Showing below up to 500 results in range #51 to #550.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. TCMA Chloride Management Plan - TCMA Chloride Conditions - Protection of surface and groundwater‏‎ (2 revisions)
  2. Old Minnesota Stormwater Manual Table of Contents‏‎ (2 revisions)
  3. Green stormwater infrastructure - climate resiliency and climate adaptation‏‎ (2 revisions)
  4. Overview, water quality benefits, and other co-benefits of street sweeping‏‎ (2 revisions)
  5. Common problems and how to troubleshoot them for permeable pavement practices‏‎ (2 revisions)
  6. Summary of properties of deicing agents‏‎ (2 revisions)
  7. Swimming pools‏‎ (2 revisions)
  8. Old Minnesota Stormwater Manual Main page‏‎ (2 revisions)
  9. Region 1 nutrient reduction efficiency factors for sweeping impervious areas (USEPA 2017a)‏‎ (3 revisions)
  10. Impaired Lakes, Wetlands and Streams by MS4‏‎ (3 revisions)
  11. Relative cost and effectiveness for common construction BMPs‏‎ (3 revisions)
  12. MPCA Simple Estimator: Rv, TSS EMC, and TP EMC Values for Land Use Types‏‎ (3 revisions)
  13. Summary of new street sweeper costs‏‎ (3 revisions)
  14. Aaron test ms4 acknowledgements‏‎ (3 revisions)
  15. Maintenance inspection report for infiltration trench‏‎ (3 revisions)
  16. Streams impaired by chloride in the TCMA‏‎ (3 revisions)
  17. 2023 Minnesota Construction Stormwater Permit‏‎ (3 revisions)
  18. Municipal prevention practices for bacteria‏‎ (3 revisions)
  19. Physical properties of aluminum and iron water treatment residuals‏‎ (3 revisions)
  20. Other water quality devices tables combined‏‎ (3 revisions)
  21. Determining the appropriate storage size for a stormwater and rainwater harvest and use/reuse system‏‎ (3 revisions)
  22. Unit costs related to diversion and working in the dry‏‎ (3 revisions)
  23. Particle size distribution of aluminum and iron water treatment residuals‏‎ (3 revisions)
  24. WinSLAMM land use and source area types‏‎ (3 revisions)
  25. Street sweeping management options‏‎ (3 revisions)
  26. Summary of Annual BMP Maintenance Costs from Estimator Models‏‎ (3 revisions)
  27. Checklist for bacteria source inventory‏‎ (3 revisions)
  28. Infiltration design guideline - preliminary judgement on suitability of a site for infiltration‏‎ (3 revisions)
  29. Pretreatment - Other pretreatment water quality devices and practices‏‎ (3 revisions)
  30. Water quality BMP comparison matrix for TMDL models‏‎ (3 revisions)
  31. Stormwater sizing for redevelopment projects‏‎ (3 revisions)
  32. Expected performance benefits for temporary stream crossings‏‎ (3 revisions)
  33. Training programs and print materials for Pollution Prevention/Good Housekeeping for municipal operations (MCM) 6‏‎ (3 revisions)
  34. Comparison of Four Levels of Assessment‏‎ (3 revisions)
  35. Part VIII. APPENDIX B: Definitions‏‎ (3 revisions)
  36. Average costs for subsoiling for MnDOT projects from 2002-2012‏‎ (3 revisions)
  37. Number of days with lake and wetland samples exceeding the chronic and acute criterion in the TCMA, 2003-2013‏‎ (3 revisions)
  38. Inspection action recommendations‏‎ (3 revisions)
  39. Examples of Street sweeping tracking methods in various municipalities‏‎ (3 revisions)
  40. Guidance - General Information‏‎ (3 revisions)
  41. Maintenance inspection report for dry well‏‎ (3 revisions)
  42. Load reductions reported, by TMDL‏‎ (3 revisions)
  43. Cumulative percent storm rainfall Atlas 14‏‎ (3 revisions)
  44. Links to .dwg files for filtration systems‏‎ (3 revisions)
  45. Industrial prevention practices for TP‏‎ (3 revisions)
  46. Recommended maintenance activities for bioretention areas‏‎ (3 revisions)
  47. Assessing the performance of sand (media) filters‏‎ (3 revisions)
  48. Minnesota Pollution Control (MPCA) Simple Estimator‏‎ (3 revisions)
  49. Expected performance benefits for riprap‏‎ (3 revisions)
  50. Information on costs and economic impacts of road salt‏‎ (3 revisions)
  51. Comparison of Annual Maintenance Cost Estimator Models to Study Data‏‎ (3 revisions)
  52. Summary of annual street sweeping costs for Minnesota case studies‏‎ (3 revisions)
  53. TCMA Chloride TMDL - Water Quality Dashboards and Watershed Areas‏‎ (3 revisions)
  54. Screening and straining devices tables combined‏‎ (3 revisions)
  55. Impaired Stream Characterization in the TCMA‏‎ (3 revisions)
  56. Stormwater models, calculators and modeling‏‎ (3 revisions)
  57. Impaired Lakes, Wetlands and Streams by WD & WMO‏‎ (3 revisions)
  58. Product parameters for compost filter berm application‏‎ (3 revisions)
  59. Aaron test 4‏‎ (3 revisions)
  60. SWPPP Template for Small Construction Sites‏‎ (3 revisions)
  61. Links to Minnesota Pollution Control Agency cleanup and remediation information‏‎ (3 revisions)
  62. Typical temporary winter BMPs‏‎ (3 revisions)
  63. Rain gardens (bioretention) 101‏‎ (3 revisions)
