Showing below up to 500 results in range #1 to #500.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. Load reductions reported as a percent from baseline, by TMDL‏‎ (1 revision)
  2. Interception rate for various tree species‏‎ (1 revision)
  3. Massachusetts TSS removal credit for street sweeping in new/redevelopment (MassDEP 2008b)‏‎ (1 revision)
  4. Topic index for the Minnesota Stormwater Manual‏‎ (1 revision)
  5. MS4s with applicable temperature WLAs‏‎ (1 revision)
  6. Sites undergoing revision‏‎ (1 revision)
  7. Scott Test Page‏‎ (1 revision)
  8. Other water quality devices - system and component sizing‏‎ (1 revision)
  9. Chloride Management Plan combined‏‎ (2 revisions)
  10. Unified sizing criteria combined‏‎ (2 revisions)
  11. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Cost considerations and funding opportunities‏‎ (2 revisions)
  12. Economic benefits of Green Stormwater Infrastructure‏‎ (2 revisions)
  13. Septic systems‏‎ (2 revisions)
  14. TSS and TP Removal Efficiency Evaluation Strategies‏‎ (2 revisions)
  15. Inspection skill level descriptions‏‎ (2 revisions)
  16. Links to .dwg files for bioretention‏‎ (2 revisions)
  17. RWMWD pond inspection prioritization table for Woodbury.‏‎ (2 revisions)
  18. Training programs and print materials for Post-Construction stormwater management (MCM) 5‏‎ (2 revisions)
  19. General MIDS Calculator result QAQC list‏‎ (2 revisions)
  20. Construction stormwater permit general information‏‎ (2 revisions)
  21. Minnesota DOT monthly street sweeper rental rates‏‎ (2 revisions)
  22. Construction stormwater best management practice - construction materials management requirements‏‎ (2 revisions)
  23. MIDS Calculator land cover summary‏‎ (2 revisions)
  24. Example O&M Plans, Checklists, Reports, and Maintenance Agreements for permeable pavement‏‎ (2 revisions)
  25. Iron and aluminum compounds and application in stormwater‏‎ (2 revisions)
  26. Aaron test ms4 photo library‏‎ (2 revisions)
  27. 2020 MS4 General Permit Appendix A: Alum or Ferric Chloride Phosphorus Treatment Systems‏‎ (2 revisions)
  28. Street sweeping P8 particle fractions and sediment assumptions‏‎ (2 revisions)
  29. MIDS Calculator example documents (MS WORD)‏‎ (2 revisions)
  30. TMDL model description and overview‏‎ (2 revisions)
  31. Contech The Kraken‏‎ (2 revisions)
  32. Key questions to consider during the planning phase for green stormwater infrastructure‏‎ (2 revisions)
  33. Stormwater Manual wiki terminology‏‎ (2 revisions)
  34. Part VII. APPENDIX A: Standard Conditions‏‎ (2 revisions)
  35. Levels of assessment for stormwater best management practices (stormwater control measures)‏‎ (2 revisions)
  36. Prelimiary information for Design Sequence Flow Chart‏‎ (2 revisions)
  37. Questions and answers, January 25, 2017 webinar‏‎ (2 revisions)
  38. PART III. Permit Application requirements‏‎ (2 revisions)
  39. Maintenance inspection report for permeable pavement‏‎ (2 revisions)
  40. Part IX. APPENDIX C: Limitations on Coverage‏‎ (2 revisions)
  41. Contech MWS-Linear Modular Wetland‏‎ (2 revisions)
  42. Volume based crediting for street sweeping‏‎ (2 revisions)
  43. Supporting information‏‎ (2 revisions)
  44. Comparison of Bathymetric Survey Methods‏‎ (2 revisions)
  45. Overbank flood protection criteria (Vp10)‏‎ (2 revisions)
  46. Characteristics of snowmelt‏‎ (2 revisions)
  47. Using the MPCA Simple Estimator to generate load reduction and WLA reporting terms‏‎ (2 revisions)
  48. Old Minnesota Stormwater Manual Table of Contents‏‎ (2 revisions)
  49. TCMA Chloride Management Plan - TCMA Chloride Conditions - Protection of surface and groundwater‏‎ (2 revisions)
  50. Old Minnesota Stormwater Manual Main page‏‎ (2 revisions)
  51. Green stormwater infrastructure - climate resiliency and climate adaptation‏‎ (2 revisions)
  52. Overview, water quality benefits, and other co-benefits of street sweeping‏‎ (2 revisions)
  53. Common problems and how to troubleshoot them for permeable pavement practices‏‎ (2 revisions)
  54. Summary of properties of deicing agents‏‎ (2 revisions)
  55. Swimming pools‏‎ (2 revisions)
  56. Met Council and Manual land use categories‏‎ (2 revisions)
  57. Common problems and how to troubleshoot them for swales‏‎ (2 revisions)
  58. Costs to dump unscreened solid waste at landfills‏‎ (2 revisions)
  59. Pretreatment - Other pretreatment water quality devices and practices‏‎ (3 revisions)
  60. Water quality BMP comparison matrix for TMDL models‏‎ (3 revisions)
  61. Stormwater sizing for redevelopment projects‏‎ (3 revisions)
  62. Expected performance benefits for temporary stream crossings‏‎ (3 revisions)
  63. Average costs for subsoiling for MnDOT projects from 2002-2012‏‎ (3 revisions)
  64. Number of days with lake and wetland samples exceeding the chronic and acute criterion in the TCMA, 2003-2013‏‎ (3 revisions)
