction Stormwater Permit?]] | ||
+ | **[[Construction Stormwater Permit timelines]] | ||
+ | *January 23, 2019: We created a new page that provides information and recommendataions for maximizing volume retention in the MIDS calculator. See [[MIDS calculator tips and information for maximizing volume retention]] | ||
+ | *December 14, 2018: We've [https://stormwater.pca.state.mn.us/index.php?title=Guidance_and_recommendations_for_conducting_a_higher_level_of_engineering_review_for_stormwater_infiltration_in_DWSMAs_and_Wellhead_Protection_Areas#Examples added three examples] to the page titled [[Guidance and recommendations for conducting a higher level of engineering review for stormwater infiltration in DWSMAs and Wellhead Protection Areas]]. These examples cover situations where a higher level of engineering review is required to utilize infiltration practices in a Drinking Water Source Management Area (DWSMA). When reviewing this section, note that we utilize a new feature called "hover boxes". Holding your mouse over any bolded text will reveal a definition or explanation of the text. | ||
+ | *December 3, 2018: Using a new extension in the wiki, we added an interactive image illustrating [[10 Steps to Stormwater Pollution Prevention on Small Residential Construction Sites]] | ||
+ | *October 4, 2018: The [https://www.itrcweb.org/ Interstate Technology and Regulatory Council] (ITRC) released a new guidance document called [https://stormwater-1.itrcweb.org/ Stormwater Best Management Practices Performance Evaluation]. This Stormwater BMP guidance offers the user details on post construction BMP lifecycle processes including contracting, cost considerations, installation factors including construction challenges, inspection checklists, and quality control and record drawings. It goes on to address long-term technology- and performance-based operational strategies, including aspects such as routine and non-routine maintenance. Data and information from existing publicly available BMP performance programs has been incorporated into an online BMP Screening Tool. Using site-specific pollutant treatment requirements and installation considerations, the Tool can assist the user by identifying a list of BMPs that may be appropriate for a given site. The Tool also provides users summarized information on the treatment efficiency, installation requirements and maintenance issues regarding the identified BMPs, with links to access more detailed information. | ||
+ | **[https://stormwater-1.itrcweb.org/ Click HERE] to access the Stormwater document. | ||
+ | **[https://stormwater-1.itrcweb.org/wp-content/uploads/2018/09/itrc_sw_bmp_tool.xlsm Click HERE] to access the BMP Screening Tool. | ||
+ | **[https://www.youtube.com/playlist?list=PL4BkJPBpegFGM6xG9oE7V7a5rVtyCrS6- Click HERE] to watch our Stormwater BMP videos. | ||
+ | *August 22, 2018: We've been busy updating the stormwater wiki to ensure everything is consistent with the new [https://stormwater.pca.state.mn.us/index.php?title=2018_Minnesota_Construction_Stormwater_Permit Construction Stormwater permit]. In addition to many subtle changes in text throughout the wiki, the following pages have undergone significant updates to be consistent with the new permit. | ||
+ | **[https://stormwater.pca.state.mn.us/index.php?title=2018_Minnesota_Construction_Stormwater_Permit 2018 permit] - an electronic version of the CSW permit | ||
+ | **[[File:What's new in the 2018 Construction Permit.pdf]] - a summary of changes from the 2013 permit | ||
+ | **[[Stormwater infiltration and contaminated soils and groundwater]] - The CSW permit requires permittees to complete a site assessment before proceeding with infiltration at sites where contaminants may be mobilized by infiltrating stormwater. MPCA developed a [[Screening assessment for contamination at potential stormwater infiltration sites]], which includes a [https://stormwater.pca.state.mn.us/index.php?title=File:Contamination_screening_checklist_for_stormwater_infiltration_July_2018.xlsx checklist] that permittees can use to meet the permit requirement. The assessment page provides guidance for completing a site assessment and the checklist. The assessment page includes four examples, information on appropriate separation between contaminants and stormwater infiltration practices, and numerous links to tools and guidance for investigating sites that may have contaminated soils or groundwater. | ||
+ | **[[Stormwater and wellhead protection]] - Infiltration requirements at sites within Drinking Water Source Management Areas (DWSMAs) are considerably less restrictive than the 2013 CSW permit. This page reflects changes in the permit, includes an updated flowchart for determining if infiltration is appropriate or prohibited at a site, has a schematic with six examples, and provides numerous links. | ||
+ | **[[Guidance and recommendations for conducting a higher level of engineering review for stormwater infiltration in DWSMAs and Wellhead Protection Areas]] - a new page to help permittees understand how to complete a higher level of engineering review at sites in DWSMAs. | ||
+ | **[[Guidance for using the Stormwater Special and impaired waters search tool]] - a new page demonstrating how to use the Special and impaired water mapping tool to determine permit compliance. | ||
+ | **[[When infiltration is not authorized under a stormwater permit]] - this page has been updated to reflect CSW permit changes related to post-construction infiltration practices. | ||
*May 22, 2018 | *May 22, 2018 | ||
**We updated [https://stormwater.pca.state.mn.us/index.php?title=Phosphorus_in_stormwater#Stormwater_design_recommendations_to_enhance_phosphorus_removal a table] on design considerations for phosphorus. The MPCA hopes to contract work in the near future to update design information for phosphorus retention in constructed ponds. | **We updated [https://stormwater.pca.state.mn.us/index.php?title=Phosphorus_in_stormwater#Stormwater_design_recommendations_to_enhance_phosphorus_removal a table] on design considerations for phosphorus. The MPCA hopes to contract work in the near future to update design information for phosphorus retention in constructed ponds. | ||
Line 101: | Line 274: | ||