  64. TCMA Chloride TMDL - Literature Cited‏‎ (3 revisions)
  65. Overview of green stormwater infrastructure (GSI) and sustainable stormwater management‏‎ (3 revisions)
  66. Stormwater videos‏‎ (3 revisions)
  67. Sources of data for use in stormwater models‏‎ (3 revisions)
  68. Floating silt curtains‏‎ (3 revisions)
  69. PART IV. Rights and Responsibilities‏‎ (3 revisions)
  70. Recommendations and guidance for utilizing select models to meet TMDL permit requirements‏‎ (3 revisions)
  71. TCMA Chloride TMDL - TMDL Tables‏‎ (3 revisions)
  72. Water extractable phosphate in composts and land-applied organic materials‏‎ (3 revisions)
  73. Above ground and below grade storage and settling tables combined‏‎ (3 revisions)
  74. NPDES Source Permits by Stream‏‎ (3 revisions)
  75. Maintenance inspection report for tree trench/tree box‏‎ (3 revisions)
  76. Considerations for construction scheduling‏‎ (3 revisions)
  77. Definitions and terminology for construction stormwater‏‎ (3 revisions)
  78. Infiltration design guideline - determining site infiltration rates‏‎ (3 revisions)
  79. MIDS Calculator stormwater pond design level criteria related to pond volume‏‎ (3 revisions)
  80. Supporting material for swales‏‎ (3 revisions)
  81. Construction Stormwater Permit Notice of Termination and Site Closeout Checklist‏‎ (3 revisions)
  82. Maintenance costs for stormwater and rainwater harvest and use/reuse practices‏‎ (3 revisions)
  83. Infiltration design guideline - use of multiple cells‏‎ (3 revisions)
  84. General MPCA Simple Estimator result QAQC list‏‎ (3 revisions)
  85. 2020 MS4 General Permit Section 18 MCM 3: Illicit Discharge Detection and Elimination‏‎ (3 revisions)
  86. Check dam maintenance checklist‏‎ (3 revisions)
  87. Links for construction stormwater‏‎ (3 revisions)
  88. Comparison of Construction Cost Estimator Models to Study Data‏‎ (3 revisions)
  89. MIDS Calculator BMP summary‏‎ (3 revisions)
  90. Physical properties of spent lime‏‎ (3 revisions)
  91. Example of inspection prioritization categories‏‎ (3 revisions)
  92. Control measures‏‎ (3 revisions)
  93. General P8 result QAQC list‏‎ (3 revisions)
  94. May 6 engineered media meeting notes‏‎ (3 revisions)
  95. Guidance for incorporating street sweeping into the Minimal Impact Design Standards Calculator and MPCA’s Simple Estimator‏‎ (3 revisions)
  96. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Winter maintenance leadership (state, county, city, schools and private)‏‎ (3 revisions)
  97. Infiltration design guideline - perform groundwater mounding analysis‏‎ (3 revisions)
  98. Computer-aided design and drafting (CAD/CADD) drawings‏‎ (3 revisions)
  99. Stormwater step pool materials specifications‏‎ (3 revisions)
  100. Resources and guidance documents exist for developing green stormwater infrastructure ordinances‏‎ (3 revisions)
  101. Expected performance benefits for diversion and working in the dry‏‎ (3 revisions)
  102. Summary of BMP Construction Costs from Estimator Models‏‎ (3 revisions)
  103. Survey results for managing street sweeping materials‏‎ (3 revisions)
  104. Example construction access agreement‏‎ (3 revisions)
  105. Stormwater Wetland Sizing Parameters‏‎ (3 revisions)
  106. Using P8 to calculate load reduction and WLA reporting terms‏‎ (3 revisions)
  107. PART I. Permit Goals‏‎ (3 revisions)
  108. Summary of permit requirements for infiltration‏‎ (3 revisions)
  109. MnDOT specifications for granular filter material under all other riprap‏‎ (3 revisions)
  110. MN CSW Permit Section 7 BMP Selection and Stormwater Management‏‎ (3 revisions)
  111. Phase I Minneapolis Table of Contents‏‎ (3 revisions)
  112. Maintenance inspection report for underground infiltration facilities‏‎ (3 revisions)
  113. TMDL model comparison matrix‏‎ (3 revisions)
  114. Stormwater focus group‏‎ (4 revisions)
  115. Excerpt from Table 2575-4 - Required Corrective Action‏‎ (4 revisions)
  116. Risk-based treatment requirements for stormwater harvest and use systems‏‎ (4 revisions)
  117. Wildlife habitat and biodiversity benefits of Green Stormwater Infrastructure‏‎ (4 revisions)
  118. Training and certification for green stormwater infrastructure‏‎ (4 revisions)
  119. Recharge and infiltration criterion (Vre)‏‎ (4 revisions)
  120. Results of Regression Analyses for Average Winter Chloride Concentrations (2004-2013)‏‎ (4 revisions)
  121. Typical BMP TSS and TP removal rates from Minnesota Stormwater Manual‏‎ (4 revisions)
  122. Common problems and how to troubleshoot them for vegetated filter strips‏‎ (4 revisions)
  123. Pretreatment - Additional considerations‏‎ (4 revisions)
  124. Table showing typical BMP best attainable effluent concentrations‏‎ (4 revisions)
  125. Construction stormwater photo gallery - Vehicle tracking BMPs‏‎ (4 revisions)
  126. Stormwater reuse project data contact information‏‎ (4 revisions)