  65. Training programs and print materials for Pollution Prevention/Good Housekeeping for municipal operations (MCM) 6‏‎ (3 revisions)
  66. Comparison of Four Levels of Assessment‏‎ (3 revisions)
  67. Part VIII. APPENDIX B: Definitions‏‎ (3 revisions)
  68. Industrial prevention practices for TP‏‎ (3 revisions)
  69. Recommended maintenance activities for bioretention areas‏‎ (3 revisions)
  70. Inspection action recommendations‏‎ (3 revisions)
  71. Examples of Street sweeping tracking methods in various municipalities‏‎ (3 revisions)
  72. Guidance - General Information‏‎ (3 revisions)
  73. Maintenance inspection report for dry well‏‎ (3 revisions)
  74. Load reductions reported, by TMDL‏‎ (3 revisions)
  75. Cumulative percent storm rainfall Atlas 14‏‎ (3 revisions)
  76. Links to .dwg files for filtration systems‏‎ (3 revisions)
  77. Comparison of Annual Maintenance Cost Estimator Models to Study Data‏‎ (3 revisions)
  78. Assessing the performance of sand (media) filters‏‎ (3 revisions)
  79. Minnesota Pollution Control (MPCA) Simple Estimator‏‎ (3 revisions)
  80. Expected performance benefits for riprap‏‎ (3 revisions)
  81. Information on costs and economic impacts of road salt‏‎ (3 revisions)
  82. Screening and straining devices tables combined‏‎ (3 revisions)
  83. Impaired Stream Characterization in the TCMA‏‎ (3 revisions)
  84. Stormwater models, calculators and modeling‏‎ (3 revisions)
  85. Summary of annual street sweeping costs for Minnesota case studies‏‎ (3 revisions)
  86. TCMA Chloride TMDL - Water Quality Dashboards and Watershed Areas‏‎ (3 revisions)
  87. Links to Minnesota Pollution Control Agency cleanup and remediation information‏‎ (3 revisions)
  88. Typical temporary winter BMPs‏‎ (3 revisions)
  89. Rain gardens (bioretention) 101‏‎ (3 revisions)
  90. TCMA Chloride TMDL - Literature Cited‏‎ (3 revisions)
  91. Impaired Lakes, Wetlands and Streams by WD & WMO‏‎ (3 revisions)
  92. Product parameters for compost filter berm application‏‎ (3 revisions)
  93. Aaron test 4‏‎ (3 revisions)
  94. SWPPP Template for Small Construction Sites‏‎ (3 revisions)
  95. Overview of green stormwater infrastructure (GSI) and sustainable stormwater management‏‎ (3 revisions)
  96. Stormwater videos‏‎ (3 revisions)
  97. Sources of data for use in stormwater models‏‎ (3 revisions)
  98. Floating silt curtains‏‎ (3 revisions)
  99. PART IV. Rights and Responsibilities‏‎ (3 revisions)
  100. Recommendations and guidance for utilizing select models to meet TMDL permit requirements‏‎ (3 revisions)
  101. TCMA Chloride TMDL - TMDL Tables‏‎ (3 revisions)
  102. Infiltration design guideline - determining site infiltration rates‏‎ (3 revisions)
  103. Water extractable phosphate in composts and land-applied organic materials‏‎ (3 revisions)
  104. Above ground and below grade storage and settling tables combined‏‎ (3 revisions)
  105. NPDES Source Permits by Stream‏‎ (3 revisions)
  106. Maintenance inspection report for tree trench/tree box‏‎ (3 revisions)
  107. Considerations for construction scheduling‏‎ (3 revisions)
  108. Definitions and terminology for construction stormwater‏‎ (3 revisions)
  109. Supporting material for swales‏‎ (3 revisions)
  110. MIDS Calculator stormwater pond design level criteria related to pond volume‏‎ (3 revisions)
  111. MIDS Calculator BMP summary‏‎ (3 revisions)
  112. Construction Stormwater Permit Notice of Termination and Site Closeout Checklist‏‎ (3 revisions)
  113. Maintenance costs for stormwater and rainwater harvest and use/reuse practices‏‎ (3 revisions)
  114. Infiltration design guideline - use of multiple cells‏‎ (3 revisions)
  115. General MPCA Simple Estimator result QAQC list‏‎ (3 revisions)
  116. 2020 MS4 General Permit Section 18 MCM 3: Illicit Discharge Detection and Elimination‏‎ (3 revisions)
  117. Check dam maintenance checklist‏‎ (3 revisions)
  118. Links for construction stormwater‏‎ (3 revisions)
  119. Comparison of Construction Cost Estimator Models to Study Data‏‎ (3 revisions)
  120. Physical properties of spent lime‏‎ (3 revisions)
  121. Example of inspection prioritization categories‏‎ (3 revisions)
  122. Control measures‏‎ (3 revisions)
  123. General P8 result QAQC list‏‎ (3 revisions)
  124. May 6 engineered media meeting notes‏‎ (3 revisions)
  125. Guidance for incorporating street sweeping into the Minimal Impact Design Standards Calculator and MPCA’s Simple Estimator‏‎ (3 revisions)
  126. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Winter maintenance leadership (state, county, city, schools and private)‏‎ (3 revisions)
  127. Infiltration design guideline - perform groundwater mounding analysis‏‎ (3 revisions)
  128. Computer-aided design and drafting (CAD/CADD) drawings‏‎ (3 revisions)