*July, 2015. The MPCA will begin work on 3 new areas of work in the manual: Pretreatment, construction stormwater (to replace the Blue Book) and infiltration devices. Technical teams are being formed and the work will begin in August. New work will also begin on stormwater harvest and use in the fall. | *July, 2015. The MPCA will begin work on 3 new areas of work in the manual: Pretreatment, construction stormwater (to replace the Blue Book) and infiltration devices. Technical teams are being formed and the work will begin in August. New work will also begin on stormwater harvest and use in the fall. | ||
*June, 2015. Several pages addressing the topic of stormwater credits for runoff volume and pollutants have been added. These are under review through the month of June. These pages are specific to credits for individual BMPs. Each page is formatted similarly and contains information on the basis of credits for the BMP, methods for determining credits, recommended values, and references. Links to these pages can be found [http://stormwater.pca.state.mn.us/index.php/Category:Calculating_credits '''here''']. | *June, 2015. Several pages addressing the topic of stormwater credits for runoff volume and pollutants have been added. These are under review through the month of June. These pages are specific to credits for individual BMPs. Each page is formatted similarly and contains information on the basis of credits for the BMP, methods for determining credits, recommended values, and references. Links to these pages can be found [http://stormwater.pca.state.mn.us/index.php/Category:Calculating_credits '''here''']. | ||
− | *We have added a new page called '''[http://stormwater.pca.state.mn.us/index.php/In_the_news In the News]'''. You can find it in the left toolbar. If you are aware of a newsworthy event in the stormwater world, send us [mailto: | + | *We have added a new page called '''[http://stormwater.pca.state.mn.us/index.php/In_the_news In the News]'''. You can find it in the left toolbar. If you are aware of a newsworthy event in the stormwater world, send us [mailto:paula.kalinosky@state.mn.us an email]. We don't guarantee including it on the page, but we'll give it a look. |
− | *February 24, 2015. We have created two pdf documents containing sections of the Manual. One is for [http://stormwater.pca.state.mn.us/index.php/File:Iron_enhanced_sand_filter.pdf iron enhanced sand filters] and the other is for [http://stormwater.pca.state.mn.us/index.php/File:Green_roofs.pdf green roofs]. These were created using the Create a Book function in the left toolbar. NOTE that these documents have not been formatted in the manner typical for pdf documents and instead compile different articles from the wiki. There may therefore be unusual formatting. Using the Create a Book function you can build a customized document containing multiple pages from the Manual. See [http://stormwater.pca.state.mn.us/index.php/The_left_sidebar#Create_a_book] for help on creating a book. If you have an interest in other pdf documents being created, submit a comment using the ''Help Improve this Page'' box at the bottom of this page or submit an email to [mailto: | + | *February 24, 2015. We have created two pdf documents containing sections of the Manual. One is for [http://stormwater.pca.state.mn.us/index.php/File:Iron_enhanced_sand_filter.pdf iron enhanced sand filters] and the other is for [http://stormwater.pca.state.mn.us/index.php/File:Green_roofs.pdf green roofs]. These were created using the Create a Book function in the left toolbar. NOTE that these documents have not been formatted in the manner typical for pdf documents and instead compile different articles from the wiki. There may therefore be unusual formatting. Using the Create a Book function you can build a customized document containing multiple pages from the Manual. See [http://stormwater.pca.state.mn.us/index.php/The_left_sidebar#Create_a_book] for help on creating a book. If you have an interest in other pdf documents being created, submit a comment using the ''Help Improve this Page'' box at the bottom of this page or submit an email to [mailto:paula.kalinosky@state.mn.us us]. |
*February 24, 2015. Several pages have been created related to the TMDL Reporting Form, which is a form that must be submitted by MS4 permittees that have TMDL Wasteload Allocation requirements approved by the U.S. EPA prior to August 1, 2013. The following pages have been added. | *February 24, 2015. Several pages have been created related to the TMDL Reporting Form, which is a form that must be submitted by MS4 permittees that have TMDL Wasteload Allocation requirements approved by the U.S. EPA prior to August 1, 2013. The following pages have been added. | ||
**An [http://stormwater.pca.state.mn.us/index.php/Upload_page_with_TMDL_forms upload page] containing individual TMDL Reporting Forms for those permittees required to submit a form by June 30, 2015. | **An [http://stormwater.pca.state.mn.us/index.php/Upload_page_with_TMDL_forms upload page] containing individual TMDL Reporting Forms for those permittees required to submit a form by June 30, 2015. | ||
Line 191: | Line 364: | ||
{{alert|Mediawiki automatically saves all edits made to any page in this website. Viewers can therefore see all edits made to the website by visiting the Recent changes page, which can be accessed via a link in the left toolbar.|alert-info}} | {{alert|Mediawiki automatically saves all edits made to any page in this website. Viewers can therefore see all edits made to the website by visiting the Recent changes page, which can be accessed via a link in the left toolbar.|alert-info}} | ||
+ | |||
+ | [[Category:Level 2 - General information, reference, tables, images, and archives/Reference]] |
This page provides a summary of significant recent changes to this website. We anticipate this page will be updated infrequently.
Another page provides case studies of treatment trains. See Case studies for stormwater treatment trains.
The most recent information on this topic includes the following:
NOTE: A street sweeping spreadsheet calculator tool, developed by Kalinosky et al.(2013) and referenced on the street sweeping section of the Manual is now available.
We completed migration of content from the 2008 Manual to this website during the last week of March, 2013. We do not anticipate further significant changes in Manual content during the wiki website rollout in April. Following that, we hope to incorporate the following changes into the Manual:
This page was last edited on 19 July 2023, at 18:14.