  127. Water harvesting and use system matrix‏‎ (4 revisions)
  128. Land use event mean concentrations (emcs) for the MPCA Simple Estimator‏‎ (4 revisions)
  129. List of current funding opportunities for green stormwater infrastructure‏‎ (4 revisions)
  130. Rainwater harvesting overflow discharge location - methods‏‎ (4 revisions)
  131. Water reuse key site considerations‏‎ (4 revisions)
  132. Pollutants of concern from operations‏‎ (4 revisions)
  133. Recommendations for temporary stream diversion channel lining‏‎ (4 revisions)
  134. TMDL reporting links: South Metro Mississippi River TSS TMDL‏‎ (4 revisions)
  135. Estimating the water balance for a stormwater and rainwater harvest and use/reuse site‏‎ (4 revisions)
  136. Comparison of BMP Land Area Estimator Models to Study Data‏‎ (4 revisions)
  137. P8 mass balance terms‏‎ (4 revisions)
  138. Miscellaneous information‏‎ (4 revisions)
  139. Stormwater chemical Best Management Practices‏‎ (4 revisions)
  140. BMP pollutant removal for metals‏‎ (4 revisions)
  141. External resources for infiltration‏‎ (4 revisions)
  142. Average TP and TSS loading rates for three land use groups‏‎ (4 revisions)
  143. Expected performance for natural and synthetic mulches‏‎ (4 revisions)
  144. Sequence of events and type of personnel resources to help green stormwater infrastructure planners‏‎ (4 revisions)
  145. Winter parking lot and sidewalk maintenance combined‏‎ (4 revisions)
  146. MnDOT winter guidelines‏‎ (4 revisions)
  147. Stormwater Wetland Performance Summary‏‎ (4 revisions)
  148. Excerpt from Table 2575-4, Required Corrective Action‏‎ (4 revisions)
  149. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Water softeners‏‎ (4 revisions)
  150. Excerpt from Table 2575-4 Required Corrective Action‏‎ (4 revisions)
  151. Acknowledgements for iron enhanced sand filters‏‎ (4 revisions)
  152. Guidance on storage compensation rules for disconnection lengths‏‎ (4 revisions)
  153. Residential prevention practices for TP‏‎ (4 revisions)
  154. Hydrodynamic separator tables combined‏‎ (4 revisions)
  155. 2020 MS4 General Permit Section 17 MCM 2: Public Participation/Involvement‏‎ (4 revisions)
  156. Lbs per lane mile to lbs per 1000 sq ft conversion‏‎ (4 revisions)
  157. Summary of BMP Land Areas from Estimator Models‏‎ (4 revisions)
  158. Maintenance inspection report for bioinfiltration basins‏‎ (4 revisions)
  159. Crediting methods summary‏‎ (4 revisions)
  160. Average chloride concentrations in groundwater based on land use‏‎ (4 revisions)
  161. Infiltration design guideline - sizing outlet structure and/or flow diversion structure‏‎ (4 revisions)
  162. Overview for sand (media) filters‏‎ (4 revisions)
  163. Symbols‏‎ (4 revisions)
  164. Construction requirements for compost filter sock‏‎ (4 revisions)
  165. Municipal prevention practices for TP‏‎ (4 revisions)
  166. Examples of Implementation Strategies for Winter Maintenance Leadership‏‎ (4 revisions)
  167. Advantages and disadvantages of above- or below-ground tanks and stormwater ponds‏‎ (4 revisions)
  168. Success stories: salt reduction and cost saving examples‏‎ (4 revisions)
  169. Summary of seeding methods and related information for temporary stabilization‏‎ (4 revisions)
  170. TCMA Chloride Management Plan - Appendix B – Winter Maintenance Assessment tool (WMAt)‏‎ (4 revisions)
  171. Recommend filtration efficiency for P8‏‎ (4 revisions)
  172. Example O&M plans, checklists, reports, and maintenance agreements for swales‏‎ (4 revisions)
  173. Industrial prevention practices for bacteria‏‎ (4 revisions)
  174. Acknowledgements for manufactured treatment devices‏‎ (4 revisions)
  175. Number of days with stream samples exceeding the chronic and acute criterion in the TCMA, 2003-2013‏‎ (4 revisions)
  176. Archived census maps‏‎ (4 revisions)
  177. Common problems and how to troubleshoot them for green roofs‏‎ (4 revisions)
  178. Suggested compost filter sock flow rates‏‎ (4 revisions)
  179. Introduction to stormwater BMPs‏‎ (4 revisions)
  180. Extreme flood control criteria (Vp100)‏‎ (4 revisions)
  181. Summary of costs for dry swale case study - International Plaza Drive Improvements‏‎ (4 revisions)
  182. Studies analyzing minimum soil volume needed by trees‏‎ (4 revisions)
  183. MS4s with no TMDL applications‏‎ (4 revisions)
  184. PART II. Coverage Under this Pemit‏‎ (4 revisions)
  185. Design Considerations for Automated Makeup Water Supply Systems‏‎ (4 revisions)
  186. What is an MS4?‏‎ (4 revisions)
  187. Construction stormwater best management practice - stockpile management‏‎ (4 revisions)
  188. Typical winter decommission and maintenance tasks for rainwater harvesting‏‎ (4 revisions)
  189. General relationship of soil bulk density to root growth based on soil texture‏‎ (4 revisions)