  129. Summary of BMP Construction Costs from Estimator Models‏‎ (3 revisions)
  130. Stormwater step pool materials specifications‏‎ (3 revisions)
  131. Resources and guidance documents exist for developing green stormwater infrastructure ordinances‏‎ (3 revisions)
  132. Expected performance benefits for diversion and working in the dry‏‎ (3 revisions)
  133. Example construction access agreement‏‎ (3 revisions)
  134. Stormwater Wetland Sizing Parameters‏‎ (3 revisions)
  135. Survey results for managing street sweeping materials‏‎ (3 revisions)
  136. Phase I Minneapolis Table of Contents‏‎ (3 revisions)
  137. Maintenance inspection report for underground infiltration facilities‏‎ (3 revisions)
  138. TMDL model comparison matrix‏‎ (3 revisions)
  139. Using P8 to calculate load reduction and WLA reporting terms‏‎ (3 revisions)
  140. PART I. Permit Goals‏‎ (3 revisions)
  141. Summary of permit requirements for infiltration‏‎ (3 revisions)
  142. MnDOT specifications for granular filter material under all other riprap‏‎ (3 revisions)
  143. MN CSW Permit Section 7 BMP Selection and Stormwater Management‏‎ (3 revisions)
  144. Other water quality devices tables combined‏‎ (3 revisions)
  145. Determining the appropriate storage size for a stormwater and rainwater harvest and use/reuse system‏‎ (3 revisions)
  146. Region 1 nutrient reduction efficiency factors for sweeping impervious areas (USEPA 2017a)‏‎ (3 revisions)
  147. Impaired Lakes, Wetlands and Streams by MS4‏‎ (3 revisions)
  148. Relative cost and effectiveness for common construction BMPs‏‎ (3 revisions)
  149. MPCA Simple Estimator: Rv, TSS EMC, and TP EMC Values for Land Use Types‏‎ (3 revisions)
  150. Summary of new street sweeper costs‏‎ (3 revisions)
  151. Aaron test ms4 acknowledgements‏‎ (3 revisions)
  152. Maintenance inspection report for infiltration trench‏‎ (3 revisions)
  153. Streams impaired by chloride in the TCMA‏‎ (3 revisions)
  154. 2023 Minnesota Construction Stormwater Permit‏‎ (3 revisions)
  155. Municipal prevention practices for bacteria‏‎ (3 revisions)
  156. Physical properties of aluminum and iron water treatment residuals‏‎ (3 revisions)
  157. Summary of Annual BMP Maintenance Costs from Estimator Models‏‎ (3 revisions)
  158. Checklist for bacteria source inventory‏‎ (3 revisions)
  159. Infiltration design guideline - preliminary judgement on suitability of a site for infiltration‏‎ (3 revisions)
  160. Unit costs related to diversion and working in the dry‏‎ (3 revisions)
  161. Particle size distribution of aluminum and iron water treatment residuals‏‎ (3 revisions)
  162. WinSLAMM land use and source area types‏‎ (3 revisions)
  163. Street sweeping management options‏‎ (3 revisions)
  164. Stormwater chemical Best Management Practices‏‎ (4 revisions)
  165. BMP pollutant removal for metals‏‎ (4 revisions)
  166. External resources for infiltration‏‎ (4 revisions)
  167. Pollutants of concern from operations‏‎ (4 revisions)
  168. Recommendations for temporary stream diversion channel lining‏‎ (4 revisions)
  169. TMDL reporting links: South Metro Mississippi River TSS TMDL‏‎ (4 revisions)
  170. Estimating the water balance for a stormwater and rainwater harvest and use/reuse site‏‎ (4 revisions)
  171. Comparison of BMP Land Area Estimator Models to Study Data‏‎ (4 revisions)
  172. P8 mass balance terms‏‎ (4 revisions)
  173. Miscellaneous information‏‎ (4 revisions)
  174. MnDOT winter guidelines‏‎ (4 revisions)
  175. Stormwater Wetland Performance Summary‏‎ (4 revisions)
  176. Excerpt from Table 2575-4, Required Corrective Action‏‎ (4 revisions)
  177. Average TP and TSS loading rates for three land use groups‏‎ (4 revisions)
  178. Expected performance for natural and synthetic mulches‏‎ (4 revisions)
  179. Sequence of events and type of personnel resources to help green stormwater infrastructure planners‏‎ (4 revisions)
  180. Winter parking lot and sidewalk maintenance combined‏‎ (4 revisions)
  181. Hydrodynamic separator tables combined‏‎ (4 revisions)
  182. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Water softeners‏‎ (4 revisions)
  183. Excerpt from Table 2575-4 Required Corrective Action‏‎ (4 revisions)
  184. Acknowledgements for iron enhanced sand filters‏‎ (4 revisions)
  185. Guidance on storage compensation rules for disconnection lengths‏‎ (4 revisions)
  186. Residential prevention practices for TP‏‎ (4 revisions)
  187. Average chloride concentrations in groundwater based on land use‏‎ (4 revisions)
  188. 2020 MS4 General Permit Section 17 MCM 2: Public Participation/Involvement‏‎ (4 revisions)
  189. Lbs per lane mile to lbs per 1000 sq ft conversion‏‎ (4 revisions)
  190. Summary of BMP Land Areas from Estimator Models‏‎ (4 revisions)
  191. Maintenance inspection report for bioinfiltration basins‏‎ (4 revisions)