  190. Using the MIDS Calculator to generate load reduction and WLA reporting terms‏‎ (4 revisions)
  191. MS4 TMDL compliance monitoring strategy summary‏‎ (4 revisions)
  192. Smart Salting (S2) training information - Additional Winter Maintenance Resources‏‎ (4 revisions)
  193. Watershed projects and virtual tours‏‎ (4 revisions)
  194. Average seeding bid prices‏‎ (4 revisions)
  195. Things to look for when reviewing MIDS calculator files and submissions‏‎ (4 revisions)
  196. Speed of melting‏‎ (4 revisions)
  197. Impaired Lake and Wetland Characterization in the TCMA‏‎ (4 revisions)
  198. Calibration chart for augured or conveyed manual controlled spreaders‏‎ (4 revisions)
  199. Wet swale operation and maintenance checklist‏‎ (4 revisions)
  200. Web site policy‏‎ (4 revisions)
  201. Unit costs related to stabilized earth/soil berms‏‎ (4 revisions)
  202. Lowest practical melting temperature‏‎ (4 revisions)
  203. Construction specifications for sand (media) filters‏‎ (4 revisions)
  204. Overview and schedule of general maintenance activities for green roofs‏‎ (4 revisions)
  205. Maintenance inspection report for infiltration basins‏‎ (4 revisions)
  206. Expected performance for temporary seeding and stabilization practices‏‎ (4 revisions)
  207. TCMA Chloride TMDL - NPDES Point Source Permits by Waterbody‏‎ (4 revisions)
  208. Qualitative comparison of various methods of infiltration rate measurement‏‎ (4 revisions)
  209. Do's and Don'ts of Iron Enhanced Sand Filters (IESFs)‏‎ (4 revisions)
  210. Types of mulch products typically used on construction sites‏‎ (4 revisions)
  211. Links for street sweeping‏‎ (4 revisions)
  212. TCMA Chloride TMDL - Future Growth Consideration/Reserve Capacity‏‎ (4 revisions)
  213. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Wastewater treatment facilities and industrial dischargers‏‎ (4 revisions)
  214. Stormwater filtration practice (grass filters/swales) outflow concentrations and pollutant removals‏‎ (4 revisions)
  215. Technical support‏‎ (4 revisions)
  216. Filtration Summary Table‏‎ (4 revisions)
  217. TCMA Chloride Management Plan - Appendix D – Educational Resources‏‎ (4 revisions)
  218. Water supply fixture units (WSFU) for typical non-potable applications‏‎ (4 revisions)
  219. Inside the home‏‎ (4 revisions)
  220. Long-term chloride trends in lakes in the TCMA‏‎ (4 revisions)
  221. Pounds of ice melted per pound of salt‏‎ (4 revisions)
  222. Stormwater infiltration and constraints on infiltration combined‏‎ (4 revisions)
  223. Construction stormwater technical support documents for manual updates‏‎ (4 revisions)
  224. Twin Cities Campus – Winter Maintenance Improvements‏‎ (4 revisions)
  225. Training requirements for the Construction Stormwater Permit‏‎ (4 revisions)
  226. PART VI. Stormwater Management Program Assessment, Reporting and Other Submittals‏‎ (4 revisions)
  227. Construction stormwater best management practice – Dewatering and Basin Draining‏‎ (4 revisions)
  228. Small scale erosion control‏‎ (4 revisions)
  229. Stormwater Harvesting and Use Component Checklist and Cost Units‏‎ (4 revisions)
  230. Pollutant concentrations for stormwater BMPs‏‎ (4 revisions)
  231. Wet swale pollutant load reduction‏‎ (4 revisions)
  232. Protecting Water Quality in Urban Areas: Best Management Practices for Dealing with Storm Water Runoff from Urban, Suburban, and Developing Areas of Minnesota‏‎ (4 revisions)
  233. Summary of Construction Cost Data Collected‏‎ (4 revisions)
  234. Stormwater filtration BMPs – selection considerations‏‎ (4 revisions)
  235. Stormwater filtration practice (media filters; includes sand filters, peat mixed with sand, and other) outflow concentrations and pollutant removals‏‎ (4 revisions)
  236. Cost estimate worksheets‏‎ (4 revisions)
  237. Green infrastructure and green stormwater infrastructure terminology‏‎ (4 revisions)
  238. Example O&M plans, checklists, reports, and maintenance agreements for stormwater and rainwater harvest and use/reuse practices‏‎ (4 revisions)
  239. Questions and answers January 9 2018 webinar‏‎ (4 revisions)
  240. Filtration tables combined‏‎ (4 revisions)
  241. Harvested stormwater site survey and information worksheet‏‎ (4 revisions)
  242. Pathogen types and examples‏‎ (4 revisions)
  243. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Water treatment facilities (water supply)‏‎ (4 revisions)
  244. Removal of metals by lime sludge (spent lime) used for water softening‏‎ (4 revisions)
  245. TSS and TP EMC literature values for TMDL modeling‏‎ (4 revisions)
  246. Compost Specifications‏‎ (4 revisions)
  247. Overview of common plans for the green stormwater infrastructure planning process‏‎ (4 revisions)
  248. Construction stormwater best management practice – Sediment controls on linear utility projects‏‎ (5 revisions)
  249. BMP pollutant removal for bacteria‏‎ (5 revisions)