  192. Crediting methods summary‏‎ (4 revisions)
  193. Infiltration design guideline - sizing outlet structure and/or flow diversion structure‏‎ (4 revisions)
  194. Overview for sand (media) filters‏‎ (4 revisions)
  195. Symbols‏‎ (4 revisions)
  196. Construction requirements for compost filter sock‏‎ (4 revisions)
  197. Municipal prevention practices for TP‏‎ (4 revisions)
  198. Examples of Implementation Strategies for Winter Maintenance Leadership‏‎ (4 revisions)
  199. Advantages and disadvantages of above- or below-ground tanks and stormwater ponds‏‎ (4 revisions)
  200. Common problems and how to troubleshoot them for green roofs‏‎ (4 revisions)
  201. Suggested compost filter sock flow rates‏‎ (4 revisions)
  202. Success stories: salt reduction and cost saving examples‏‎ (4 revisions)
  203. Summary of seeding methods and related information for temporary stabilization‏‎ (4 revisions)
  204. TCMA Chloride Management Plan - Appendix B – Winter Maintenance Assessment tool (WMAt)‏‎ (4 revisions)
  205. Recommend filtration efficiency for P8‏‎ (4 revisions)
  206. Example O&M plans, checklists, reports, and maintenance agreements for swales‏‎ (4 revisions)
  207. Industrial prevention practices for bacteria‏‎ (4 revisions)
  208. Acknowledgements for manufactured treatment devices‏‎ (4 revisions)
  209. Number of days with stream samples exceeding the chronic and acute criterion in the TCMA, 2003-2013‏‎ (4 revisions)
  210. Archived census maps‏‎ (4 revisions)
  211. MS4s with no TMDL applications‏‎ (4 revisions)
  212. PART II. Coverage Under this Pemit‏‎ (4 revisions)
  213. Introduction to stormwater BMPs‏‎ (4 revisions)
  214. Extreme flood control criteria (Vp100)‏‎ (4 revisions)
  215. Summary of costs for dry swale case study - International Plaza Drive Improvements‏‎ (4 revisions)
  216. Studies analyzing minimum soil volume needed by trees‏‎ (4 revisions)
  217. Design Considerations for Automated Makeup Water Supply Systems‏‎ (4 revisions)
  218. What is an MS4?‏‎ (4 revisions)
  219. Construction stormwater best management practice - stockpile management‏‎ (4 revisions)
  220. Typical winter decommission and maintenance tasks for rainwater harvesting‏‎ (4 revisions)
  221. General relationship of soil bulk density to root growth based on soil texture‏‎ (4 revisions)
  222. Using the MIDS Calculator to generate load reduction and WLA reporting terms‏‎ (4 revisions)
  223. MS4 TMDL compliance monitoring strategy summary‏‎ (4 revisions)
  224. Smart Salting (S2) training information - Additional Winter Maintenance Resources‏‎ (4 revisions)
  225. Watershed projects and virtual tours‏‎ (4 revisions)
  226. Web site policy‏‎ (4 revisions)
  227. Average seeding bid prices‏‎ (4 revisions)
  228. Things to look for when reviewing MIDS calculator files and submissions‏‎ (4 revisions)
  229. Speed of melting‏‎ (4 revisions)
  230. Impaired Lake and Wetland Characterization in the TCMA‏‎ (4 revisions)
  231. Calibration chart for augured or conveyed manual controlled spreaders‏‎ (4 revisions)
  232. Wet swale operation and maintenance checklist‏‎ (4 revisions)
  233. Qualitative comparison of various methods of infiltration rate measurement‏‎ (4 revisions)
  234. Do's and Don'ts of Iron Enhanced Sand Filters (IESFs)‏‎ (4 revisions)
  235. Types of mulch products typically used on construction sites‏‎ (4 revisions)
  236. Links for street sweeping‏‎ (4 revisions)
  237. TCMA Chloride TMDL - Future Growth Consideration/Reserve Capacity‏‎ (4 revisions)
  238. Unit costs related to stabilized earth/soil berms‏‎ (4 revisions)
  239. Lowest practical melting temperature‏‎ (4 revisions)
  240. Construction specifications for sand (media) filters‏‎ (4 revisions)
  241. Overview and schedule of general maintenance activities for green roofs‏‎ (4 revisions)
  242. Maintenance inspection report for infiltration basins‏‎ (4 revisions)
  243. Expected performance for temporary seeding and stabilization practices‏‎ (4 revisions)
  244. TCMA Chloride TMDL - NPDES Point Source Permits by Waterbody‏‎ (4 revisions)
  245. Inside the home‏‎ (4 revisions)
  246. Long-term chloride trends in lakes in the TCMA‏‎ (4 revisions)
  247. Pounds of ice melted per pound of salt‏‎ (4 revisions)
  248. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Wastewater treatment facilities and industrial dischargers‏‎ (4 revisions)
  249. Stormwater filtration practice (grass filters/swales) outflow concentrations and pollutant removals‏‎ (4 revisions)
  250. Technical support‏‎ (4 revisions)
  251. Filtration Summary Table‏‎ (4 revisions)
  252. TCMA Chloride Management Plan - Appendix D – Educational Resources‏‎ (4 revisions)
  253. Water supply fixture units (WSFU) for typical non-potable applications‏‎ (4 revisions)
  254. Small scale erosion control‏‎ (4 revisions)
  255. Stormwater Harvesting and Use Component Checklist and Cost Units‏‎ (4 revisions)
  256. Stormwater infiltration and constraints on infiltration combined‏‎ (4 revisions)
  257. Construction stormwater technical support documents for manual updates‏‎ (4 revisions)
  258. Twin Cities Campus – Winter Maintenance Improvements‏‎ (4 revisions)
  259. Training requirements for the Construction Stormwater Permit‏‎ (4 revisions)
  260. PART VI. Stormwater Management Program Assessment, Reporting and Other Submittals‏‎ (4 revisions)
  261. Construction stormwater best management practice – Dewatering and Basin Draining‏‎ (4 revisions)
  262. Filtration tables combined‏‎ (4 revisions)
  263. Pollutant concentrations for stormwater BMPs‏‎ (4 revisions)
  264. Wet swale pollutant load reduction‏‎ (4 revisions)
  265. Protecting Water Quality in Urban Areas: Best Management Practices for Dealing with Storm Water Runoff from Urban, Suburban, and Developing Areas of Minnesota‏‎ (4 revisions)
  266. Summary of Construction Cost Data Collected‏‎ (4 revisions)
  267. Stormwater filtration BMPs – selection considerations‏‎ (4 revisions)
  268. Stormwater filtration practice (media filters; includes sand filters, peat mixed with sand, and other) outflow concentrations and pollutant removals‏‎ (4 revisions)
  269. Cost estimate worksheets‏‎ (4 revisions)
  270. Green infrastructure and green stormwater infrastructure terminology‏‎ (4 revisions)
  271. Example O&M plans, checklists, reports, and maintenance agreements for stormwater and rainwater harvest and use/reuse practices‏‎ (4 revisions)
  272. Questions and answers January 9 2018 webinar‏‎ (4 revisions)
  273. Harvested stormwater site survey and information worksheet‏‎ (4 revisions)
  274. Pathogen types and examples‏‎ (4 revisions)
  275. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Water treatment facilities (water supply)‏‎ (4 revisions)
  276. Removal of metals by lime sludge (spent lime) used for water softening‏‎ (4 revisions)
  277. TSS and TP EMC literature values for TMDL modeling‏‎ (4 revisions)
  278. Compost Specifications‏‎ (4 revisions)
  279. Overview of common plans for the green stormwater infrastructure planning process‏‎ (4 revisions)
  280. Pretreatment - Additional considerations‏‎ (4 revisions)
  281. Table showing typical BMP best attainable effluent concentrations‏‎ (4 revisions)
  282. Stormwater focus group‏‎ (4 revisions)
  283. Excerpt from Table 2575-4 - Required Corrective Action‏‎ (4 revisions)
  284. Risk-based treatment requirements for stormwater harvest and use systems‏‎ (4 revisions)
  285. Wildlife habitat and biodiversity benefits of Green Stormwater Infrastructure‏‎ (4 revisions)
  286. Training and certification for green stormwater infrastructure‏‎ (4 revisions)
  287. Recharge and infiltration criterion (Vre)‏‎ (4 revisions)
  288. Results of Regression Analyses for Average Winter Chloride Concentrations (2004-2013)‏‎ (4 revisions)
  289. Typical BMP TSS and TP removal rates from Minnesota Stormwater Manual‏‎ (4 revisions)
  290. Common problems and how to troubleshoot them for vegetated filter strips‏‎ (4 revisions)
  291. Construction stormwater photo gallery - Vehicle tracking BMPs‏‎ (4 revisions)
  292. Stormwater reuse project data contact information‏‎ (4 revisions)
  293. Water harvesting and use system matrix‏‎ (4 revisions)
  294. Land use event mean concentrations (emcs) for the MPCA Simple Estimator‏‎ (4 revisions)
  295. List of current funding opportunities for green stormwater infrastructure‏‎ (4 revisions)
  296. Rainwater harvesting overflow discharge location - methods‏‎ (4 revisions)
  297. Water reuse key site considerations‏‎ (4 revisions)
  298. Minimal Impact Design Standards (MIDS) Implementation Case Study: City of White Bear Lake‏‎ (5 revisions)
  299. TCMA Chloride TMDL - Public Participation‏‎ (5 revisions)
  300. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Policy makers‏‎ (5 revisions)
  301. Damage costs per ton of road salt‏‎ (5 revisions)
  302. Resources for Cities, Townships, Counties, and WMOs/WDs‏‎ (5 revisions)
  303. Infiltration as a stormwater management practice‏‎ (5 revisions)
  304. Recommended practices for a water quality-targeted street sweeping program‏‎ (5 revisions)
  305. Infiltration design guideline - maximum flow path‏‎ (5 revisions)
  306. Primary cost components for stormwater wetlands‏‎ (5 revisions)
  307. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Citizens‏‎ (5 revisions)
  308. 2017 MS4 Technical Assistance and Outreach Needs Survey Results‏‎ (5 revisions)
  309. Acknowledgements for construction stormwater‏‎ (5 revisions)
  310. Average Bid trafficker Prices for Spec Year 2014‏‎ (5 revisions)
  311. Crown distance scoring system‏‎ (5 revisions)
  312. Stormwater Utility Fee: City of Saint Peter‏‎ (5 revisions)