  250. Construction stormwater best management practice – Linear Utility Projects‏‎ (5 revisions)
  251. Stormwater step pool construction inspection checklist‏‎ (5 revisions)
  252. Surface sand filter cost estimate worksheet‏‎ (5 revisions)
  253. Fact sheet on stormwater guidance for solar farm projects‏‎ (5 revisions)
  254. Fact sheet‏‎ (5 revisions)
  255. Unit costs related to riprap‏‎ (5 revisions)
  256. Expected performance for storm drain inlet protection‏‎ (5 revisions)
  257. Social benefits of Green Stormwater Infrastructure‏‎ (5 revisions)
  258. Pretreatment pollutant removal characteristics - all devices‏‎ (5 revisions)
  259. Green Infrastructure planning checklist‏‎ (5 revisions)
  260. 2020 MS4 General Permit Section 9 Application for Reissuance‏‎ (5 revisions)
  261. Minimal Impact Design Standards (MIDS) Implementation Case Study: City of White Bear Lake‏‎ (5 revisions)
  262. TCMA Chloride TMDL - Public Participation‏‎ (5 revisions)
  263. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Policy makers‏‎ (5 revisions)
  264. Damage costs per ton of road salt‏‎ (5 revisions)
  265. Resources for Cities, Townships, Counties, and WMOs/WDs‏‎ (5 revisions)
  266. Infiltration as a stormwater management practice‏‎ (5 revisions)
  267. Recommended practices for a water quality-targeted street sweeping program‏‎ (5 revisions)
  268. Infiltration design guideline - maximum flow path‏‎ (5 revisions)
  269. Primary cost components for stormwater wetlands‏‎ (5 revisions)
  270. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Citizens‏‎ (5 revisions)
  271. 2017 MS4 Technical Assistance and Outreach Needs Survey Results‏‎ (5 revisions)
  272. Acknowledgements for construction stormwater‏‎ (5 revisions)
  273. Stormwater Utility Fee: City of Saint Peter‏‎ (5 revisions)
  274. Stormwater Steering Committee‏‎ (5 revisions)
  275. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Implementation strategies‏‎ (5 revisions)
  276. Lbs per 1000 sq ft to lps per lane mile conversion‏‎ (5 revisions)
  277. Cumulative percent storm rainfall Bulletin 71‏‎ (5 revisions)
  278. NOAA Atlas 14 recurrence intervals and storm durations‏‎ (5 revisions)
  279. Average Bid trafficker Prices for Spec Year 2014‏‎ (5 revisions)
  280. Crown distance scoring system‏‎ (5 revisions)
  281. Overview and schedule of general maintenance activities for permeable pavement practices‏‎ (5 revisions)
  282. Summary of quantities - stormwater step pool case study‏‎ (5 revisions)
  283. Wet swale materials specifications‏‎ (5 revisions)
  284. MS4 Illicit discharge discoveries and reports tracking template‏‎ (5 revisions)
  285. Mulch types application rates benefits, and limitations‏‎ (5 revisions)
  286. Pretreatment practices combined single page‏‎ (5 revisions)
  287. TCMA Chloride Management Plan - TCMA Chloride Conditions - TMDL summary‏‎ (5 revisions)
  288. Engineers estimate for installation of one 1,500 gallon aboveground corrugated steel storage tank‏‎ (5 revisions)
  289. Industrial prevention practices for TSS‏‎ (5 revisions)
  290. Links for stormwater and rainwater harvest and use/reuse‏‎ (5 revisions)
  291. Calculating credits for high-gradient stormwater step-pool swale‏‎ (5 revisions)
  292. General WinSLAMM result QAQC list‏‎ (5 revisions)
  293. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Citizen attitudes and practices‏‎ (5 revisions)
  294. Common problems and how to troubleshoot them for wetlands‏‎ (5 revisions)
  295. Stormwater wetland outflow concentrations and pollutant removals‏‎ (5 revisions)
  296. Cold climate plant materials of the upper midwest with known salt tolerance, listed from wet to dry soil moisture‏‎ (5 revisions)
  297. Recommended contributing drainage area for infiltration BMPs‏‎ (5 revisions)
  298. Stormwater blogs‏‎ (5 revisions)
  299. Example O&M plans, checklists, reports, and maintenance agreements for green roofs‏‎ (5 revisions)
  300. Chloride reduction case study: The Promenade of Wayzata‏‎ (5 revisions)
  301. Subwatershed and channel characteristics‏‎ (5 revisions)
  302. Links to .dwg files for swales‏‎ (5 revisions)
  303. Minimum water quality for rainwater catchment systems‏‎ (5 revisions)
  304. Table 2575-4 Required Corrective Action‏‎ (5 revisions)
  305. NPDES Source Permits by Lake‏‎ (5 revisions)
  306. Training programs and print materials for Minimum Control Measure (MCM) 4‏‎ (5 revisions)
  307. Contech Jellyfish Filter‏‎ (5 revisions)
  308. Detailed information on specific models‏‎ (5 revisions)
  309. Construction stormwater best management practice – Forest road exemption‏‎ (5 revisions)
  310. TSS credits for street sweeping‏‎ (5 revisions)
  311. Soils with low P-Index‏‎ (5 revisions)
  312. Dry swale system with underdrain parameters‏‎ (5 revisions)
  313. Common problems and how to troubleshoot them for tree trenches and tree boxes‏‎ (5 revisions)