  313. Stormwater Steering Committee‏‎ (5 revisions)
  314. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Implementation strategies‏‎ (5 revisions)
  315. Lbs per 1000 sq ft to lps per lane mile conversion‏‎ (5 revisions)
  316. Cumulative percent storm rainfall Bulletin 71‏‎ (5 revisions)
  317. NOAA Atlas 14 recurrence intervals and storm durations‏‎ (5 revisions)
  318. Overview and schedule of general maintenance activities for permeable pavement practices‏‎ (5 revisions)
  319. Summary of quantities - stormwater step pool case study‏‎ (5 revisions)
  320. Wet swale materials specifications‏‎ (5 revisions)
  321. MS4 Illicit discharge discoveries and reports tracking template‏‎ (5 revisions)
  322. General WinSLAMM result QAQC list‏‎ (5 revisions)
  323. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Citizen attitudes and practices‏‎ (5 revisions)
  324. Mulch types application rates benefits, and limitations‏‎ (5 revisions)
  325. Pretreatment practices combined single page‏‎ (5 revisions)
  326. TCMA Chloride Management Plan - TCMA Chloride Conditions - TMDL summary‏‎ (5 revisions)
  327. Engineers estimate for installation of one 1,500 gallon aboveground corrugated steel storage tank‏‎ (5 revisions)
  328. Industrial prevention practices for TSS‏‎ (5 revisions)
  329. Links for stormwater and rainwater harvest and use/reuse‏‎ (5 revisions)
  330. Calculating credits for high-gradient stormwater step-pool swale‏‎ (5 revisions)
  331. Common problems and how to troubleshoot them for wetlands‏‎ (5 revisions)
  332. Stormwater wetland outflow concentrations and pollutant removals‏‎ (5 revisions)
  333. Cold climate plant materials of the upper midwest with known salt tolerance, listed from wet to dry soil moisture‏‎ (5 revisions)
  334. Recommended contributing drainage area for infiltration BMPs‏‎ (5 revisions)
  335. Stormwater blogs‏‎ (5 revisions)
  336. Example O&M plans, checklists, reports, and maintenance agreements for green roofs‏‎ (5 revisions)
  337. Chloride reduction case study: The Promenade of Wayzata‏‎ (5 revisions)
  338. Subwatershed and channel characteristics‏‎ (5 revisions)
  339. Links to .dwg files for swales‏‎ (5 revisions)
  340. TSS credits for street sweeping‏‎ (5 revisions)
  341. Soils with low P-Index‏‎ (5 revisions)
  342. Minimum water quality for rainwater catchment systems‏‎ (5 revisions)
  343. Table 2575-4 Required Corrective Action‏‎ (5 revisions)
  344. NPDES Source Permits by Lake‏‎ (5 revisions)
  345. Training programs and print materials for Minimum Control Measure (MCM) 4‏‎ (5 revisions)
  346. Contech Jellyfish Filter‏‎ (5 revisions)
  347. Detailed information on specific models‏‎ (5 revisions)
  348. Construction stormwater best management practice – Forest road exemption‏‎ (5 revisions)
  349. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Chloride reduction strategy‏‎ (5 revisions)
  350. Common roofing materials and water quality considerations‏‎ (5 revisions)
  351. Dry swale system with underdrain parameters‏‎ (5 revisions)
  352. Common problems and how to troubleshoot them for tree trenches and tree boxes‏‎ (5 revisions)
  353. MnDOT specifications for granular filter material under Class I random riprap‏‎ (5 revisions)
  354. Supporting material for infiltration‏‎ (5 revisions)
  355. Links to .dwg files for bioretention and infiltration‏‎ (5 revisions)
  356. Typical inspection/maintenance frequencies for stormwater wetlands‏‎ (5 revisions)
  357. BMP pollutant removal for hydrocarbons‏‎ (5 revisions)
  358. Minimum Water Quality‏‎ (5 revisions)
  359. Qualitative and quantitative evaluation and assessment of trees‏‎ (5 revisions)
  360. Construction stormwater photo gallery - Outlet energy dissipation‏‎ (5 revisions)
  361. Cost-benefit considerations for sand (media) filters‏‎ (5 revisions)
  362. Dry swale materials specifications‏‎ (5 revisions)
  363. Pond design sizing criteria‏‎ (5 revisions)
  364. Fructification scoring system‏‎ (5 revisions)
  365. Perimeter control‏‎ (5 revisions)
  366. Literature review summary for Unified Sizing Criteria‏‎ (5 revisions)
  367. MnDOT approved - qualified hydraulic mulch products‏‎ (5 revisions)
  368. Check dam materials specifications‏‎ (5 revisions)
  369. Stormwater filtration BMPs - overview‏‎ (5 revisions)
  370. Summary of water reuse criteria for select nonpotable applications from reuse programs from several states‏‎ (5 revisions)
  371. Step 2 Calibration Chart for auger or conveyor systems‏‎ (5 revisions)
  372. Processes utilized by Best Management Practices - Constructed Basins‏‎ (5 revisions)
  373. Owner Responsibilities Under the Construction Stormwater Permit‏‎ (5 revisions)
  374. Typical maintenance problems and activities for dry swales‏‎ (5 revisions)
  375. Average turf reinforcement mats bid prices for Spec Year 2014‏‎ (5 revisions)