  314. MnDOT specifications for granular filter material under Class I random riprap‏‎ (5 revisions)
  315. Supporting material for infiltration‏‎ (5 revisions)
  316. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Chloride reduction strategy‏‎ (5 revisions)
  317. Common roofing materials and water quality considerations‏‎ (5 revisions)
  318. Construction stormwater photo gallery - Outlet energy dissipation‏‎ (5 revisions)
  319. Cost-benefit considerations for sand (media) filters‏‎ (5 revisions)
  320. Dry swale materials specifications‏‎ (5 revisions)
  321. Pond design sizing criteria‏‎ (5 revisions)
  322. Fructification scoring system‏‎ (5 revisions)
  323. Links to .dwg files for bioretention and infiltration‏‎ (5 revisions)
  324. Typical inspection/maintenance frequencies for stormwater wetlands‏‎ (5 revisions)
  325. BMP pollutant removal for hydrocarbons‏‎ (5 revisions)
  326. Minimum Water Quality‏‎ (5 revisions)
  327. Qualitative and quantitative evaluation and assessment of trees‏‎ (5 revisions)
  328. Literature review summary for Unified Sizing Criteria‏‎ (5 revisions)
  329. Perimeter control‏‎ (5 revisions)
  330. MnDOT approved - qualified hydraulic mulch products‏‎ (5 revisions)
  331. Check dam materials specifications‏‎ (5 revisions)
  332. Stormwater filtration BMPs - overview‏‎ (5 revisions)
  333. Summary of water reuse criteria for select nonpotable applications from reuse programs from several states‏‎ (5 revisions)
  334. Average turf reinforcement mats bid prices for Spec Year 2014‏‎ (5 revisions)
  335. Stormwater Harvest and Use Funding Sources‏‎ (5 revisions)
  336. Unified sizing criteria section‏‎ (5 revisions)
  337. Check dam inspection checklist‏‎ (5 revisions)
  338. Acknowledgements for Green Stormwater Infrastructure (GSI) and sustainable stormwater management‏‎ (5 revisions)
  339. Biofiltration - Raingardens data table‏‎ (5 revisions)
  340. Step 2 Calibration Chart for auger or conveyor systems‏‎ (5 revisions)
  341. Processes utilized by Best Management Practices - Constructed Basins‏‎ (5 revisions)
  342. Owner Responsibilities Under the Construction Stormwater Permit‏‎ (5 revisions)
  343. Typical maintenance problems and activities for dry swales‏‎ (5 revisions)
  344. Illicit Discharge Detection and Elimination (IDDE): City of Mankato‏‎ (5 revisions)
  345. Assessing the performance of high-gradient stormwater step-pool swale‏‎ (5 revisions)
  346. Summary of Annual Maintenance Cost Data Collected‏‎ (5 revisions)
  347. Calculating credits for sand (media) filters‏‎ (5 revisions)
  348. Potential biochar stormwater applications‏‎ (5 revisions)
  349. Reported Activities that Restore or Decrease Soil Bulk Density‏‎ (5 revisions)
  350. Fact sheets for green roofs‏‎ (5 revisions)
  351. Aaron test mcm 3‏‎ (5 revisions)
  352. Tree trench/box photo gallery‏‎ (5 revisions)
  353. Temporary Sediment Control - Corrective Actions‏‎ (5 revisions)
  354. Updates to credits and pollutant removal values‏‎ (5 revisions)
  355. TCMA Chloride TMDL - Reasonable Assurance‏‎ (5 revisions)
  356. Aaron test mcm 2‏‎ (5 revisions)
  357. Minnesota Stormwater Manual emails‏‎ (5 revisions)
  358. High Risk Lakes in the TCMA‏‎ (5 revisions)
  359. Export to pdf‏‎ (5 revisions)
  360. MS4 Summary for Bennett Lake‏‎ (5 revisions)
  361. Air quality benefits of Green Stormwater Infrastructure‏‎ (5 revisions)
  362. Overview and schedule of general maintenance activities for swales‏‎ (5 revisions)
  363. Why is a municipality regulated under the MS4 permit?‏‎ (5 revisions)
  364. Photo gallery for pretreatment‏‎ (5 revisions)
  365. Stormwater reuse for irrigation - preliminary modeling analysis‏‎ (5 revisions)
  366. Expected performance for erosion control blankets‏‎ (6 revisions)
  367. Potential evapotranspiration for Minneapolis-St. Paul from 2001-2010‏‎ (6 revisions)
  368. TCMA Chloride TMDL - Executive Summary‏‎ (6 revisions)
  369. Typical maintenance problems and activities for wet swales‏‎ (6 revisions)
  370. Rainfall volume-frequency maps‏‎ (6 revisions)
  371. Dry swale construction inspection checklist‏‎ (6 revisions)
  372. Construction stormwater best management practice – Untreated Stormwater Runoff to Lakes, Streams, and Wetlands‏‎ (6 revisions)
  373. Processes utilized by Best Management Practices - Filters‏‎ (6 revisions)
  374. Processes utilized by Best Management Practices - Storage and Reuse‏‎ (6 revisions)
  375. Average Bid Prices Storm drain for spec year 2014‏‎ (6 revisions)
  376. BMP pollutant removal for total suspended solids‏‎ (6 revisions)
  377. Manufactured treatment devices‏‎ (6 revisions)
  378. High Risk Streams in the TCMA‏‎ (6 revisions)
  379. Example sizing information for riprap energy dissipators at culvert outlets‏‎ (6 revisions)
  380. Supporting material for green roofs‏‎ (6 revisions)
  381. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Winter maintenance professionals (state, county, city, schools, parks, private)‏‎ (6 revisions)
  382. Wet swale - Recommended Short Term (3-Year) Maintenance Schedule for Carpenter Creek project‏‎ (6 revisions)
  383. Stormwater infiltration BMPs – selection considerations‏‎ (6 revisions)
  384. Post-Storage Treatment Process Considerations‏‎ (6 revisions)
  385. Dry swale operation and maintenance checklist‏‎ (6 revisions)
  386. Expected performance for outlet energy dissipators‏‎ (6 revisions)
  387. Bioretention device cost estimate worksheet‏‎ (6 revisions)
  388. Summary of TMDL and Components for Impaired Streams in the TCMA‏‎ (6 revisions)
  389. MIDS calculator comparisons‏‎ (6 revisions)
  390. Conversion units‏‎ (6 revisions)
  391. Filtration data table‏‎ (6 revisions)
  392. Lessons learned and advice from street sweeping programs‏‎ (6 revisions)
  393. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Municipalities‏‎ (6 revisions)
  394. Stormwater step pool operation and maintenance checklist‏‎ (6 revisions)
  395. 2013 MS4 General Permit‏‎ (6 revisions)
  396. Examples of RUSLE practice management factors for construction sites‏‎ (6 revisions)
  397. Check dam related average Bid Prices‏‎ (6 revisions)
  398. 2020 MS4 General Permit Section 15 Minimum Control Measures (MCMs)‏‎ (6 revisions)
  399. Unit processes of stormwater treatment techniques - filtration practices‏‎ (6 revisions)
  400. Summary of street sweeping tracking methodologies‏‎ (6 revisions)
  401. Typical maintenance problems for infiltration trenches and basins‏‎ (6 revisions)
  402. Anti-icing application rates‏‎ (6 revisions)
  403. Typical maintenance problems and activities for stormwater step pools‏‎ (6 revisions)
  404. Summary of TMDL and Components for Impaired Lakes and Wetlands in the TCMA‏‎ (6 revisions)
  405. Pretreatment - Filtration devices and practices‏‎ (6 revisions)
  406. 2020 MS4 General Permit Section 11 Existing Permittee Applicants‏‎ (6 revisions)
  407. Step 4 Calibration Chart for auger or conveyor systems‏‎ (6 revisions)
  408. Open vegetated swale materials specifications‏‎ (6 revisions)
  409. Specific yields for geologic materials‏‎ (6 revisions)
  410. Performance-Based Chloride Reduction Strategies‏‎ (6 revisions)
  411. MnDOT specifications for geotextile under riprap‏‎ (6 revisions)
  412. Acknowledgements for dry swale‏‎ (6 revisions)
  413. Summary of Chesapeake Bay Program street sweeping crediting‏‎ (6 revisions)
  414. BMP pollutant removal for total nitrogen‏‎ (6 revisions)
  415. Pond stage / storage‏‎ (6 revisions)
  416. Example spreadsheet - Cumulative volume above normal surface elevation‏‎ (6 revisions)
  417. Stormwater infiltration BMPs - overview‏‎ (6 revisions)
  418. Construction stormwater best management practice – Stormwater Model Ordinances‏‎ (6 revisions)
  419. Event mean concentrations by land use‏‎ (6 revisions)
  420. Excerpt from Table 10. Strategies and actions proposed for the Coon Creek subwatershed‏‎ (6 revisions)
  421. Infiltration photo gallery‏‎ (6 revisions)
  422. Design considerations for green stormwater infrastructure best management practices‏‎ (6 revisions)
  423. WinSLAMM control practice summary‏‎ (6 revisions)
  424. Maximum Detention Time - Average Daily Temperature‏‎ (6 revisions)
  425. Runoff coefficients by land use and soil type‏‎ (6 revisions)
  426. Sediment Dewatering and Disposal Case Study: City of Eden Prairie Timber Creek Townhomes Stormwater Pond Sediment Removal and Disposal‏‎ (6 revisions)
  427. Construction stormwater best management practice – Preventing further damage after floods‏‎ (6 revisions)
  428. Summary of TMDL (lbs/day) and Components for Impaired Streams in the TCMA‏‎ (6 revisions)
  429. Summary of sate of Minnesota water quality guidelines for stormwater harvesting and reuse systems for Irrigation‏‎ (6 revisions)
  430. Water‏‎ (6 revisions)
  431. Urban Stormwater Quality Characteristics from Paved Surfaces‏‎ (6 revisions)
  432. Case studies for Smart Salting (S2) and road salt winter maintenance‏‎ (6 revisions)
  433. Screening and straining devices - system design information‏‎ (6 revisions)
  434. 2020 MS4 General Permit Section 13 Stormwater Pollution Prevention Program (SWPPP)‏‎ (6 revisions)
  435. Processes utilized by Best Management Practices - Manufactured Devices‏‎ (6 revisions)
  436. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Minnesota Pollution Control Agency‏‎ (6 revisions)
  437. Calibration chart for gravity flow equipment‏‎ (6 revisions)
  438. Pond, lake, and wetland inventory‏‎ (6 revisions)
  439. Filtration - system and component sizing‏‎ (6 revisions)
  440. Temporary Sediment Control: Corrective Actions - check damns‏‎ (6 revisions)
  441. Examples of Municipal and Private Cost Savings‏‎ (6 revisions)
  442. Construction stormwater photo gallery - Storm drain inlet protection‏‎ (6 revisions)