  376. Stormwater Harvest and Use Funding Sources‏‎ (5 revisions)
  377. Unified sizing criteria section‏‎ (5 revisions)
  378. Check dam inspection checklist‏‎ (5 revisions)
  379. Acknowledgements for Green Stormwater Infrastructure (GSI) and sustainable stormwater management‏‎ (5 revisions)
  380. Biofiltration - Raingardens data table‏‎ (5 revisions)
  381. Fact sheets for green roofs‏‎ (5 revisions)
  382. Illicit Discharge Detection and Elimination (IDDE): City of Mankato‏‎ (5 revisions)
  383. Assessing the performance of high-gradient stormwater step-pool swale‏‎ (5 revisions)
  384. Summary of Annual Maintenance Cost Data Collected‏‎ (5 revisions)
  385. Calculating credits for sand (media) filters‏‎ (5 revisions)
  386. Potential biochar stormwater applications‏‎ (5 revisions)
  387. Reported Activities that Restore or Decrease Soil Bulk Density‏‎ (5 revisions)
  388. High Risk Lakes in the TCMA‏‎ (5 revisions)
  389. Export to pdf‏‎ (5 revisions)
  390. MS4 Summary for Bennett Lake‏‎ (5 revisions)
  391. Air quality benefits of Green Stormwater Infrastructure‏‎ (5 revisions)
  392. Aaron test mcm 3‏‎ (5 revisions)
  393. Tree trench/box photo gallery‏‎ (5 revisions)
  394. Temporary Sediment Control - Corrective Actions‏‎ (5 revisions)
  395. Updates to credits and pollutant removal values‏‎ (5 revisions)
  396. TCMA Chloride TMDL - Reasonable Assurance‏‎ (5 revisions)
  397. Aaron test mcm 2‏‎ (5 revisions)
  398. Minnesota Stormwater Manual emails‏‎ (5 revisions)
  399. Overview and schedule of general maintenance activities for swales‏‎ (5 revisions)
  400. Why is a municipality regulated under the MS4 permit?‏‎ (5 revisions)
  401. Photo gallery for pretreatment‏‎ (5 revisions)
  402. Stormwater reuse for irrigation - preliminary modeling analysis‏‎ (5 revisions)
  403. Fact sheet‏‎ (5 revisions)
  404. Construction stormwater best management practice – Sediment controls on linear utility projects‏‎ (5 revisions)
  405. BMP pollutant removal for bacteria‏‎ (5 revisions)
  406. Construction stormwater best management practice – Linear Utility Projects‏‎ (5 revisions)
  407. Stormwater step pool construction inspection checklist‏‎ (5 revisions)
  408. Surface sand filter cost estimate worksheet‏‎ (5 revisions)
  409. Fact sheet on stormwater guidance for solar farm projects‏‎ (5 revisions)
  410. Pretreatment pollutant removal characteristics - all devices‏‎ (5 revisions)
  411. Green Infrastructure planning checklist‏‎ (5 revisions)
  412. 2020 MS4 General Permit Section 9 Application for Reissuance‏‎ (5 revisions)
  413. Unit costs related to riprap‏‎ (5 revisions)
  414. Expected performance for storm drain inlet protection‏‎ (5 revisions)
  415. Social benefits of Green Stormwater Infrastructure‏‎ (5 revisions)
  416. High Risk Streams in the TCMA‏‎ (6 revisions)
  417. Example sizing information for riprap energy dissipators at culvert outlets‏‎ (6 revisions)
  418. Supporting material for green roofs‏‎ (6 revisions)
  419. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Winter maintenance professionals (state, county, city, schools, parks, private)‏‎ (6 revisions)
  420. MIDS calculator comparisons‏‎ (6 revisions)
  421. Wet swale - Recommended Short Term (3-Year) Maintenance Schedule for Carpenter Creek project‏‎ (6 revisions)
  422. Stormwater infiltration BMPs – selection considerations‏‎ (6 revisions)
  423. Post-Storage Treatment Process Considerations‏‎ (6 revisions)
  424. Dry swale operation and maintenance checklist‏‎ (6 revisions)
  425. Expected performance for outlet energy dissipators‏‎ (6 revisions)
  426. Bioretention device cost estimate worksheet‏‎ (6 revisions)
  427. Summary of TMDL and Components for Impaired Streams in the TCMA‏‎ (6 revisions)
  428. Check dam related average Bid Prices‏‎ (6 revisions)
  429. Conversion units‏‎ (6 revisions)
  430. Filtration data table‏‎ (6 revisions)
  431. Lessons learned and advice from street sweeping programs‏‎ (6 revisions)
  432. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Municipalities‏‎ (6 revisions)
  433. Stormwater step pool operation and maintenance checklist‏‎ (6 revisions)
  434. 2013 MS4 General Permit‏‎ (6 revisions)
  435. Examples of RUSLE practice management factors for construction sites‏‎ (6 revisions)
  436. 2020 MS4 General Permit Section 11 Existing Permittee Applicants‏‎ (6 revisions)
  437. Step 4 Calibration Chart for auger or conveyor systems‏‎ (6 revisions)
  438. Open vegetated swale materials specifications‏‎ (6 revisions)
  439. 2020 MS4 General Permit Section 15 Minimum Control Measures (MCMs)‏‎ (6 revisions)
  440. Unit processes of stormwater treatment techniques - filtration practices‏‎ (6 revisions)
  441. Summary of street sweeping tracking methodologies‏‎ (6 revisions)