  443. Description of street sweeping disposal options‏‎ (6 revisions)
  444. Stormwater Pollutants Associated With Common Operations at Potential Stormwater Hotspots‏‎ (6 revisions)
  445. Summary of inspection and maintenance activities for check dams‏‎ (6 revisions)
  446. Peak discharge (cfs) during a wet year (2002)‏‎ (6 revisions)
  447. Design restrictions for special waters - constructed ponds and wetlands‏‎ (6 revisions)
  448. Comparison of precipitation totals from TP-40, Bulletin 71, and Atlas 14‏‎ (6 revisions)
  449. Links to information and guidance on stormwater infiltration at contaminated sites‏‎ (6 revisions)
  450. Infiltration design guideline - drawdown time‏‎ (6 revisions)
  451. Characteristics of quicklime and hydrated lime‏‎ (6 revisions)
  452. Using WinSLAMM to generate load reduction and WLA reporting terms‏‎ (6 revisions)
  453. Links for pretreatment‏‎ (6 revisions)
  454. Expected performance for check dams‏‎ (6 revisions)
  455. TCMA Chloride TMDL - Impaired and High Risk Waterbodies by Location‏‎ (6 revisions)
  456. Neat websites and articles for trees‏‎ (6 revisions)
  457. Common problems and how to troubleshoot them for Stormwater and Rainwater Harvest and Use/Reuse Practices‏‎ (6 revisions)
  458. Itemized stormwater harvest and use system component costs‏‎ (6 revisions)
  459. Supporting material for pretreatment‏‎ (6 revisions)
  460. Construction stormwater photo gallery - Sediment basins and traps‏‎ (6 revisions)
  461. Seed mixture selection and other information for various construction site stabilization periods‏‎ (6 revisions)
  462. Salt - Sand yard to ton conversions‏‎ (6 revisions)
  463. Concentrations of TP, OP, and DP for four mtds and Minnesota runoff‏‎ (6 revisions)
  464. About the Minnesota Stormwater Manual‏‎ (6 revisions)
  465. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Watershed management organizations and districts and Soil and Water Conservation Districts‏‎ (6 revisions)
  466. Summary of stormwater credits function‏‎ (6 revisions)
  467. Classification of receiving waters used in this manual‏‎ (6 revisions)
  468. Summary of pollutant removal efficiencies in wet stormwater ponds/stormwater wetlands‏‎ (6 revisions)
  469. Chemical and physical properties of coir‏‎ (6 revisions)
  470. Expected performance for temporary diversion barrier controls‏‎ (6 revisions)
  471. Aaron test mcm 4‏‎ (6 revisions)
  472. Acknowledgements for permeable pavement‏‎ (6 revisions)
  473. Screening and straining devices - system and component sizing‏‎ (7 revisions)
  474. Infiltration design guideline - Observation well‏‎ (7 revisions)
  475. Common pollutants of concern and sources in stormwater runoff‏‎ (7 revisions)
  476. MnDOT approved/qualified hydraulic erosion prevention/control products‏‎ (7 revisions)
  477. Summary of infiltration practices for given drainage areas‏‎ (7 revisions)
  478. Pretreatment tables‏‎ (7 revisions)
  479. Top 10 reasons to plant pollinator friendly vegetation at your solar site‏‎ (7 revisions)
  480. Examples of RUSLE cover management factors for construction sites‏‎ (7 revisions)
  481. Acknowledgements for Stormwater and rainwater harvest and use/reuse‏‎ (7 revisions)
  482. Curve numbers for urban and agricultural areas‏‎ (7 revisions)
  483. Examples of BMP selection options for various construction site risk conditions‏‎ (7 revisions)
  484. External resources for Infiltration basin‏‎ (7 revisions)
  485. Examples of potential exposure types and pathways‏‎ (7 revisions)
  486. MPCA Simple Estimator runoff coefficient and pollutant event mean concentration (EMC) values‏‎ (7 revisions)
  487. TCMA Chloride Management Plan - Prioritizing and Implementing Restoration and Protection - Prioritization and critical areas‏‎ (7 revisions)
  488. Dakota County plow driver survey‏‎ (7 revisions)
  489. Case study for using WINSLAMM to meet TMDL permit requirements‏‎ (7 revisions)
  490. Typical winter decommission and maintenance tasks‏‎ (7 revisions)
  491. Measuring Behavioral Change: East Metro Water Resource Education Program (EMWREP)‏‎ (7 revisions)
  492. Supporting material for iron enhanced sand filter‏‎ (7 revisions)
  493. Methods for calculating pollutant reductions for street sweeping‏‎ (7 revisions)
  494. Cloquet - using technology and spreadsheets to efficiently manage the MS4 program‏‎ (7 revisions)
  495. Miscellaneous maps‏‎ (7 revisions)
  496. Comparison of properties of different types of storage tanks‏‎ (7 revisions)
  497. Expected performance for temporary/permanent sediment traps and basins‏‎ (7 revisions)
  498. Typical maintenance problems and activities for infiltration practices‏‎ (7 revisions)
  499. Aaron test mcm 6‏‎ (7 revisions)
  500. Processes utilized by Best Management Practices - Swales and Strips‏‎ (7 revisions)

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)