  442. Typical maintenance problems for infiltration trenches and basins‏‎ (6 revisions)
  443. Anti-icing application rates‏‎ (6 revisions)
  444. Typical maintenance problems and activities for stormwater step pools‏‎ (6 revisions)
  445. Summary of TMDL and Components for Impaired Lakes and Wetlands in the TCMA‏‎ (6 revisions)
  446. Pretreatment - Filtration devices and practices‏‎ (6 revisions)
  447. BMP pollutant removal for total nitrogen‏‎ (6 revisions)
  448. Pond stage / storage‏‎ (6 revisions)
  449. Specific yields for geologic materials‏‎ (6 revisions)
  450. Performance-Based Chloride Reduction Strategies‏‎ (6 revisions)
  451. MnDOT specifications for geotextile under riprap‏‎ (6 revisions)
  452. Acknowledgements for dry swale‏‎ (6 revisions)
  453. Summary of Chesapeake Bay Program street sweeping crediting‏‎ (6 revisions)
  454. Example spreadsheet - Cumulative volume above normal surface elevation‏‎ (6 revisions)
  455. Stormwater infiltration BMPs - overview‏‎ (6 revisions)
  456. Construction stormwater best management practice – Stormwater Model Ordinances‏‎ (6 revisions)
  457. Event mean concentrations by land use‏‎ (6 revisions)
  458. Maximum Detention Time - Average Daily Temperature‏‎ (6 revisions)
  459. Excerpt from Table 10. Strategies and actions proposed for the Coon Creek subwatershed‏‎ (6 revisions)
  460. Infiltration photo gallery‏‎ (6 revisions)
  461. Design considerations for green stormwater infrastructure best management practices‏‎ (6 revisions)
  462. WinSLAMM control practice summary‏‎ (6 revisions)
  463. Runoff coefficients by land use and soil type‏‎ (6 revisions)
  464. Sediment Dewatering and Disposal Case Study: City of Eden Prairie Timber Creek Townhomes Stormwater Pond Sediment Removal and Disposal‏‎ (6 revisions)
  465. Construction stormwater best management practice – Preventing further damage after floods‏‎ (6 revisions)
  466. Summary of TMDL (lbs/day) and Components for Impaired Streams in the TCMA‏‎ (6 revisions)
  467. Summary of sate of Minnesota water quality guidelines for stormwater harvesting and reuse systems for Irrigation‏‎ (6 revisions)
  468. Temporary Sediment Control: Corrective Actions - check damns‏‎ (6 revisions)
  469. Water‏‎ (6 revisions)
  470. Urban Stormwater Quality Characteristics from Paved Surfaces‏‎ (6 revisions)
  471. Case studies for Smart Salting (S2) and road salt winter maintenance‏‎ (6 revisions)
  472. Screening and straining devices - system design information‏‎ (6 revisions)
  473. 2020 MS4 General Permit Section 13 Stormwater Pollution Prevention Program (SWPPP)‏‎ (6 revisions)
  474. Processes utilized by Best Management Practices - Manufactured Devices‏‎ (6 revisions)
  475. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Minnesota Pollution Control Agency‏‎ (6 revisions)
  476. Calibration chart for gravity flow equipment‏‎ (6 revisions)
  477. Pond, lake, and wetland inventory‏‎ (6 revisions)
  478. Filtration - system and component sizing‏‎ (6 revisions)
  479. Summary of inspection and maintenance activities for check dams‏‎ (6 revisions)
  480. Peak discharge (cfs) during a wet year (2002)‏‎ (6 revisions)
  481. Examples of Municipal and Private Cost Savings‏‎ (6 revisions)
  482. Construction stormwater photo gallery - Storm drain inlet protection‏‎ (6 revisions)
  483. Description of street sweeping disposal options‏‎ (6 revisions)
  484. Stormwater Pollutants Associated With Common Operations at Potential Stormwater Hotspots‏‎ (6 revisions)
  485. Design restrictions for special waters - constructed ponds and wetlands‏‎ (6 revisions)
  486. Comparison of precipitation totals from TP-40, Bulletin 71, and Atlas 14‏‎ (6 revisions)
  487. Links to information and guidance on stormwater infiltration at contaminated sites‏‎ (6 revisions)
  488. Infiltration design guideline - drawdown time‏‎ (6 revisions)
  489. Neat websites and articles for trees‏‎ (6 revisions)
  490. Common problems and how to troubleshoot them for Stormwater and Rainwater Harvest and Use/Reuse Practices‏‎ (6 revisions)
  491. Characteristics of quicklime and hydrated lime‏‎ (6 revisions)
  492. Using WinSLAMM to generate load reduction and WLA reporting terms‏‎ (6 revisions)
  493. Links for pretreatment‏‎ (6 revisions)
  494. Expected performance for check dams‏‎ (6 revisions)
  495. TCMA Chloride TMDL - Impaired and High Risk Waterbodies by Location‏‎ (6 revisions)
  496. Salt - Sand yard to ton conversions‏‎ (6 revisions)
  497. Concentrations of TP, OP, and DP for four mtds and Minnesota runoff‏‎ (6 revisions)
  498. Itemized stormwater harvest and use system component costs‏‎ (6 revisions)
  499. Supporting material for pretreatment‏‎ (6 revisions)
  500. Construction stormwater photo gallery - Sediment basins and traps‏‎ (6 revisions)

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)